PDX 2026-2 (12) F8.01.pdf

PDF 267 KB Posted

Attached to
Portland International Airport Fire Protection Replacements
Solicitation number
148221
Issued by
Multnomah County, Oregon

About this file

This is a fire protection system design and riser detail drawing for the Portland International Airport Fire Protection Replacements project, prepared by Tony Lewellen and dated November 2026. The document provides technical specifications and schematics for fire protection system replacements across multiple terminal areas at Portland International Airport in Oregon. The project encompasses replacements of pre-action systems in the North Terminal (Room T1TN45) and South Terminal (Room T1194), dry valve replacements in the South Terminal Riser Room T1782 and Concourse C Riser Room C1234, and upgrades to ensure NFPA 13 compliance. The drawings detail the existing 8-inch bulk main connections to central riser rooms, fire department connection (FDC) inter-tie locations, and distribution system modifications across multiple terminal sections, including deplaning areas facing various directions.

The document serves as a technical reference for contractors bidding on or executing fire protection replacement work at Portland International Airport. The design specifications include stacked valve installations to replace existing pre-action cabinets, removal and replacement of non-compliant distribution systems with NFPA 13-compliant alternatives, and dry valve replacements throughout the terminal infrastructure. The drawing is scaled at various ratios for different system sections and includes notations regarding optimal viewing and printing conditions. This appears to be a construction document package component, likely part of a larger bid package or project specifications for fire safety infrastructure improvements at the airport facility.

View the file

Other files

File Type Posted
PDX 2026-2 (3) GI1.03.pdf PDF
PDX 2026-2 (11) F1.07.pdf PDF
PDX 2026-2 (4) F0.01.pdf PDF
PDX 2026-2 (13) F8.02.pdf PDF
PDX 2026-2 (10) F1.06.pdf PDF
PDX 2026-2 (2) GI1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-2 (6) F1.02.pdf PDF
PDX 2026-2 (8) F1.04.pdf PDF
2026-14928 Project Manual.pdf PDF
PDX 2026-2 (9) F1.05.pdf PDF
PDX 2026-2 (7) F1.03.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-2 (1) GI1.01.pdf PDF
PDX 2026-2 (0) Bid COVER.pdf PDF
PDX 2026-2 (5) F1.01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/26/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

4:21:31 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\fire protection riser diagrams.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

FIRE PROTECTION REPLACEMENTS

FIRE PROTECTION RISER DETAILS

TONY LEWELLEN

T. LEWELLEN

S. CIMINO

T. LEWELLEN

NOVEMBER 2026

12 CD

PDX 2026-2 F8.012024D035 103022

RE

*,6

7ERED 3R2)E66,21$/

$17+21< C� /E:E//E1

DECE0%ER 0 � � �0 ��

E;3� �������0��

2RE*21

�0���

E1*,1EER

SCALE:

NORTH TERMINAL PRE-ACTION SYSTEM

N.T.S.1

DEPLANING

8" BULK MAIN TO CENTRAL

DEPLANING RISER ROOM

T-N-UT-3-PA

REPLACE PRE-ACTION CABINET

LOCATED IN ROOM T1TN45 WITH

STACKED VALVES

T

REMOVE EXISTING

DISTRIBUTION AND

REPLACE WITH NFPA 13

COMPLIANT SYSTEM

T

SCALE:

DRY SYSTEM VALVE REPLACEMENT

N.T.S.3

REPLACE DRY VALVE

DEPLANING

FACING SOUTHFACING EAST

T-S-1-2-D

FDC INTER TIE

8" BULK MAIN TO

CENTRAL RISER ROOM

T-S/L-2-2-W T-S-4-2-W

T-SE-2-3-W

T-SE-1-3-W

T-S-UT-1-W

T-SW-1-1-W

T-SW-2-1-W

T-LR-1-4-D

T-S-1/2-4-W

T-S-1/2-4-W

T-S-4-1-W

FROM YARD PIPING

T T T T T T T T T T T

F F F F F F F

RISER ROOM

T-1782

SCALE:

SOUTH TERMINAL FIRE PROTECTION RISER ROOM T1782

N.T.S.2

REPLACE

DRY VALVE

REPLACE

DRY VALVE

SCALE:

SOUTH TERMINAL PRE-ACTION SYSTEM

N.T.S.4

DEPLANING

8" BULK MAIN TO CENTRAL

DEPLANING RISER ROOM

T-S-UT-2-PA

REPLACE PRE-ACTION CABINET

LOCATED IN ROOM T1194 WITH

STACKED VALVES

T

REMOVE EXISTING

DISTRIBUTION AND

REPLACE WITH NFPA 13

COMPLIANT SYSTEM

)$C,1* :E67 )$C,1* 12R7+

T

F

T

F

T

F

TT T

REPLACE DRY

VALVE

FDC AND FDC INTER-TIR

C-E-1-2-D

C-E-UT-1-W

C-E-3-1-W C-E-3-2-W

C-E-3-3-PA

C-E-2-1-W C-E-1-1-D

FROM YARD

PIPING

REPLACE DRY

VALVE

SCALE:

CONCOURSE C FIRE PROTECTION RISER ROOM C1234

N.T.S.5

2026-11-10T12:13:29-0800
Tony Lewellen

File details come from the government source that posted it. Updated .