Substitution Request Form.pdf

PDF 116 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This document is a Substitution Request Form used by the Port of Portland for the Portland International Airport Fire Protection Replacements project in Oregon. The form provides a standardized process for contractors to request approval to substitute specified materials or products with alternative options that are claimed to be equal or superior. Contractors must submit detailed information about the proposed substitution, including the trade name, model number, manufacturer details, and comprehensive supporting documentation such as product descriptions, specifications, drawings, photographs, and performance or test data. The submitting contractor must certify multiple conditions, including that the substitution has been fully investigated and determined equal or superior to the specified product, that equivalent warranty and maintenance service are available, that there will be no adverse effects on other trades or the project schedule, and that dimensions and functional clearances are unaffected.

The Port of Portland's review process offers four possible outcomes: approval to proceed with submittals in accordance with the General Conditions and Specification Section 013300, conditional approval with noted modifications, rejection requiring use of specified materials, or rejection based on late submission. The form requires identification of supporting documentation provided with the request, including drawings, product data, samples, tests, and reports. The contractor submitting the request acknowledges responsibility for any associated costs related to building design changes, architectural or engineering redesigns, detailing modifications, and construction costs resulting from the substitution. This form, based on CSI Form 1.5C standards and Port-revised in March 2019, serves as the contractual mechanism for managing material and product changes during the execution of the airport fire protection replacement project.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
PDX 2026-2 (12) F8.01.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBSTITUTION

REQUEST

Project: From:

To: Port of Portland Date:

Specification

Title:

Specification

Section No.:

Section

Page:

Article/

Paragraph:

Proposed Substitution:

Trade Name: Model No.:

Manufacturer: Address: Phone:

Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified.

Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule. Proposed substitution does not affect dimensions and functional clearances.

• Undersigned will pay for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

Submitted By:

Signature:

Address:

Telephone:

PORT REVIEW AND ACTION

☐ Substitution approved – Make submittals in accordance with the General Conditions and Specification Section 013300.

☐ Substitution approved as noted – Make submittals in accordance with the General Conditions and Specification

Section 013300.

☐ Substitution rejected – Use specified materials.

☐ Substitution request received too late – Use specified materials.

Signed by: Date:

Supporting Data Attached: ☐ Drawings ☐ Product Data ☐ Samples ☐ Tests ☐ Reports ☐

CSI Form 1.5C Version January 2013

Port-revised March 2019

Project:
From:
Date:
Specification Title:
Section No:
Section Page:
Article Paragraph:
Proposed Substitution:
Trade Name:
Model No:
Manufacturer:
Phone:
Submitted By:
Address2:
Telephone:
Substitution approved – Make submittals in accordance with the General Conditions and Specification Section 013300: Off
Substitution approved as noted – Make submittals in accordance with the General Conditions and Specification: Off
Substitution rejected – Use specified materials: Off
Substitution request received too late – Use specified materials: Off
Drawings: Off
Product Data: Off
Samples: Off
Tests: Off
Reports: Off
Other: Off
Other Description:
Action Date:
Address:
Address1: