This is an architectural drawing for fire protection replacements at Portland International Airport in Oregon. The document, dated October 26, 2026, contains enlarged floor plans for the terminal and concourses deplaning areas, specifically detailing two fire protection riser rooms: Concourse C Fire Protection Riser Room C1234 and South Terminal Fire Protection Riser Room T1782. The project scope includes replacing dry valves serving multiple zones: zones C-E-1-2-D and C-E-1-1-D in the concourse area, and zones T-S-1-2-D and T-LR-1-4-D in the south terminal area. New spool sections will be provided as required to accommodate the valve installations. The drawing is presented at a scale of 1/4 inch equals 1 foot, with graphic scales provided for reference only, and includes key plan information noting the project area location within the airport facility.

The drawing was prepared by Tony Lewellen as the designer and drafter, with S. Cimino providing the check, and was submitted in November 2026. The document serves as a reference and design document for the fire protection system upgrades and does not contain information regarding pricing, contract terms, bidding procedures, set-asides, funding sources, or award details. This appears to be a technical design document rather than a formal solicitation or contract award notice.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:58:43 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\enlarged flr plans term-conc deplaning.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

TERMINAL AND CONCOURSES DEPLANING ENLARGED FLOOR PLANS

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

7 CD

PDX 2026-2 F1.032024D035 103022

SCALE: IN FEET

0' 2' 4' 8' 12'

N

SCALE:

CONCOURSE C FIRE PROTECTION RISER ROOM C1234

1/4" = 1'-0"1

RE

*,6

7ERED 3R2)E66,21$/

$17+21< C� /E:E//E1

DECE0%ER 0 � � �0 ��

E;3� �������0��

2RE*21

�0���

E1*,1EER

SCALE: IN FEET

0' 2' 4' 8' 12'

SCALE:

SOUTH TERMINAL FIRE PROTECTION RISER ROOM T1782

1/4" = 1'-0"2

T15

KEY NOTES :

1. REPLACE DRY VALVES SERVING ZONES

C-E-1-2-D AND C-E-1-1-D. PROVIDE NEW

SPOOL SECTION AS REQUIRED TO

ACCOMMODATE INSTALLATION.

2. REPLACE DRY VALVES SERVING ZONES

T-S-1-2-D AND T-LR-1-4-D. PROVIDE NEW

SPOOL SECTION AS REQUIRED TO

ACCOMMODATE INSTALLATION.

F8.02

F8.01

T17

TB TB

F8.02

F8.02

F8.012 4

F8.02

VALVE RM

T1782

VALVE RM

C1234

KEY PLAN

SCALE: N.T.S.

N

PROJECT AREA

2026-11-10T12:10:29-0800
Tony Lewellen

File details come from the government source that posted it. Updated .