Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This is a Haul Routes Plan for the Portland International Airport Fire Protection Replacements project located in Portland, Oregon. The drawing, dated November 2026 and prepared by registered professional engineer Anthony C. Lewellen, illustrates the designated haul routes and work areas for construction activities associated with terminal utility tunnel sprinkler replacements at the airport. The plan identifies multiple access points to the airfield via designated gates (NA-75, SA-17, NA-45, and SA-14) and indicates that federal security checkpoints are required for airfield access to project areas. The document specifies that access routes and employee parking areas must be coordinated with the Port of Portland prior to the start of construction, and notes that existing conditions shown are current as of the time of bid but subject to change based on ongoing airport construction activities.

The Port of Portland will provide contractor parking accommodations consisting of two vehicle spaces on the apron in the vicinity of the active work area and two additional spaces in the parking garage at Portland International Airport (PDX). The parking locations remain at the sole discretion of the Port and are subject to daily changes based on airport operational requirements. These designated parking spaces are in addition to the contractor employee parking area identified on the haul routes plan. The document emphasizes coordination requirements and operational constraints associated with conducting work within an active airport environment.

View the file

Other files

File Type Posted
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NE SKYPORT WAY

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

G G G

G

G

GGG

G

G

G

G

G

G

GG

G G

G

G

G G

G

G G

G

G G

G

G

G

G

G G G G G

G

G

G

G

G

G

G

G

G

G

G

G

G G G G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

R

R

R

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GGG

G

G

G G G

G G G

GG

G

G

GGGGGGGG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

GGGGGGG

GG

GGGGG

GGGG

G

G G G G G G G G G

G G G G G G

G G

G G G G G G G

G G G G

G

GG

G

G

G G

G

G

GG

G

G

G

G

G

G

G

G

G G G G

G

G

G

G

G

G

G

G

G

G

G

G G

G

GGGG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

G

G

G

G

G

G

G

G

G

GG

G

GG

G

GG

GG

G

G G

G

GG G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G sp

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

R

G

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G G

G G

G

G

G

G

G

G

G

G

G

G

G

G

R

R

GG

G

G sp

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GGG

G

G

G

G

G

G

GG

GG

G

G

R

G

G

G

G

G

G

G

G

G

G G G

GG G

G

G

G

G

G

G

G

G

G

G

GGGGGGG

G

G

G

G

G

G

G

G sp

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

RR

R

RRR

R

R

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

R

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

R GG

G

G

G

FP

GGG

GGG

G

GGG

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GGGGG

G

G

G

G

G

GG

GG

GG

GG

G

G

G

GGGGGG

G

G G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

GG

G

G

G

GG

GG

G

G

G

GG

G G

G G

G

G

G

G G

GG

G

G

G

G

G

G

G

G

G G G

G

G

G G

G

G

GGG

G

GG

G

G

G G

G

G

G

G

G

G

G

G

G

GG

G

GG

G G GGGGG

G

G

G

G

G

G

G

G

G

G

G

G

G

G G G

G G

G

G

G

G

G

G

G

G

GG

GG

G

G

G

G

GG

G

G

G

G

G

GG

G

G

G

G

G

G

G

GGG

G

GGG

GG

G G

G G

G

G

G

G

G

GGG

G

GG

G

G G G

GG

G

G G

G G

G G

G

G

G G

G

G

G

G

GGG

G

G

GG

GG

GG

GG

GG

GG

GG

GGGGG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

GG

G

G

G

G G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

R

R

R

R

R

R

R

R

R

R

R

R

R R

R

R

G G

GG

G

G G G

G

G

G

G

G

G

G

G

G

GGG

G G

G G

G G

G G

G G

GG

G G

G G

R

R

R

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

G

G

G

G

G

GG

GG

G

G

GG

G

G

GG

R

R

R

R

R

R

RR

RR

R

R

R

R

R

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

GG

GG

G

GG

G

G

G

G

G

G

G

GG

G

G

G

G G

G

G

GG

G

R

R

R

R

R

R

R

R

R

R

R

R

G

G

G

G

G

GG

G

G

GG

G

GG

GG

GG

GG

G

GG

GG

G

G

G

G G

G

GG

G

G G G

R

R

R

R

R

R

R

R

R

R

R

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

GG

G

G

G

G

G

G

G

G

GG

GG

GG

GG

GG

G

G

FP

FP FP

R

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

GG G G

G

G

G

G

G

G G

G

G

G

R

R R

R

R

R

FP

FPFP

G G G G G G

G G G G G G G G G G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GGGGGGGGGGG

GGGGGG

G

G

G

G

G

G

G

G

G

GGG

G

G

G

G

G

G

G

G G G

G G

G

G G G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

GG

G G

G

757-300W

TH

RU

LA

NE

O

NLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

THRU

LANE

ONLY

TH

RU

LA

N

E O

N

LY

TH

RU

LA

N

E O

N

LY

2 3 4 5

NE

C

A S

C A

D

ES

PKWY.

ALDERWOOD

SOUTH

CENTRAL

RAMP

C

B6

TAXIWAY C

RUNWAY 10R-28L

TAXIWAY B

TA

XI

W

AY

J

C

B5

TAXIWAY F

CENTRAL RAMP

E4

B3 B4

TA

XI

W

AY

E

PE

R

IM

ET

ER

R

O

AD

E5

E6

SOUTH RAMP

NE AIRTRANS W

AY

NE

RD.

PORTLAND INTERNATIONAL CENTER

NE CASCADES PKWY

N.

E.

M

T.

H

O O

D

AV

E.

CASCADE CORPORATE CENTER

N E M

T. ST. H

ELEN

S AVE

NE ALDERWOOD RD.

EAST ECONOMY PARKING LOT

ECONOMY PARKING LOT

COLFAX ST.

NE

GLASSNE 92ND DR.

PLANT

NE 87TH AVE.

HOLMAN ST.

NE 80TH AVE.

COLUMBIA BLVD.

NE 82ND AVE.

NE 79TH CT.

NE

A

LD

ER

W O

O D

R D.

NE CORNFOOT RD.

NE CULLY BLVD.

NE 66TH AVE.

NE 63RD AVE.

SLOUGH

COLUMBIA

BURNETT

SLOUGH

NE B

RYANT ST.

NE 59TH AVE.

ST.

NE E

LROD RD.

SW

RAMP

TAXIWAY C

PE

RI

M

ET

ER

R

D

TWY G

R U

N W

AYC3

C

10R

RUNWAY

B2B1

PERIMETER ROAD

TAXIWAY B

TAXIWAY D

TAXIW

AY H

TAXIWAY M

TA

XI

W

AY

E21

E2

TA

XI

W

AY

T

E3

ARFF ROAD

E A7

K1

10L

NW

RAMP

A6

NORTH RAMP GA RAMP

TAXIWAY A

A4

RUNWAY

W

TAXIWAY T

B8 C

PERIMETER RD

N E

2N

D A

VE

AIR CARGO RD.

A3 A1

NE AIRPORT WAY

NORTH PERIMETER RD. NE MARINE DRIVE

COLUMBIA RIVER

V

NORTHEAST RAMP

A2

28 L

SE RAMP

28 R

OREGON AIR

NATIONAL

GUARD APRON

TE

R

M

IN

AL

HQ

TOWER

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:38:54 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - general info\haul route plan.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

HAUL ROUTES PLAN

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

3 CD

PDX 2026-2 GI1.032024D035 103022

N

SCALE: IN FEET

0' 300' 600' 1200' 1800'

SCALE:

HAUL ROUTES PLAN

1" = 600'1

RE

GIS

TERED PROFESSIONAL

ANTHONY C. LEWELLEN

DECEMBER 0 9 , 20 13

EXP: 12/31/2026

OREGON

80671

ENGINEER

LEGEND:

HAUL ROUTE

WORK AREA

NOTES:

1. ACCESS ROUTES AND EMPLOYEE PARKING AREAS SHALL BE COORDINATED WITH

THE PORT PRIOR TO START IF CONSTRUCTION.

2. EXISTING CONDITIONS SHOWN ARE UP TO DATE AS OF THE TIME OF BID, AND ARE

SUBJECT TO CHANGE BASED ON CURRENT AIRPORT CONSTRUCTION ACTIVITIES.

3. THE PORT WILL PROVIDE PARKING SPACES FOR TWO CONTRACTOR VEHICLES ON

THE APRON IN THE VICINITY OF THE ACTIVE WORK AREA. PORT WILL ALSO

PROVIDE TWO PARKING SPACES IN THE PARKING GARAGE AT PDX. PARKING

LOCATIONS ARE AT SOLE DISCRETION OF THE PORT AND WILL BE SUBJECT TO

CHANGE DAILY AS AIRPORT OPERATIONAL NEEDS REQUIRE. THESE PARKING

SPACES ARE IN ADDITION TO THE CONTRACTOR EMPLOYEE PARKING AREA SHOWN

ON THE DRAWING.

GATE NA-75 (POINT OF

AIRFIELD ACCESS)

FEDERAL SECURITY

CHECKPOINT REQUIRED

FOR AIRFIELD ACCESS TO

PROJECT AREAS

GATE SA-17 (POINT OF

AIRFIELD ACCESS)

GATE NA-45 (POINT OF

AIRFIELD ACCESS)

GATE SA-14 (POINT OF

AIRFIELD ACCESS)

FEDERAL SECURITY

CHECKPOINT REQUIRED

FOR AIRFIELD ACCESS TO

PROJECT AREAS

2026-11-10T12:06:55-0800
Tony Lewellen

File details come from the government source that posted it. Updated .