PDX 2026-2 (11) F1.07.pdf
PDF 579 KB Posted
- Solicitation number
- 148221
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural floor plan document for the Portland International Airport (PDX) Fire Protection Replacements project in Oregon. The drawing depicts the ARFF (Aircraft Rescue and Firefighting) building floor plan, showing the layout of various operational and support spaces including apparatus workshops, dormitories, dispatch areas, training facilities, administrative offices, maintenance areas, and storage rooms. The plan is dated November 2026 and was designed by Tony Lewellen, a registered professional engineer in Oregon. The primary scope item identified is the replacement of a dry valve located in the ARFF building, with provisions for a new spool section as required to accommodate the installation.
The document provides detailed architectural specifications with a scale of 3/32" = 1'-0" and includes a key plan identifying the project area in relation to surrounding facilities such as police parking and operational parking areas. No pricing information, contract terms, set-asides, award dates, or bidding procedures are included in this architectural drawing. The document serves as a reference guide for the fire protection system replacement work at Portland International Airport and was prepared for construction design purposes.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4
J
H
G
F
4.9 5 6 8 7 9
C
E
D
9.5
A
B
MAINT/WASH
160 165
APPARATUS
WORKSHOP
AFFF STOR. SCBA
STOR
CUST.
CLEAN UP
APPARATUS
LAUNDRY
DAYROOM
LT. DORM
LAUNDRY
DISPATCH
TOILET
DORM
129 131
DORM
132 134 136 138
DORM DORM
DORM
133 135
DORM
DORM
CORR.
DORM
TELE.
CUST.
PATIO
DINING
DF
VEND.
KITCHEN
SHIFT PANTRIES
CUST
140c
SHOWER
LOBBY
WORKRM
PARAMEDIC
TOILET
STOR
STAIR
DRY STOR
TOILET
OFC
CORR.
CAPT.
CORR.
CONF/STUDY
CORR. 140a
144e
LAV
140b
TOILET
CLERICAL
REF. LIB.
TOILET
TOILET
CHIEF
VEST.
OFFICE
PHYS. TRAINING
TRAINING
A.V. STOR.
CORR.
108a
CORR.
OFFICE
UP
FUEL
STORAGE
GENERATOR
EMERGENCY
UP TO MEZZ.
STORAGE
CAPT.
DORM
DORM/
STOR.
INSPEC./
TRAIN
WOMENS
LOCKER
DORM/
STOR.
MENS
LOCKER
10/26/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
3:59:30 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\arff floor plan.dwg
DISC. SHT. NO.
DRAWING SCALE IS RED8CED 50� WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
FIRE PROTECTION REPLACEMENTS
ARFF FLOOR PLAN
TONY LEWELLEN
T. LEWELLEN
S. CIMINO
T. LEWELLEN
NOVEMBER 2026
11 CD
PDX 2026-2 F1.072024D035 103022
SCALE: IN FEET
0' 5'-4" 10'-8" 21'-4" 32'
N
SCALE:
ARFF FLOOR PLAN
3/32" = 1'-0"1
RE
GIS
TERED PROFESSIONAL
ANTHONY C. LEWELLEN
DECEMBER 0 9 , 20 13
EXP: 12/31/2026
OREGON
80671
ENGINEER
F8.02
F8.011
KEY NOTES :
1. REPLACE DRY VALVE LOCATED IN ARFF
BUILDING. PROVIDE NEW SPOOL SECTION AS
REQUIRED TO ACCOMMODATE INSTALLATION.
N
KEY PLAN
SCALE: N.T.S.
PROJECT AREA
C3
C5
C7
C9
C11
C13
C15
C17
C19
C21
C23
C22
C18
C16
C14
C 12
C10
C8
C6
D6
D8
D10
D12
D14
D15
D13
D11
D9
D7
D5
D3
E2
E3
E4
E5
POLICE
PARKING
OPS PARKING
POLICE
PARK
ING
O N L Y
LANE
ONLY
LANE
ONLY
LANE
ONLY LANE
ONLY
LANE
ONLY LANE
ONLY
LANEONLY
LANE
ONLY
POLICE PARKING
POLICE PARKING
14A
C20
CRDC
PORT
PORT
PORT
PORT
PORT
HSS
E6
ONLY
STOP
STOP
STOP
STOP
STOP
C23A
DELTAUS GOVTUS GOVTUS GOVT
US GOVT
US GOVT
THRU
THRU
THRU
THRU
THRU
THRU
THRU
THRU
C4
D4
AutoCAD SHX Text
UP
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
| 2026-11-10T12:12:48-0800 | |
| Tony Lewellen |
File details come from the government source that posted it. Updated .