5.Bid_Price_Sheet_Taylor_Rd_Bridge_794009_Rehab.xls

XLS spreadsheet 38 KB Posted

Attached to
Taylor Road Bridge Rehabilitation (Bridge #794009 over Spruce Creek)
Solicitation number
26-B-28SR
Issued by
Volusia County, Florida

About this file

This is a Bid Price Sheet for a bridge rehabilitation project issued by the County of Volusia, Department of Public Works, Road & Bridge Division in Florida. The project involves the rehabilitation of Taylor Road Bridge (Bridge No. 794009) spanning Spruce Creek in Port Orange, Florida. The scope of work includes fabrication and installation of a crutch bent structure to remove weight restriction posting on the bridge. The project encompasses 22 line items covering mobilization, maintenance of traffic, environmental protection (floating turbidity barriers), structural inspection and monitoring, site clearing, channel excavation, concrete and steel work for bridge substructure, pile installation and testing, structural steel components, drainage systems, riprap and bedding materials, and filter fabric installation. The contractor is responsible for all permitting, labor, materials, equipment, tools, transportation, traffic control, functional checks, operation and maintenance manuals, and as-built documentation necessary to complete the work as specified in the contract documents.

The bid price sheet presents estimated quantities for each line item but contains no populated unit prices or total costs, indicating this is a blank template for bidder completion. All quantities are noted as provided for contractor convenience and are not guaranteed to be complete, requiring bidders to conduct their own estimating and assume full responsibility for sizing, quantity determination, and material specifications. Bidders must submit bids on all items to be considered responsive and are required to include performance and payment bonds as a contract requirement. The contractor must provide a complete, turnkey project with all associated services, removals, and disposals necessary for installation of the fabric-formed concrete revetment and bridge improvements.

View the file

Other files

File Type Posted
Taylor_Road_Bridge_Rehabilitation_(Bridge_#794009_over_Spruce_Creek).pdf PDF
Exhibit_H,_SJWRMD_Permit,_26-B-28SR.pdf PDF
Exhibit_G,_ACOE_VerificationLetter,_26-B-28SR.pdf PDF
Exhibit_F,_General_Notes_Supplement,_26-B-28SR.pdf PDF
Exhibit_E,_Construction_Plans,_26-B-28SR.pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-28SR.pdf PDF
Exhibit_C,_Required_Bid_Documents,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).pdf PDF
Exhibit_C,_PRIME-SUB_FORM,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls XLS spreadsheet
Exhibit_C,_Insurance_Requirements,_26-B-28SR_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls XLS spreadsheet
Exhibit_B,_Special_Conditions,_26-B-28SR.pdf PDF
Exhibit_A,_General_Conditions,_26-B-28SR.pdf PDF
C2062,_Construction_Contract,_26-B-28SR_(REVIEW).pdf PDF
Attachment_A,_Scope_of_Work_and_General_Notes,_26-B-28SR_(REVIEW).pdf PDF
6.ACOE_Taylor_Rd_Bridge_20250930_NWP_Verification_Letter_SAJ-2025-02491.pdf PDF
4.Construction_Plans_Taylor_Rd_Bridge_No._794009_Submittal_2025_11_04.pdf PDF
3.General_Notes_Supplement_Taylor_Rd_Bridge_No_794009.pdf PDF
7.SJWRMD_Taylor_Rd_Bridge_General_Permit_240910-1.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(1).xls XLS spreadsheet
2.Scope_of_Work_and_General_Notes_Taylor_Rd_Bridge_No_794009.pdf PDF
1.Construction_Bid_Request_Taylor_Rd_Bridge_Rehab.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITB No. ______
Taylor Road Bridge Rehabilitation (Bridge No. 794009 over Spruce Creek)
Bid Price Sheet
LINE ITEMFDOT ITEM NUMBERITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICETOTAL
10101- 1-MOBILIZATIONLS1$ - 0$ - 0
20102- 1-MAINTENANCE OF TRAFFICED90$ - 0$ - 0
3104-11FLOATING TURBIDITY BARRIERLF229$ - 0$ - 0
4108-1MONITOR EXISTING STRUCTURES - INSPECTION AND SETTLEMENTEA1$ - 0$ - 0
5110-1-1CLEARING & GRUBBINGAC0.03$ - 0$ - 0
6120-5CHANNEL EXCAVATIONCY148$ - 0$ - 0
7400-4-5CONCRETE CLASS IV, BRIDGE SUBSTRUCTURECY14$ - 0$ - 0
8400-147COMPOSITE NEOPRENE PADSCF0.7$ - 0$ - 0
9400-153NON-SHRINK GROUT - MISCELLANEOUSCF2$ - 0$ - 0
10415-1-5REINFORCING STEEL - BRIDGE SUBSTRUCTURELB2405$ - 0$ - 0
11455-20-1PILE INSPECTION, DRIVEN PILEEA6$ - 0$ - 0
12455-35STEEL PILING, HP 14X102LF210$ - 0$ - 0
13455-115PILE REDRIVEEA2$ - 0$ - 0
14455-137LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSISEA6$ - 0$ - 0
15455-137-2LOAD TEST (DYNAMIC), VERIFICATION TESTEA2$ - 0$ - 0
16455-144-7TEST PILES - STEEL, HP 14X102LF100$ - 0$ - 0
17460-2-20STRUCTURAL STEEL - WEATHERINGLB32204$ - 0$ - 0
18506-2BRIDGE DRAIN PIPELF6$ - 0$ - 0
19530-3-4RIPRAP-RUBBLE, DITCH AND LININGTN157$ - 0$ - 0
20530-74BEDDING STONETN56$ - 0$ - 0
21920-530FILTER POINT FABRIC FORMED MATSY248$ - 0$ - 0
22PERFORMANCE AND PAYMENT BONDLS1$ - 0$ - 0
TOTAL LUMP SUM BID:$ - 0
Notes: All quantities are given for the convenience of the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for estimating the size, kind, and quantity of materials and equipment included in work to be done under the terms of the Contract.