Exhibit_C,_PRIME-SUB_FORM,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls

XLS spreadsheet 38 KB Posted

Attached to
Taylor Road Bridge Rehabilitation (Bridge #794009 over Spruce Creek)
Solicitation number
26-B-28SR
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit C) for Volusia County, Department of Public Works, Road & Bridge Division, for the Taylor Road Bridge Rehabilitation project (Bridge #794009 over Spruce Creek) located in Port Orange, Florida, identified as ITB No. 26-B-28SR and Contract No. C2062. Bidders are required to complete and submit this form with their bid to be considered responsive. The form mandates that all prime contractors and subcontractors be listed with their respective work scopes and dollar values. The project scope includes fabrication and installation of a crutch bent to remove weight restriction posting, fabric formed concrete revetment installation, traffic control, functional checks, operations and maintenance manuals, and as-built surveys and drawings. All bidders must submit bids on all items to qualify as responsive, and the prime contractor bears responsibility for ensuring all subcontractors hold appropriate licenses and for obtaining County Project Manager approval before making any changes to proposed subcontractors during project completion.

The form requires bidders to allocate the total bid price between the prime contractor and all proposed subcontractors, with designated disciplines including general work, maintenance of traffic, and structural load testing. All dollar values and percentages of work must be completed in the green-shaded cells, with the total allocation equaling 100 percent. The County reserves the right to seek clarification on subcontractors but will not permit changes to the total submitted base bid pricing. Local bid preference considerations apply in accordance with Section 2.8, D of the solicitation documents. The form emphasizes that failure to complete and return this exhibit may result in a non-responsive bid determination.

View the file

Other files

File Type Posted
Taylor_Road_Bridge_Rehabilitation_(Bridge_#794009_over_Spruce_Creek).pdf PDF
Exhibit_H,_SJWRMD_Permit,_26-B-28SR.pdf PDF
Exhibit_G,_ACOE_VerificationLetter,_26-B-28SR.pdf PDF
Exhibit_F,_General_Notes_Supplement,_26-B-28SR.pdf PDF
Exhibit_E,_Construction_Plans,_26-B-28SR.pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-28SR.pdf PDF
Exhibit_C,_Required_Bid_Documents,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-28SR_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet,_26-B-28SR_(SUBMIT_WITH_YOUR_BID).xls XLS spreadsheet
Exhibit_B,_Special_Conditions,_26-B-28SR.pdf PDF
Exhibit_A,_General_Conditions,_26-B-28SR.pdf PDF
C2062,_Construction_Contract,_26-B-28SR_(REVIEW).pdf PDF
Attachment_A,_Scope_of_Work_and_General_Notes,_26-B-28SR_(REVIEW).pdf PDF
6.ACOE_Taylor_Rd_Bridge_20250930_NWP_Verification_Letter_SAJ-2025-02491.pdf PDF
4.Construction_Plans_Taylor_Rd_Bridge_No._794009_Submittal_2025_11_04.pdf PDF
3.General_Notes_Supplement_Taylor_Rd_Bridge_No_794009.pdf PDF
7.SJWRMD_Taylor_Rd_Bridge_General_Permit_240910-1.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing)_(1).xls XLS spreadsheet
5.Bid_Price_Sheet_Taylor_Rd_Bridge_794009_Rehab.xls XLS spreadsheet
2.Scope_of_Work_and_General_Notes_Taylor_Rd_Bridge_No_794009.pdf PDF
1.Construction_Bid_Request_Taylor_Rd_Bridge_Rehab.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C2062ITB No. 26-B-28SR
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
Maintenance of Traffic$ - 00.00%
Structural Load Testing$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .