PDX 2026-2 (8) F1.04.pdf

PDF 517 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This document is an architectural floor plan for the Portland International Airport Fire Protection Replacements project in Oregon. The plan depicts the South Cargo Floor layout at a scale of 1/16" = 1'-0" and identifies various airline and ground service operator lease spaces, including Delta, Southwest Airlines, Horizon Air, Performance Logistics, and Alliance Ground (AGI)/Airport Terminal Services. The drawing is dated November 2026 and was prepared by registered professional engineer Anthony C. Lewellen (Oregon License No. 80671, expiring December 31, 2026). The project involves fire protection system replacements within the terminal utility tunnel, specifically addressing sprinkler system components in the South Cargo area.

The key work noted on the plan includes replacing a dry valve located in the Southwest Airlines lease space and providing a new spool section as required to accommodate the installation. The floor plan serves as a reference document for construction contractors and facility stakeholders to identify equipment locations, ground service equipment (GSE) parking areas, and spatial relationships within the South Cargo Floor during the fire protection replacement project. The drawing was finalized and printed in October 2026 and includes graphic scales and viewing guidance to ensure proper interpretation of the design across different printing and viewing formats.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

A

1 2 63 4 5 7 8 9 10 11 12 13 1514 16 17 18 19 20 21

#7802

DELTA

#7804

PERFORMANCE

LOGISTICS

#7806

POP

#7810

SOUTHWEST

AIRLINES

#7904

HORIZON

AIR

#7908

ALLIANCE GROUND

(AGI)/AIRPORT

TERMINAL

SERVICES

#7910

ALLIANCE GROUND

(AGI)/AIRPORT

TERMINAL

SERVICES

2 3

4 5

3A

1A

3 4 5 6

STOP

KEEP CLEAR

KEEP CLEAR

KEEP CLEAR

KEEP CLEAR

E8 E9 E10 E11 E12 E13B E13A

4A21

11 - 12

B10

B11

M

PH

10 M

PH

2 3

4A

4 5 6

3A1A

GSE PARKING GSE PARKING GSE PARKING

GSE PARKING

SCALE: IN FEET

0' 8' 16' 32' 48'

N

SCALE:

SOUTH CARGO FLOOR PLAN

1/16" = 1'-0"1

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

3:08:00 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\south cargo floor plan.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

SOUTH CARGO FLOOR PLAN

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

8 CD

PDX 2026-2 F1.042024D035 103022

RE

GIS

TERED PROFESSIONAL

ANTHONY C. LEWELLEN

DECEMBER 0 9 , 20 13

EXP: 12/31/2026

OREGON

80671

ENGINEER

KEY NOTES :

1. REPLACE DRY VALVE LOCATED IN

SOUTHWEST AIRLINES LEASE SPACE.

PROVIDE NEW SPOOL SECTION AS REQUIRED

TO ACCOMMODATE INSTALLATION.

F8.02

F8.011

KEY PLAN

SCALE: N.T.S.

PROJECT AREA

N

2026-11-10T12:11:05-0800
Tony Lewellen

File details come from the government source that posted it. Updated .