PDX 2026-2 (6) F1.02.pdf

PDF 359 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This file is a technical drawing for the Portland International Airport Fire Protection Replacements project in Oregon. The document is a floor plan sheet (F1.02) dated November 2026, prepared by registered professional engineer Anthony C. Lewellen and showing the Terminal South Floor Plans for fire protection systems. The drawing illustrates two zones requiring fire protection replacements: Zone T-S-UT-2-PA and Zone T-N-UT-3-PA, both located in utility tunnels beneath the terminal. The project involves removing existing fire protection pipes, sprinklers, and accessories from both zones and replacing them with NFPA 13-compliant systems, along with replacing the pre-action cabinet in Zone T-S-UT-2-PA with either a double interlocked stacked valve assembly with compressor or a new NFPA 13-compliant double interlocked pre-action cabinet. The drawing also indicates requirements to provide protection for electrical distribution routed through the tunnel, with the tunnel height approximately 5 feet 2 inches.

The drawing provides scaled floor plans with dimensional details and cross-references to related sheets and details. No pricing information, set-asides, incumbent contractors, funding sources, or other commercial terms are included in this technical document, which serves as a design reference for contractors bidding on or executing the fire protection replacement work at Portland International Airport.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

405 SF

PM

B

ELEV M

AC

H

P0145

248 SF

PM

B

ELEV M

AC

H

P0144

BABB

N

KEY PLAN

SCALE: N.T.S.

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:55:27 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\terminal tunnels.dwg

DISC. SHT. NO.

DRAWING SCALE IS RED8CED �0� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

TERMINAL SOUTH FLOOR PLANS - FIRE PROTECTION

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

6 CD

PDX 2026-2 F1.022024D035 103022

RE

GIS

TERED PROFESSIONAL

ANTHONY C. LEWELLEN

DECEMBER 0 9 , 20 13

EXP: 12/31/2026

OREGON

80671

ENGINEER

KEY NOTES :

1. REMOVE EXISTING FIRE PROTECTION PIPE,

SPRINKLERS AND ACCESSORIES ASSOCIATED

WITH ZONE T-S-UT-2-PA AND REPLACE WITH

NFPA 13 COMPLIANT SYSTEM.

2. REMOVE EXISTING FIRE PROTECTION PIPE,

SPRINKLERS AND ACCESSORIES ASSOCIATED

WITH ZONE T-N-UT-3-PA AND REPLACE WITH

NFPA 13 COMPLIANT SYSTEM.

3. REMOVE AND REPLACE PRE-ACTION CABINET

(T-S-UT-2-PA) WITH NFPA 13 COMPLIANT

DOUBLE INTERLOCKED STACKED VALVE

ASSEMBLY AND COMPRESSOR OR NEW NFPA

13 COMPLIANT DOUBLE INTERLOCKED

PRE-ACTION CABINET.

4. PROVIDE PROTECTION FOR ELECTRICAL

DISTRIBUTION ROUTED THROUGH THE

TUNNEL.

TUNNEL HEIGHT

APPROX. 5'

2 T-N-UT-3-PA

1T-S-UT-2-PA UP TO ELECTRICAL

ROOM T1192

ON DEPLANING LEVEL

F1.02

F8.02

PROJECT AREA

SCALE:

SOUTH TUNNEL FIRE PROTECTION PLAN

1/16" = 1'-0"1

SCALE:

DEPLANING FIRE PROTECTION PLAN

1-1/2" = 1'-0"2

N

T1TF33

(T1192)

ELECTRICAL

T1TF38

(T1194)

ELEC/MECH

M

AT

C H

L

IN

E

SE

E D

ET

AI

L 1, S H

EE

T

F1 .0

C

B

A

6 7 8

F8.02

F8.013

FROM UTILITY

TUNNEL

F1.02

BA AG AF AE AC A B C D E E' F G G' H H'AD

23.0'27.0'

.5

.5

.3

31.6' 38.0' 52.0' 8.0' 25.0' 30.0' 30.0' 30.0' 14.0' 15.2' 30.0' 9.8' 21.0' 23.0'

SCALE: IN FEET

0' 0'-8" 1'-4" 2'-8" 4'

N

SCALE: IN FEET

0' 8' 16' 32' 48'

2026-11-10T12:09:53-0800
Tony Lewellen

File details come from the government source that posted it. Updated .