PDX 2026-2 (12) F8.01.pdf
PDF 267 KB Posted
- Solicitation number
- 148221
- Issued by
- Multnomah County, Oregon
About this file
This is a fire protection system design and riser detail drawing for the Portland International Airport Fire Protection Replacements project, prepared by Tony Lewellen and dated November 2026. The document provides technical specifications and schematics for fire protection system replacements across multiple terminal areas at Portland International Airport in Oregon. The project encompasses replacements of pre-action systems in the North Terminal (Room T1TN45) and South Terminal (Room T1194), dry valve replacements in the South Terminal Riser Room T1782 and Concourse C Riser Room C1234, and upgrades to ensure NFPA 13 compliance. The drawings detail the existing 8-inch bulk main connections to central riser rooms, fire department connection (FDC) inter-tie locations, and distribution system modifications across multiple terminal sections, including deplaning areas facing various directions.
The document serves as a technical reference for contractors bidding on or executing fire protection replacement work at Portland International Airport. The design specifications include stacked valve installations to replace existing pre-action cabinets, removal and replacement of non-compliant distribution systems with NFPA 13-compliant alternatives, and dry valve replacements throughout the terminal infrastructure. The drawing is scaled at various ratios for different system sections and includes notations regarding optimal viewing and printing conditions. This appears to be a construction document package component, likely part of a larger bid package or project specifications for fire safety infrastructure improvements at the airport facility.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/26/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
4:21:31 PM CIMINS r:\aviation\pdx\2026\0002 - terminal utility tunnel sprinkler replacements\sheets - fire\fire protection riser diagrams.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
FIRE PROTECTION REPLACEMENTS
FIRE PROTECTION RISER DETAILS
TONY LEWELLEN
T. LEWELLEN
S. CIMINO
T. LEWELLEN
NOVEMBER 2026
12 CD
PDX 2026-2 F8.012024D035 103022
RE
*,6
7ERED 3R2)E66,21$/
$17+21< C� /E:E//E1
DECE0%ER 0 � � �0 ��
E;3� �������0��
2RE*21
�0���
E1*,1EER
SCALE:
NORTH TERMINAL PRE-ACTION SYSTEM
N.T.S.1
DEPLANING
8" BULK MAIN TO CENTRAL
DEPLANING RISER ROOM
T-N-UT-3-PA
REPLACE PRE-ACTION CABINET
LOCATED IN ROOM T1TN45 WITH
STACKED VALVES
T
REMOVE EXISTING
DISTRIBUTION AND
REPLACE WITH NFPA 13
COMPLIANT SYSTEM
T
SCALE:
DRY SYSTEM VALVE REPLACEMENT
N.T.S.3
REPLACE DRY VALVE
DEPLANING
FACING SOUTHFACING EAST
T-S-1-2-D
FDC INTER TIE
8" BULK MAIN TO
CENTRAL RISER ROOM
T-S/L-2-2-W T-S-4-2-W
T-SE-2-3-W
T-SE-1-3-W
T-S-UT-1-W
T-SW-1-1-W
T-SW-2-1-W
T-LR-1-4-D
T-S-1/2-4-W
T-S-1/2-4-W
T-S-4-1-W
FROM YARD PIPING
T T T T T T T T T T T
F F F F F F F
RISER ROOM
T-1782
SCALE:
SOUTH TERMINAL FIRE PROTECTION RISER ROOM T1782
N.T.S.2
REPLACE
DRY VALVE
REPLACE
DRY VALVE
SCALE:
SOUTH TERMINAL PRE-ACTION SYSTEM
N.T.S.4
DEPLANING
8" BULK MAIN TO CENTRAL
DEPLANING RISER ROOM
T-S-UT-2-PA
REPLACE PRE-ACTION CABINET
LOCATED IN ROOM T1194 WITH
STACKED VALVES
T
REMOVE EXISTING
DISTRIBUTION AND
REPLACE WITH NFPA 13
COMPLIANT SYSTEM
)$C,1* :E67 )$C,1* 12R7+
T
F
T
F
T
F
TT T
REPLACE DRY
VALVE
FDC AND FDC INTER-TIR
C-E-1-2-D
C-E-UT-1-W
C-E-3-1-W C-E-3-2-W
C-E-3-3-PA
C-E-2-1-W C-E-1-1-D
FROM YARD
PIPING
REPLACE DRY
VALVE
SCALE:
CONCOURSE C FIRE PROTECTION RISER ROOM C1234
N.T.S.5
| 2026-11-10T12:13:29-0800 | |
| Tony Lewellen |
File details come from the government source that posted it. Updated .