Aircraft Parking Apron Expansion
Awarded State & local contract opportunity
- Solicitation number
- ITB 2025-AP-002
- State
- Florida
- Responses due
Opportunity facts
- NIGP codes
- 28555 Lighting, Area, Pole Or Standard Mounted (Parking Lots, Etc.)
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91310 Construction: Airport Roadway, Runway And Taxiway
- 91356 Construction, Utility/Underground Projects
- 98815 Fence Installation, Maintenance And Repair
- UNSPSC codes
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 72141511 Digging services
- 95121614 Runway
- 72141126 Underground utilities construction service
- 72154027 Posthole digging service
- 39111618 Sports lighting system
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
Show all 26
- 72141101 Airport runway construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 39111619 Large area lighting system
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95121613 Airfield
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72154013 Fence construction service
- 72154069 Fencing and railing service
- Points of contact
-
- Daniel Nickols Jr., PE dnickols@avconinc.com (407) 599-1122
- Jessica Burnham jburnham@umatillafl.org (352) 669-3125
Updated .
About this opportunity
The City of Umatilla, Florida is soliciting bids for the Aircraft Parking Apron Expansion Project at the Umatilla Municipal Airport through Invitation to Bid (ITB No. 2025-AP-002). The comprehensive project involves constructing an asphalt aircraft parking apron expansion, which includes installing 33 new aircraft tie-downs, implementing new apron site lighting, conducting airfield electrical upgrades, and constructing a new dry retention area. Additional project deliverables include clearing and grubbing, site grading and drainage, airfield pavement striping, airport security fence installation, and site restoration across approximately 9.57 acres. The project will be funded through FAA Airport Improvement Program (AIP) and Florida Department of Transportation (FDOT) grants. Bidders are required to submit professional references and demonstrate relevant experience in horizontal construction at airport facilities. The bid documents were distributed on March 20, 2025, with a non-mandatory pre-bid conference held on April 2, 2025, at 3:00 PM. Sealed proposals are due by 2:00 PM on April 24, 2025, with bid award recommendation scheduled for the City Council meeting on May 13, 2025. A 5% bid bond is mandatory, and the total project duration is estimated at 97 calendar days.
The project includes a Disadvantaged Business Enterprise (DBE) participation goal of 4.41%, encouraging participation from small and minority-owned businesses. Bidders must comply with federal regulations regarding labor standards, equal employment opportunity, and Buy American preferences. The project has specific environmental considerations, including a $10,000 permit and $25,000 allocation for gopher tortoise burrow excavation and relocation. The total project budget is approximately $35,000, with 39 distinct line items covering various construction activities. Performance and payment bonds will be required to cover the full contract amount. The contractor will be responsible for comprehensive material testing, with a maximum of 20% recycled asphalt pavement (RAP) allowed in the asphalt mix. Strict airfield security protocols and operational safety requirements must be maintained throughout construction, with minimal disruption to existing airport operations. Excess materials generated during construction will become airport property and must be delivered or stockpiled as directed by the owner.
Opportunity text
Construction of the Aircraft Parking Apron Expansion Project at the Umatilla Municipal Airport. This project shall consist of the construction of an asphalt aircraft parking apron expansion, new aircraft tie-down installation, new apron site lighting, associated airfield electrical and landside utility coordination, and construction of a new dry retention area. Also included in this project is clearing and grubbing, site grading and drainage, airfield pavement striping, airport security fence, and site restoration.
Files
Show all 17
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity