PDX 2026-2 (5) F1.01.pdf

PDF 1005 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This file is a set of architectural and engineering drawings for the Portland International Airport Fire Protection Replacements project in Oregon. The drawings depict terminal north floor plans related to fire protection system upgrades, specifically addressing Zone T-N-UT-3-PA in the terminal utility tunnel and the deplaning level areas. The project scope includes removal and replacement of existing fire protection piping, sprinklers, and accessories to achieve NFPA 13 compliance, along with replacement of the pre-action cabinet with either a new NFPA 13 compliant double interlocked stacked valve assembly with compressor or an alternative compliant pre-action cabinet. Additionally, the project requires provision of protection for electrical distribution routed through the tunnel. The drawings are dated November 2026 and include detailed floor plan layouts with dimensional annotations, cross-references to related sheets (F1.02, F8.01, F8.02), and scale notations for both the north tunnel fire protection plan (1/16" = 1'-0") and the deplaning fire protection plan (3/4" = 1'-0").

The drawings were prepared by Tony Lewellen, a registered professional engineer in Oregon (License No. 80671, expiring 12/31/2026), with design and checking performed by T. Lewellen and S. Cimino. The document serves as part of the construction documents for the fire protection system replacement project and contains technical specifications necessary for contractors to execute the work in compliance with applicable fire protection codes and standards.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

405 SF

PM

B

M

EC

H

P0115

246 SF

PM

B

ELEV M

AC

H R

M

P0114

SCALE: IN FEET

0' 0'-8" 1'-4" 2'-8" 4'

N

KEY PLAN

SCALE: N.T.S.

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:47:18 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\terminal tunnels.dwg

DISC. SHT. NO.

DRAWING SCALE IS RED8CED �0� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

TERMINAL NORTH FLOOR PLANS - FIRE PROTECTION

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

5 CD

PDX 2026-2 F1.012024D035 103022

RE

GIS

TERED PROFESSIONAL

ANTHONY C. LEWELLEN

DECEMBER 0 9 , 20 13

EXP: 12/31/2026

OREGON

80671

ENGINEER

M

AT

C H

L

IN

E

SE

E D

ET

AI

L 1, S H

EE

T

F1 .0

SCALE:

NORTH TUNNEL FIRE PROTECTION PLAN

1/16" = 1' - 0"1

UP TO MX QUICK RESPONSE SHOP

T1TN45 ON DEPLANING LEVEL

SCALE:

DEPLANING FIRE PROTECTION PLAN

3/4" = 1'-0"2

KEY NOTES :

1. REMOVE EXISTING FIRE PROTECTION PIPE,

SPRINKLERS AND ACCESSORIES ASSOCIATED

WITH ZONE T-N-UT-3-PA AND REPLACE WITH

NFPA 13 COMPLIANT SYSTEM.

2. REMOVE AND REPLACE PRE-ACTION CABINET

(T-N-UT-3-PA) WITH NFPA 13 COMPLIANT

DOUBLE INTERLOCKED STACKED VALVE

ASSEMBLY AND COMPRESSOR OR NEW NFPA 13

COMPLIANT DOUBLE INTERLOCKED

PRE-ACTION CABINET.

3. PROVIDE PROTECTION FOR ELECTRICAL

DISTRIBUTION ROUTED THROUGH THE TUNNEL.

MX QUICK

RESPONSE SHOP &

PARTS ROOM

T1TN45

(T1652)

F8.02

F8.01

1T-N-UT-3-PA

PROJECT AREA

N

F1.01

DOWN TO TUNNEL

F1.01

PAC BREAKROOM

T1TN38

L L' M N N' P R S T W V VVK WW TX TY ED DA

R

7 8

P

30.0'30.0' 21.0'

.1

.6

.2

9.8' 29.2' 16.0' 14.0' 30.0' 30.0' 30.0' 25.0' 9.5' 23.3' 45.0' 9.7'30.0' 10.7' 24.7' 45.0' 6.5

20.0'

SCALE: IN FEET

0' 8' 16' 32' 48'

N

2026-11-10T12:08:48-0800
Tony Lewellen

File details come from the government source that posted it. Updated .