This is a Construction Bid Request form issued by Volusia County, Department of Public Works, Road & Bridge Division, for the Taylor Road Bridge Rehabilitation project (Bridge #794009 over Spruce Creek) in Port Orange, Florida. The project consists of fabrication and installation of a crutch bent to remove weight restriction posting on the bridge structure. The engineer's estimate for the project is $649,542.00. The contractor must complete substantial construction within 90 days and final work within 30 days, for a total contract duration of 120 days. Bidders are required to hold FDOT Prequalification in Bascule Bridge Rehabilitation. The County will obtain permits from SJRWMD, FDOT, Fish & Wildlife Commission, FDEP, and USACE, while the contractor must determine and obtain any additional permits as necessary. A field office/trailer is required on-site. The bid contract type is Unit Price with a line item spreadsheet to be submitted in Excel format. Performance and payment bonds are required due to the project exceeding the $200,000.00threshold mandated by Florida Statute. Liquidated damages are set at $1,685.00 per day for construction delays.
Bidders must submit all required documents in PDF format to OpenGov, including the completed Construction Bid Request form, scope of services, technical specifications, drawings/plans, copies of permits, and any other required documentation. The request was dated November 14, 2025, with the drawings and specifications prepared by an A/E firm assigned RSQ & TA #s 20-SQ-119SR, TA16, and PC3691. Project management is overseen by Lori Koontz and Robert Falk of the Road & Bridge Department (contact: 386-822-6422, ext. 20455). Funding is allocated through account numbers 103-750-9011-6530 for the project and 103-750-3000-4910 for legal advertisement. No grant funding is involved in this project. A pre-bid conference meeting was not marked as required for this bid opportunity.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 08/30/2024
CONSTRUCTION BID REQUEST
(Please complete this form and submit with the corresponding documents)
Request date 11/14/25
J:\R&B\WORK_SPACE\USERS\LKoontz\Bridges\794009 Taylor Rd over Spruce Creek\3.BIDDING\1.Construction Bid Request_Taylor Rd Bridge Rehab.docx
Project Title: Taylor Road Bridge Rehabilitation (Bridge #794009 over Spruce Creek)
Address and/or location of work: Taylor Road Bridge #794009 over Spruce Creek, Port Orange, FL
Is this project in your Capital Improvement Plan? Yes No
Engineer’s estimate: $649,542.00
Performance and payment bonds required?. Yes No (Florida Statute requires projects estimated at more than $200,000.00 to be bonded. For projects less than $200,000, bonding is at the department's discretion)
Time to bring construction to completion:
A. Substantial: 90 days B. Final: 30 days C. Total days (A+B): 120 days
Liquidated Damages (actual damages sustained due to delays): $ $1,685.00 per day
Contract type (check one): Unit Price (attach line item spread sheet in Excel) or Lump Sum
Any “Special Conditions” associated with this project? Yes No If yes, please list on a separate sheet.
What type of license is required from the bidder? FDOT Prequalification in Bascule Bridge Rehabilitation
What permits are to be obtained by the County? SJRWMD; FDOT; Fish & Wildlife Comm.; FDEP; OTHER: USACE
What permits are to be obtained by the contractor? BUILDING OTHER: contractor to determine;
none known
If a building permit is required, please state the jurisdiction for work: N/A
Are project signs required? Yes No If yes, number of signs:
Is a field office/trailer required? Yes No If yes, check one or both: Contractor Engineer.
If plans/drawings were developed by an A/E, what were the RSQ & TA #s assigned? 20-SQ-119SR, TA16, PC3691
Is there any I.T. work (cabling for networks, etc.) involved in this project? Yes No
Pre-bid conference meeting? Yes No Pre-bid location:
(Please contact the Contracts Manager if you would like a Mandatory pre-bid meeting.)
Please provide a list of all individuals required to be invited to the pre-bid meeting. Provide name and e-mail on a separate document.
Requesting Department/Division: Public Works / Road & Bridge
Dept./Division Project Manager: Lori Koontz & Robert Falk Phone #: 386-822-6422, ext.
20455
Account No. for legal advertisement: 103 - 750 - 3000 - 4910; Account No(s). for the Project: 103 - 750 - 9011 - 6530;
Is any Grant money involved? Yes No If yes, please explain any bid requirements of the Grant. Attach any documents that the bidders are required to sign. NOTE: It is the Project Manager’s responsibility to ensure that all of the Grant bidding requirements are communicated to the Purchasing Analyst.
Revised 08/30/2024
CONSTRUCTION BID REQUEST
(Please complete this form and submit with the corresponding documents)
Request date 11/14/25
J:\R&B\WORK_SPACE\USERS\LKoontz\Bridges\794009 Taylor Rd over Spruce Creek\3.BIDDING\1.Construction Bid Request_Taylor Rd Bridge Rehab.docx
REQUIRED DOCUMENTS: Please attach the following documents, in PDF format (except the Excel bid form, if applicable), to the intake form in OpenGov:
Completed Construction Bid Request form; scope of services; technical specifications; drawings/plans; copies of permits;
and any other documents required for this request.
| REQUIRED DOCUMENTS: Please attach the following documents, in PDF format |
| (except the Excel bid form, if applicable), to the intake form in OpenGov: |
| Completed Construction Bid Request form; scope of services; technical specifications; drawings/plans; copies of permits; and any other documents required for this request. |
File details come from the government source that posted it. Updated .