PDX 2026-2 (9) F1.05.pdf

PDF 313 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This document is an architectural floor plan drawing for the Portland International Airport Fire Protection Replacements project in Oregon. The drawing depicts the PDX Maintenance Building's Bulk Storage and Vehicle Wash area at a scale of 1/16" = 1'-0". The project involves replacing a dry valve located at the PDX Maintenance Facility, with provisions for a new spool section as required to accommodate the installation. The drawing was designed by Tony Lewellen, drawn by T. Lewellen, and checked by S. Cimino in November 2026. The document indicates this is Sheet Number 9 (F1.05) of the overall project drawings, submitted as part of the fire protection replacement initiative for the airport's maintenance facility.

The drawing includes reference scales and graphic representations optimized for viewing and printing, with notes indicating that three different shading planes should be visible for proper document display. The registered professional engineer, Anthony C. Lewellen (Oregon License No. 80671), approved the design, with credentials expiring December 31, 2026. This technical document serves as construction documentation for the fire protection system upgrades at the maintenance building facility and would be utilized by contractors bidding on or executing the fire protection replacement work at Portland International Airport.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19'

18'

27111-201

17'

R' S' T' U V W X Y

24-06-005-06 F

CONV.

EOL

24-06-005-04

CONV.

24-06-005-05

CONV.

24-06-005-02

CONV.

24-06-005-03

CONV.

24-05-009

HRD

24-05-010

HRD

24-06-005-01

CONV.

24-05-141 24-05-142 24-05-143

24-03-136

24-03-137

24-03-138M

F

24-04-005

NO PARKING

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

3:10:07 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\pdx maintenance bldg.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED �0� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

PDX MAINTENANCE BUILDING BULK STORAGE & VEHICLE WASH FLOOR PLAN

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

9 CD

PDX 2026-2 F1.052024D035 103022

SCALE: IN FEET

0' 8' 16' 32' 48'

N

SCALE:

PDX MAINTENANCE BUILDING BULK STORAGE & VEHICLE WASH FLOOR PLAN

1/16" = 1'-0"1

RE

GIS

TERED PROFESSIONAL

ANTHONY C. LEWELLEN

DECEMBER 0 9 , 20 13

EXP: 12/31/2026

OREGON

80671

ENGINEER

F8.02

F8.011

KEY NOTES :

1. REPLACE DRY VALVE LOCATED AT PDX

MAINTENANCE FACILITY. PROVIDE NEW

SPOOL SECTION AS REQUIRED TO

ACCOMMODATE INSTALLATION.

N

KEY PLAN

SCALE: N.T.S.

PROJECT AREA

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text M

2026-11-10T12:11:43-0800
Tony Lewellen

File details come from the government source that posted it. Updated .