Portland International Airport Fire Protection Replacements
Open State & local contract opportunity Posted
- Solicitation number
- 148221
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Brandon Alius brandon.alius@portofportland.com (503) 415-6000
Opportunity details come from vendors.planetbids.com. Updated .
About this opportunity
The Port of Portland is soliciting bids for fire protection replacements at Portland International Airport (PDX 2026-2), with a pre-bid meeting via Microsoft Teams on November 23, 2026 at 2 p.m. and electronic bids due December 9, 2026 at 2 p.m. Bidders must register with the Oregon Construction Contractors Board before bidding and identify their resident bidder status under ORS 279A.120. Prequalification is not required, and neither the contractor nor subcontractor must be licensed for asbestos work under ORS 468A.720.
The work replaces pre-action sprinkler systems in the utility tunnel running north to south through the PDX terminal building and replaces several dry valves across the PDX campus. Drawings call for removing and replacing piping, sprinklers, and accessories to NFPA 13 compliance in tunnel zones T-S-UT-2-PA and T-N-UT-3-PA, replacing the pre-action cabinet with a double interlocked stacked valve assembly with compressor or a compliant double interlocked pre-action cabinet, and providing protection for electrical distribution routed through the tunnel. Dry-valve replacements occur at Building 9137, the ARFF building, the PDX maintenance facility, the South Cargo floor, and terminal riser rooms, with new spool sections provided as required. Substitution requests follow Port Specification Section 013300 and make the requesting contractor responsible for resulting redesign and construction costs. Work requires coordinated haul routes, federal security checkpoints for airfield access, and Port-assigned contractor parking, which is subject to daily change.
Prevailing wage rates set by the Oregon Bureau of Labor and Industries apply. Bid security of at least 10 percent of the total bid amount is payable to the Port of Portland, and the Port retains security for the three lowest responsive bidders until contract execution or bid expiration. Bidders must submit the First-Tier Subcontractor Disclosure Form within two working hours after bid opening and carry $1,000,000 per occurrence liability insurance plus workers' compensation coverage. Substantial completion is required within 170 days of the Notice to Proceed, with final completion within an additional 60 days. Liquidated damages are $500 per day for delays beyond the substantial completion date. Bids may not be revoked for 50 days after opening, and the Port will deliver a fully executed Agreement within 50 days of the bid deadline. The Port may disqualify bidders based on financial resources, licensing, insurance, integrity, or prior performance.
Project manager Andy Jeffrey is the designated Port contact. The Port's PlanetBids portal distributes solicitations by NIGP commodity code, so vendors must select the codes that match their work to receive this notice.
Files
Show all 17
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity