About this file
This bid tabulation document is for the Aircraft Parking Apron Expansion Project for the City of Umatilla Municipal Airport in Florida, with project number 2025-AP-001. The bid tabulation includes detailed pricing submissions from multiple contractors including Halifax Paving, Inc., Bulldog Sitework, LLC, Faden Builders, Inc., Ranger Construction Industries, Inc., C.W. Roberts Contracting, Inc., Dickerson Infrastructure, Inc., and others. The project involves comprehensive airport infrastructure improvements, including cold milling existing pavement, clearing and grubbing, excavation, subgrade stabilization, asphalt surface course installation, fence removal and installation, seeding, sodding, electrical work, lighting upgrades, and the installation of 33 new aircraft tie-downs.
The bid tabulation reveals significant price variations across line items, with total project bids ranging from approximately $1,129,822 to $1,505,000. The lowest bid was submitted by Halifax Paving, Inc. at $1,129,822.50, while the highest bid came from Masci General Contractor, Inc. at $1,627,412.80. Each bidder provided unit prices for 39 distinct line items, covering activities such as gopher tortoise protection, temporary power and airfield lighting, electrical demolition, and various construction safety and quality control measures. The project appears to be funded through FAA Airport Improvement Program (AIP) and Florida Department of Transportation (FDOT) grants, with environmental considerations including specific allocations for gopher tortoise burrow excavation and relocation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX PAY ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION
1 P-101 COLD MILLING EXISTING PAVEMENT, FULL DEPTH SY 250 $40.00 $10,000.00 $67.10 $16,775.00 $27.00 $6,750.00 $45.00 $11,250.00 $48.80 $12,200.00 $50.00 $12,500.00
2 P-151 CLEARING & GRUBBING AC 7 $14,500.00 $101,500.00 $5,378.90 $37,652.30 $6,600.00 $46,200.00 $17,600.00 $123,200.00 $15,800.00 $110,600.00 $14,000.00 $98,000.00
3 P-152 UNCLASSFIED EXCAVATION CY 10,250 $10.00 $102,500.00 $7.35 $75,337.50 $12.00 $123,000.00 $14.00 $143,500.00 $7.80 $79,950.00 $13.00 $133,250.00
4 P-152 SUBGRADE STABILIZATION SY 5,050 $7.50 $37,875.00 $8.07 $40,753.50 $7.80 $39,390.00 $8.00 $40,400.00 $11.60 $58,580.00 $12.00 $60,600.00
5 P-211 LIME ROCK BASE COURSE CY 910 $84.00 $76,440.00 $95.57 $86,968.70 $108.00 $98,280.00 $80.00 $72,800.00 $97.00 $88,270.00 $100.00 $91,000.00
6 P-403 ASPHALT SURFACE COURSE TON 1,050 $175.00 $183,750.00 $288.53 $302,956.50 $257.00 $269,850.00 $170.00 $178,500.00 $243.00 $255,150.00 $200.00 $210,000.00
7 P-602 EMULSIFIED ASPHALT PRIME COAT GAL 1,270 $6.00 $7,620.00 $5.49 $6,972.30 $9.00 $11,430.00 $6.00 $7,620.00 $5.20 $6,604.00 $5.00 $6,350.00
8 P-603 EMULSFIED ASPHALT TACK COAT GAL 400 $6.00 $2,400.00 $12.20 $4,880.00 $9.00 $3,600.00 $4.00 $1,600.00 $5.30 $2,120.00 $5.00 $2,000.00
9 P-620 PAVEMENT MARKINGS, WATERBORNE PAINT, WITH TYPE I REFLECTIVE MEDIA SF 600 $2.00 $1,200.00 $3.97 $2,382.00 $7.80 $4,680.00 $7.00 $4,200.00 $12.20 $7,320.00 $3.00 $1,800.00
10 P-620 PAVEMENT MARKINGS, WATERBORNE PAINT, WITHOUT REFLECTIVE MEDIA SF 1,150 $0.60 $690.00 $1.97 $2,265.50 $6.60 $7,590.00 $7.00 $8,050.00 $9.70 $11,155.00 $2.00 $2,300.00
11 P-620 HALF-RATE PAVEMENT MARKINGS, WATERBORNE PAINT, W/O REFLECTIVE MEDIA SF 600 $1.00 $600.00 $1.64 $984.00 $6.60 $3,960.00 $7.00 $4,200.00 $7.30 $4,380.00 $1.50 $900.00
12 F-162 REMOVE EXISTING CHAIN-LINK FENCE LF 910 $6.50 $5,915.00 $3.66 $3,330.60 $11.00 $10,010.00 $7.00 $6,370.00 $8.00 $7,280.00 $10.00 $9,100.00
13 F-162 6' BLACK PVC COATED CHAIN-LINK FENCE WITH BARBED WIRE AND SIGNAGE LF 950 $34.55 $32,822.50 $54.32 $51,604.00 $53.00 $50,350.00 $37.00 $35,150.00 $38.30 $36,385.00 $42.00 $39,900.00
14 F-162 FENCE DITCH CROSSING LS 1 $5,250.00 $5,250.00 $1,893.05 $1,893.05 $2,800.00 $2,800.00 $8,400.00 $8,400.00 $6,100.00 $6,100.00 $6,000.00 $6,000.00
15 T-901 SEEDING SY 14,700 $0.30 $4,410.00 $0.19 $2,793.00 $0.80 $11,760.00 $0.50 $7,350.00 $1.60 $23,520.00 $3.00 $44,100.00
16 T-904 SODDING SY 18,000 $5.00 $90,000.00 $4.13 $74,340.00 $5.40 $97,200.00 $3.50 $63,000.00 $5.30 $95,400.00 $6.00 $108,000.00
17 T-908 MULCHING SY 14,700 $0.30 $4,410.00 $0.19 $2,793.00 $0.60 $8,820.00 $0.50 $7,350.00 $1.00 $14,700.00 $1.00 $14,700.00
18 GP-80 CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE LS 1 $14,590.00 $14,590.00 $32,285.16 $32,285.16 $20,000.00 $20,000.00 $67,000.00 $67,000.00 $16,400.00 $16,400.00 $30,000.00 $30,000.00
19 GP-80 STABILIZED ACCESS ROAD LS 1 $10,000.00 $10,000.00 $2,199.38 $2,199.38 $9,000.00 $9,000.00 $10,000.00 $10,000.00 $8,700.00 $8,700.00 $10,000.00 $10,000.00
20 --- GOPHER TORTOISE SURVEY/PROTECTION LS 1 $7,500.00 $7,500.00 $1,830.00 $1,830.00 $10,000.00 $10,000.00 $2,300.00 $2,300.00 $3,126.00 $3,126.00 $8,500.00 $8,500.00
21 --- GOPHER TOROISE PERMIT ALLOW 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00
22 --- GOPHER TORTOISE BURROW EXCAVATION AND RELOCATION ALLOW 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
23 --- INSTALL NEW AIRCRAFT TIE-DOWNS EACH 33 $600.00 $19,800.00 $790.38 $26,082.54 $1,100.00 $36,300.00 $720.00 $23,760.00 $800.00 $26,400.00 $980.00 $32,340.00
24 SP-104-1 TEMPORARY POWER AND TEMPORARY AIRFIELD LIGHTING LS 1 $1,000.00 $1,000.00 $24,970.96 $24,970.96 $24,560.00 $24,560.00 $1,200.00 $1,200.00 $1,400.00 $1,400.00 $1,200.00 $1,200.00
25 SP-105-1 ELECTRICAL DEMOLITION LS 1 $4,000.00 $4,000.00 $8,784.00 $8,784.00 $8,640.00 $8,640.00 $4,800.00 $4,800.00 $5,400.00 $5,400.00 $5,000.00 $5,000.00
26 L-108-1
1/C #2 AWG, THWN-2, 600V, INSULATED COPPER CONDUCTOR, INSTALLED IN DUCT OR
CONDUIT
LF 600 $5.00 $3,000.00 $8.85 $5,310.00 $8.70 $5,220.00 $6.00 $3,600.00 $6.80 $4,080.00 $6.00 $3,600.00
27 L-108-2
1/C L-824 TYPE C UNSHIELDED #8 AWG 5KV STRANDED COPPER CABLE, INSTALLED IN DUCT
OR CONDUIT
LF 2,000 $2.00 $4,000.00 $10.41 $20,820.00 $10.24 $20,480.00 $2.40 $4,800.00 $2.70 $5,400.00 $2.25 $4,500.00
28 L-108-3 1/C #2 AWG SOLID COPPER COUNTERPOISE CABLE, INSTALLED OVER DUCT OR CONDUIT LF 1,200 $5.00 $6,000.00 $14.89 $17,868.00 $14.64 $17,568.00 $6.00 $7,200.00 $6.70 $8,040.00 $5.65 $6,780.00
29 L-108-4 0.75" DIAMETER BY 10.00' LONG COPPER CLAD STEEL SECTIONAL GROUND ROD EA 40 $200.00 $8,000.00 $75.64 $3,025.60 $74.40 $2,976.00 $235.00 $9,400.00 $270.00 $10,800.00 $225.00 $9,000.00
30 L-110-1 1 WAY 2" SCHEDULE 40 PVC DIRECT EARTH BURIED DUCT LF 1,100 $7.00 $7,700.00 $10.13 $11,143.00 $9.96 $10,956.00 $8.20 $9,020.00 $9.50 $10,450.00 $8.00 $8,800.00
31 L-110-2 1 WAY 2" SCHEDULE 40 PVC CONCRETE ENCASED DUCT LF 100 $20.00 $2,000.00 $31.72 $3,172.00 $31.20 $3,120.00 $24.00 $2,400.00 $27.00 $2,700.00 $23.00 $2,300.00
32 L-110-3 1 WAY 4" SPLIT DUCT LF 50 $20.00 $1,000.00 $85.40 $4,270.00 $140.00 $7,000.00 $24.00 $1,200.00 $28.00 $1,400.00 $23.00 $1,150.00
33 L-125-1 L-861T(L) OMNIDIRECTIONAL, BLUE, LED, TAXIWAY EDGE LIGHT EA 13 $1,900.00 $24,700.00 $1,168.76 $15,193.88 $1,150.00 $14,950.00 $2,200.00 $28,600.00 $2,550.00 $33,150.00 $2,200.00 $28,600.00
34 L-125-2 FIELD LIGHTNING ARRESTOR ASSEMBLY EA 2 $1,200.00 $2,400.00 $1,313.94 $2,627.88 $1,292.00 $2,584.00 $1,600.51 $3,201.02 $1,600.00 $3,200.00 $1,400.00 $2,800.00
35 26.56.30-5.1 APRON LIGHTING POLE ASSEMBLY #1-4 - COMPLETE LS 1 $180,000.00 $180,000.00 $111,592.18 $111,592.18 $109,937.00 $109,937.00 $210,000.00 $210,000.00 $241,500.00 $241,500.00 $210,000.00 $210,000.00
36 C-100 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) LS 1 $25,000.00 $25,000.00 $65,508.36 $65,508.36 $7,500.00 $7,500.00 $12,000.00 $12,000.00 $37,000.00 $37,000.00 $14,000.00 $14,000.00
37 C-102 INSTALLATION AND REMOVAL OF SILT FENCE LF 350 $5.00 $1,750.00 $3.35 $1,172.50 $8.40 $2,940.00 $9.00 $3,150.00 $10.40 $3,640.00 $12.00 $4,200.00
38 C-102 TEMPORARY AIR & WATER POLLUTION, SOIL EROSION, & SILTATION CONTROL LS 1 $5,000.00 $5,000.00 $211.06 $211.06 $24,000.00 $24,000.00 $74,000.00 $74,000.00 $7,200.00 $7,200.00 $70,000.00 $70,000.00
39 C-105 MOBILIZATION (10% MAXIMUM) LS 1 $100,000.00 $100,000.00 $39,476.90 $39,476.90 $128,000.00 $128,000.00 $130,000.00 $130,000.00 $142,000.00 $142,000.00 $140,000.00 $140,000.00
$1,129,822.50 $1,147,224.35 $1,296,401.00 $1,365,571.02 $1,426,700.00 $1,468,270.00TOTAL
Bulldog Sitework, LLCHalifax Paving, Inc. Faden Builders, Inc. P & S Paving, Inc. Carr & Collier, Inc. GPS Civil Construction, Inc.
UMATILLA MUNICIPAL AIRPORT
CITY OF UMATILLA PROJECT NO. 2025-AP-001
AIRCRAFT PARKING APRON EXPANSION
BID TABULATION
4/28/2025 2023.0352.02
INDEX PAY ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION
1 P-101 COLD MILLING EXISTING PAVEMENT, FULL DEPTH SY 250 $35.25 $8,812.50 $50.00 $12,500.00 $40.00 $10,000.00 $35.00 $8,750.00 $63.00 $15,750.00 $15.00 $3,750.00
2 P-151 CLEARING & GRUBBING AC 7 $56,479.00 $395,353.00 $14,750.00 $103,250.00 $8,500.00 $59,500.00 $17,000.00 $119,000.00 $11,000.00 $77,000.00 $21,400.00 $149,800.00
3 P-152 UNCLASSFIED EXCAVATION CY 10,250 $7.45 $76,362.50 $7.50 $76,875.00 $7.00 $71,750.00 $25.00 $256,250.00 $12.00 $123,000.00 $25.12 $257,480.00
4 P-152 SUBGRADE STABILIZATION SY 5,050 $1.85 $9,342.50 $18.00 $90,900.00 $10.00 $50,500.00 $16.00 $80,800.00 $25.50 $128,775.00 $21.35 $107,817.50
5 P-211 LIME ROCK BASE COURSE CY 910 $75.60 $68,796.00 $130.00 $118,300.00 $90.00 $81,900.00 $120.00 $109,200.00 $187.00 $170,170.00 $98.57 $89,698.70
6 P-403 ASPHALT SURFACE COURSE TON 1,050 $188.90 $198,345.00 $210.00 $220,500.00 $238.00 $249,900.00 $240.00 $252,000.00 $233.00 $244,650.00 $228.45 $239,872.50
7 P-602 EMULSIFIED ASPHALT PRIME COAT GAL 1,270 $2.20 $2,794.00 $1.85 $2,349.50 $5.00 $6,350.00 $6.00 $7,620.00 $4.60 $5,842.00 $11.10 $14,097.00
8 P-603 EMULSFIED ASPHALT TACK COAT GAL 400 $5.00 $2,000.00 $10.00 $4,000.00 $10.00 $4,000.00 $6.00 $2,400.00 $5.75 $2,300.00 $10.73 $4,292.00
9 P-620 PAVEMENT MARKINGS, WATERBORNE PAINT, WITH TYPE I REFLECTIVE MEDIA SF 600 $3.40 $2,040.00 $3.40 $2,040.00 $3.50 $2,100.00 $3.00 $1,800.00 $4.25 $2,550.00 $15.20 $9,120.00
10 P-620 PAVEMENT MARKINGS, WATERBORNE PAINT, WITHOUT REFLECTIVE MEDIA SF 1,150 $3.40 $3,910.00 $3.40 $3,910.00 $3.50 $4,025.00 $1.00 $1,150.00 $1.75 $2,012.50 $7.99 $9,188.50
11 P-620 HALF-RATE PAVEMENT MARKINGS, WATERBORNE PAINT, W/O REFLECTIVE MEDIA SF 600 $3.40 $2,040.00 $3.40 $2,040.00 $3.50 $2,100.00 $1.50 $900.00 $3.25 $1,950.00 $14.59 $8,754.00
12 F-162 REMOVE EXISTING CHAIN-LINK FENCE LF 910 $7.40 $6,734.00 $15.00 $13,650.00 $3.50 $3,185.00 $9.00 $8,190.00 $3.50 $3,185.00 $12.31 $11,202.10
13 F-162 6' BLACK PVC COATED CHAIN-LINK FENCE WITH BARBED WIRE AND SIGNAGE LF 950 $42.35 $40,232.50 $65.00 $61,750.00 $38.00 $36,100.00 $45.00 $42,750.00 $48.00 $45,600.00 $42.25 $40,137.50
14 F-162 FENCE DITCH CROSSING LS 1 $5,970.00 $5,970.00 $20,000.00 $20,000.00 $3,500.00 $3,500.00 $4,550.00 $4,550.00 $3,450.00 $3,450.00 $8,500.00 $8,500.00
15 T-901 SEEDING SY 14,700 $2.15 $31,605.00 $1.75 $25,725.00 $0.55 $8,085.00 $1.20 $17,640.00 $0.95 $13,965.00 $3.00 $44,100.00
16 T-904 SODDING SY 18,000 $4.75 $85,500.00 $3.50 $63,000.00 $3.80 $68,400.00 $4.00 $72,000.00 $8.50 $153,000.00 $7.00 $126,000.00
17 T-908 MULCHING SY 14,700 $0.25 $3,675.00 $0.75 $11,025.00 $0.01 $147.00 $0.05 $735.00 $1.10 $16,170.00 $1.50 $22,050.00
18 GP-80 CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE LS 1 $21,800.00 $21,800.00 $110,821.09 $110,821.09 $165,000.00 $165,000.00 $60,000.00 $60,000.00 $55,000.00 $55,000.00 $8,150.00 $8,150.00
19 GP-80 STABILIZED ACCESS ROAD LS 1 $10,500.00 $10,500.00 $6,500.00 $6,500.00 $15,000.00 $15,000.00 $12,000.00 $12,000.00 $15,000.00 $15,000.00 $19,270.00 $19,270.00
20 --- GOPHER TORTOISE SURVEY/PROTECTION LS 1 $6,010.00 $6,010.00 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $23,406.00 $23,406.00
21 --- GOPHER TOROISE PERMIT ALLOW 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00
22 --- GOPHER TORTOISE BURROW EXCAVATION AND RELOCATION ALLOW 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00
23 --- INSTALL NEW AIRCRAFT TIE-DOWNS EACH 33 $682.00 $22,506.00 $1,000.00 $33,000.00 $1,000.00 $33,000.00 $1,000.00 $33,000.00 $1,000.00 $33,000.00 $1,271.00 $41,943.00
24 SP-104-1 TEMPORARY POWER AND TEMPORARY AIRFIELD LIGHTING LS 1 $1,140.00 $1,140.00 $6,500.00 $6,500.00 $3,500.00 $3,500.00 $12,000.00 $12,000.00 $86,900.00 $86,900.00 $8,900.00 $8,900.00
25 SP-105-1 ELECTRICAL DEMOLITION LS 1 $4,550.00 $4,550.00 $4,500.00 $4,500.00 $3,000.00 $3,000.00 $9,000.00 $9,000.00 $49,500.00 $49,500.00 $9,900.00 $9,900.00
26 L-108-1
1/C #2 AWG, THWN-2, 600V, INSULATED COPPER CONDUCTOR, INSTALLED IN DUCT OR
CONDUIT
LF 600 $5.70 $3,420.00 $5.75 $3,450.00 $6.00 $3,600.00 $5.00 $3,000.00 $50.50 $30,300.00 $6.87 $4,122.00
27 L-108-2
1/C L-824 TYPE C UNSHIELDED #8 AWG 5KV STRANDED COPPER CABLE, INSTALLED IN DUCT
OR CONDUIT
LF 2,000 $2.25 $4,500.00 $3.30 $6,600.00 $3.50 $7,000.00 $3.00 $6,000.00 $6.50 $13,000.00 $3.45 $6,900.00
28 L-108-3 1/C #2 AWG SOLID COPPER COUNTERPOISE CABLE, INSTALLED OVER DUCT OR CONDUIT LF 1,200 $5.70 $6,840.00 $4.00 $4,800.00 $4.00 $4,800.00 $4.00 $4,800.00 $18.00 $21,600.00 $3.45 $4,140.00
29 L-108-4 0.75" DIAMETER BY 10.00' LONG COPPER CLAD STEEL SECTIONAL GROUND ROD EA 40 $227.30 $9,092.00 $81.00 $3,240.00 $85.00 $3,400.00 $300.00 $12,000.00 $230.00 $9,200.00 $216.00 $8,640.00
30 L-110-1 1 WAY 2" SCHEDULE 40 PVC DIRECT EARTH BURIED DUCT LF 1,100 $7.95 $8,745.00 $8.25 $9,075.00 $8.50 $9,350.00 $15.00 $16,500.00 $15.00 $16,500.00 $12.72 $13,992.00
31 L-110-2 1 WAY 2" SCHEDULE 40 PVC CONCRETE ENCASED DUCT LF 100 $22.75 $2,275.00 $40.00 $4,000.00 $40.00 $4,000.00 $34.00 $3,400.00 $43.50 $4,350.00 $19.92 $1,992.00
32 L-110-3 1 WAY 4" SPLIT DUCT LF 50 $22.75 $1,137.50 $34.00 $1,700.00 $35.00 $1,750.00 $40.00 $2,000.00 $82.00 $4,100.00 $40.80 $2,040.00
33 L-125-1 L-861T(L) OMNIDIRECTIONAL, BLUE, LED, TAXIWAY EDGE LIGHT EA 13 $2,160.00 $28,080.00 $2,200.00 $28,600.00 $2,200.00 $28,600.00 $2,500.00 $32,500.00 $1,800.00 $23,400.00 $3,120.00 $40,560.00
34 L-125-2 FIELD LIGHTNING ARRESTOR ASSEMBLY EA 2 $1,360.00 $2,720.00 $950.00 $1,900.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 $400.00 $800.00 $720.00 $1,440.00
35 26.56.30-5.1 APRON LIGHTING POLE ASSEMBLY #1-4 - COMPLETE LS 1 $205,000.00 $205,000.00 $187,732.00 $187,732.00 $198,500.00 $198,500.00 $200,000.00 $200,000.00 $108,225.00 $108,225.00 $218,400.00 $218,400.00
36 C-100 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) LS 1 $1,250.00 $1,250.00 $25,338.00 $25,338.00 $50,000.00 $50,000.00 $40,000.00 $40,000.00 $21,500.00 $21,500.00 $51,200.00 $51,200.00
37 C-102 INSTALLATION AND REMOVAL OF SILT FENCE LF 350 $11.40 $3,990.00 $9.50 $3,325.00 $3.00 $1,050.00 $3.00 $1,050.00 $22.75 $7,962.50 $7.00 $2,450.00
38 C-102 TEMPORARY AIR & WATER POLLUTION, SOIL EROSION, & SILTATION CONTROL LS 1 $1,360.00 $1,360.00 $8,600.66 $8,600.66 $120,000.00 $120,000.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $12,980.00 $12,980.00
39 C-105 MOBILIZATION (10% MAXIMUM) LS 1 $146,000.00 $146,000.00 $145,000.00 $145,000.00 $150,000.00 $150,000.00 $140,000.00 $140,000.00 $128,000.00 $128,000.00 $166,128.00 $166,128.00
$1,469,427.50 $1,469,996.25 $1,505,092.00 $1,624,985.00 $1,695,707.00 $1,827,412.80
Signed: Bid Tabulation completed by Jack Thompson
TOTAL
AIRCRAFT PARKING APRON EXPANSION
BID TABULATION
(cont.)
Ranger Construction Industries, Inc.
C.W. Roberts Contracting, Inc.
Dickerson Infrastructure, Inc. dba
Dickerson Florida, Inc.
DB Civil Construction, LLC
Cathcart Construction Company - Florida, LLC
Masci General Contractor, Inc.
4/28/2025 2023.0352.02
File details come from the government source that posted it. Updated .