PDX 2026-2 (8) F1.04.pdf
PDF 517 KB Posted
- Solicitation number
- 148221
- Issued by
- Multnomah County, Oregon
About this file
This document is an architectural floor plan for the Portland International Airport Fire Protection Replacements project in Oregon. The plan depicts the South Cargo Floor layout at a scale of 1/16" = 1'-0" and identifies various airline and ground service operator lease spaces, including Delta, Southwest Airlines, Horizon Air, Performance Logistics, and Alliance Ground (AGI)/Airport Terminal Services. The drawing is dated November 2026 and was prepared by registered professional engineer Anthony C. Lewellen (Oregon License No. 80671, expiring December 31, 2026). The project involves fire protection system replacements within the terminal utility tunnel, specifically addressing sprinkler system components in the South Cargo area.
The key work noted on the plan includes replacing a dry valve located in the Southwest Airlines lease space and providing a new spool section as required to accommodate the installation. The floor plan serves as a reference document for construction contractors and facility stakeholders to identify equipment locations, ground service equipment (GSE) parking areas, and spatial relationships within the South Cargo Floor during the fire protection replacement project. The drawing was finalized and printed in October 2026 and includes graphic scales and viewing guidance to ensure proper interpretation of the design across different printing and viewing formats.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
A
1 2 63 4 5 7 8 9 10 11 12 13 1514 16 17 18 19 20 21
#7802
DELTA
#7804
PERFORMANCE
LOGISTICS
#7806
POP
#7810
SOUTHWEST
AIRLINES
#7904
HORIZON
AIR
#7908
ALLIANCE GROUND
(AGI)/AIRPORT
TERMINAL
SERVICES
#7910
ALLIANCE GROUND
(AGI)/AIRPORT
TERMINAL
SERVICES
2 3
4 5
3A
1A
3 4 5 6
STOP
KEEP CLEAR
KEEP CLEAR
KEEP CLEAR
KEEP CLEAR
E8 E9 E10 E11 E12 E13B E13A
4A21
11 - 12
B10
B11
M
PH
10 M
PH
2 3
4A
4 5 6
3A1A
GSE PARKING GSE PARKING GSE PARKING
GSE PARKING
SCALE: IN FEET
0' 8' 16' 32' 48'
N
SCALE:
SOUTH CARGO FLOOR PLAN
1/16" = 1'-0"1
10/26/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
3:08:00 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\south cargo floor plan.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50� WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
FIRE PROTECTION REPLACEMENTS
SOUTH CARGO FLOOR PLAN
TONY LEWELLEN
T. LEWELLEN
S. CIMINO
T. LEWELLEN
NOVEMBER 2026
8 CD
PDX 2026-2 F1.042024D035 103022
RE
GIS
TERED PROFESSIONAL
ANTHONY C. LEWELLEN
DECEMBER 0 9 , 20 13
EXP: 12/31/2026
OREGON
80671
ENGINEER
KEY NOTES :
1. REPLACE DRY VALVE LOCATED IN
SOUTHWEST AIRLINES LEASE SPACE.
PROVIDE NEW SPOOL SECTION AS REQUIRED
TO ACCOMMODATE INSTALLATION.
F8.02
F8.011
KEY PLAN
SCALE: N.T.S.
PROJECT AREA
N
| 2026-11-10T12:11:05-0800 | |
| Tony Lewellen |
File details come from the government source that posted it. Updated .