- Solicitation number
- 26-B-28SR
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Form C-2014, ITB No. 25-B-##XX) required by the County of Volusia, Department of Public Works for the Taylor Road Bridge Rehabilitation project in Port Orange, Florida. The form mandates that all bidders submit a complete listing of proposed subcontractors for the project, which involves fabrication and installation of a crutch bent to remove weight restrictions from Bridge No. 794009 over Spruce Creek. Bidders must identify all subcontractors by discipline, including anticipated categories such as Electrical, HVAC, Plumbing, Landscaping, Maintenance of Traffic, and Structural Load Testing, along with any additional disciplines required. The Prime Contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project completion require prior written approval from the County Project Manager. Failure to complete and return the form may result in a non-responsive bid determination.
The form requires bidders to allocate the total bid price across the Prime Contractor and all subcontractors, with each entity assigned a specific dollar value and corresponding percentage of work performed. The dollar values and percentages must be entered in green-shaded cells, while all other cells calculate automatically, with the total percentage of work equaling 100 percent. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. The form also serves to determine local preference in accordance with Section 2.8, D of the solicitation. Bidders must bid on all items to be considered responsive, and the contractor selected shall be responsible for all labor, materials, equipment, permitting, traffic control, functional checks, operations and maintenance manuals, and as-built surveys and drawings necessary to complete the project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| Maintenance of Traffic | $ - 0 | 0.00% | ||||
| Structural Load Testing | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |