This document is a comprehensive set of bid drawings and technical specifications for the Aircraft Parking Apron Expansion Project at the Umatilla Municipal Airport, prepared by AVCON, Inc. for the City of Umatilla, Florida, with funding support from the Federal Aviation Administration (FAA) and the Florida Department of Transportation (FDOT). The project involves expanding the existing aircraft parking apron, installing new aircraft tie-down locations, implementing new apron site lighting, conducting airfield electrical upgrades, and constructing a new dry retention area. The project scope includes clearing and grubbing, site grading and drainage, airfield pavement striping, airport security fence installation, and site restoration. The bid documents are dated March 2025, with project number 453566-1-94-01 and FAA AIP number 3-12-0026-017-2023.
The project will be funded through a combination of FAA and FDOT grants, with the total project area covering approximately 9.57 acres. The bid documents specify detailed technical requirements for pavement construction, including asphalt surface course, lime rock base course, and specific grading and drainage specifications. The project includes precise electrical infrastructure upgrades, with four new 35-foot high mast light poles equipped with TLC-LED-550 fixtures, new electrical circuitry, and comprehensive grounding and protection systems. The contractor will be responsible for all site restoration, including sodding, erosion control, and maintaining a 25-foot wetland buffer throughout the project duration. The construction will be phased, with specific work area limitations and strict safety and phasing requirements to minimize disruption to airport operations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UMATILLA MUNICIPAL AIRPORT
AIRCRAFT PARKING APRON EXPANSION
NO. DATE DESCRIPTION
REVISIONS
DATE
FDOT PTGA NO.
FAA AIP NO.
AVCON PROJ NO.
MARCH 2025
453566-1-94-.1
3-12-0026-017-2023 2023.352.02
VICINITY MAP
N.T.S.
LOCATION MAP
N
KEY WEST
FT.PIERCE
DAYTONA BEACH
TITUSVILLE
PANAMA CITY
PENSACOLA TALLAHASSEE
JACKSONVILLE
ORLANDO
TAMPA
ST.PETERSBURG
MIAMI
LOCATION OF PROJECT
N
N.T.S.
UMATILLA, FLORIDA.
GAINESVILLE
AVCON, INC.
ENGINEERS & PLANNERS
5555 MICHIGAN STREET, SUITE 200, ORLANDO, FL.
32822
OFFICE: (407)599-1122
www.avconinc.com
MELBOURNE
UMATILLA, FLORIDA
PROJECT AREA
PROFESSIONAL SEAL
PLANS PREPARED BY:
GENERAL NOTESA1
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
3\
.3
.0
- X
A pr on a nd
B ea co n\
.3
.0
- C A
D D
\2
G
2.
dw g 3/
/2
2:
P M
UMATILLA MUNICIPAL
AIRPORT, UMATILLA,
FLORIDA
AIRCRAFT PARKING
APRON EXPANSION
XR
EF
S:
x
2_ tb 2335202G002
PROFESSIONAL SEAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. 453566-1-94-01
3-12-0026-017-2023
2023.352.02
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2025
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
1 2 3 4
B
C
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SHEET INDEXB4
ABBREVIATIONSA4
GENERAL NOTES
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT
THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE,
VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF
ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE
PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START
OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF
ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR
TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH
THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR
NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS
(I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS,
COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS,
ETC) AND ANY DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION. ANY COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS
OUTLINED ABOVE IS THE RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE
ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS
AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT
OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES
AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO
CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK
PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY MONUMENTATION,
AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT CONTRACTOR'S
EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR
INSPECTION REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT
CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS
AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL
AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY
PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING
ACCORDING TO AGENCY REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS
AND REQUIREMENTS OF THE CITY OF UMATILLA LAND DEVELOPMENT CODE AND
ENGINEERING STANDARDS, FAA ADVISORY CIRCULARS, PLUS THE CURRENT EDITION OF
THE FDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY
CONSTRUCTION, PLUS THE REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED
ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE
INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S
EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS IS FOR CONFORMITY WITH
THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE IN-DEPTH CHECK FOR THE
ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN A SAFE OR EFFICIENT
MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS DOES NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL ACCURACY TO ENSURE FIELD FIT
AND CONFORMITY OF THE VARIOUS COMPONENTS AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE
CHANGES SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO
JURISDICTIONAL AGENCIES.
11. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL
SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR
REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE
TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS
SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER
OF THE DEPARTMENT OF TRANSPORTATION.
12. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR DEWATERING.
DISCHARGE WATER FROM DEWATERING SHALL BE CLEAR WITH NO VISIBLE SOIL
PARTICLES. DISCHARGE WATER FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A
MANNER THAT IT WILL NOT INTERFERE WITH THE NORMAL DRAINAGE OF THE AREA IN
WHICH THE WORK IS BEING PERFORMED, OR CREATE PONDING. THE OPERATION SHALL
NOT CAUSE ANY DAMAGE TO ANY PORTION OF THE WORK COMPLETED, OR IN
PROGRESS. THE DEWATERING OPERATION SHALL COMPLY WITH THE REQUIREMENTS
OF APPLICABLE REGULATORY AGENCIES. A PRE-WORK MEETING WILL BE CONDUCTED
WITH THE OWNER, THE CONTRACTOR, AND THE ENGINEER PRIOR TO BEGINNING ANY
SITE EXCAVATION.
13. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON
COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S
ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA
REGISTERED PROFESSIONAL SURVEYOR.
14. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOULD BE ORDERED FROM FIELD
STAKED QUANTITIES. PLAN PIPE LENGTHS ARE MEASURED FROM CONNECTION POINT
TO END OF THE LINES FOR WATER LINES.
15. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS
AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO
BE RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED
TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY
PURPOSE.
16. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND
CONSTRUCTION OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
17. DURING THE WORK OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH, ERECT AND
MAINTAIN WHATEVER TEMPORARY LIGHTING MAY BE NECESSARY TO KEEP THE
TAXIWAY AND RUNWAY IN OPERATING CONDITION WHEN OPEN FOR AIRCRAFT.
18. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM
ALL PAVED SURFACES DURING THIS CONTRACT.
19. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN PROPOSED ASPHALT MILLINGS
ACCESS ROADS AT THE APPROXIMATE LOCATION SHOWN. PROPOSED ACCESS ROAD
MATERIAL SHALL BE MADE OF ASPHALT MILLINGS OR AN APPROVED EQUIVALENT.
20. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT
ALL TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON
ADJACENT PROPERTY.
21. TO THE EXTENT THAT WETLAND AREAS ARE KNOWN, THEY HAVE BEEN DEPICTED ON
THE CONTRACT DRAWINGS.
22. IN WETLAND AREAS, NO EXCAVATION, VEHICLES OR OTHER SOIL DISTURBANCE WILL BE
ALLOWED. ANY CLEARING REQUIRED WILL BE PREFORMED WITH HAND HELD TOOLS
AND REMOVED BY HAND. NO GRUBBING WILL BE ALLOWED.
23. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST
OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN
PREPARING UNIT PRICES FOR BID.
24. THE CITY OF UMATILLA RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE
CONTRACT AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND
MATERIALS.
25. THE CONTRACTOR SHALL BE AWARE THAT OTHER CONCURRENT PROJECTS MAY BE
UNDER CONSTRUCTION ON THE AIRPORT. IT WILL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE THEIR ACTIVITIES WITH THE OTHER CONTRACTORS
ON THE AIRPORT. THIS COORDINATION WILL NOT BE PAID SEPARATELY AND IS
CONSIDERED A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
26. ALL ELEVATIONS REFERENCE NAVD 88 VERTICAL DATUM. COORDINATES REFERENCE
NAD 83 HORIZONTAL DATUM.
27. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM FIELD SURVEY
PERFORMED BY BOWMAN CONSULTING GROUP, LTD, INC. DATED 10-10-2023.
28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QUALITY
ASSURANCE TESTING.
GRADING NOTES
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER.
2. THE QUANTITY OF UNCLASSIFIED EXCAVATION, ITEM P-152, INCLUDES 100 CY OF
UNDERCUT EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE
ENGINEER.
3. THE QUANTITY OF LIME ROCK BASE COURSE, ITEM P-211, INCLUDES 100 CY FOR
REPLACEMENT OF UNDERCUT EXCAVATION WHICH WILL BE USED ONLY WHEN
DIRECTED BY THE ENGINEER.
4. ALL SPOIL MATERIAL WHICH IS SUITABLE FOR EMBANKMENT AND EXCESS TOPSOIL
SHALL BE DISPOSED OF ON AIRPORT PROPERTY AS SHOWN ON THE CONTRACT
DRAWINGS, UNLESS OTHERWISE DIRECTED BY THE AIRPORT AUTHORITIES. SPOIL
MATERIAL WHICH IS NOT SUITABLE FOR EMBANKMENT SHALL BE DISPOSED OF OFF
AIRPORT.
5. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
6. THE LIMITS FOR SODDING ARE THE LIMITS OF GRADING SHOWN ON THE GRADING
PLANS. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL BE
RESTORED, WITH SOD, BY THE CONTRACTOR AT THEIR EXPENSE.
7. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION,
EROSION, AND SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER
POLLUTION PREVENTION, TEMPORARY SEEDING, TEMPORARY MULCHING,
CONSTRUCTION ROAD STABILIZATION, DUST CONTROL, PROTECTING VEGETATION, AND
EROSION AND SILTATION CONTROL PRACTICES DUE TO THE CONTRACTOR'S MEANS
AND METHODS, SHALL BE INCLUDED IN ITEM C-102 UNDER PAYMENT FOR "TEMPORARY
AIR & WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL"..
8. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN
PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED
UNTIL THE NEW SLOPES ARE STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.
9. ALL GRADING AREAS SHALL BE RESTORED WITH SOD AS DEPICTED ON THE
RESTORATION PLAN. ALL AREAS OF SODDING SHALL BE SMOOTH AND FREE OF RUTTING
AT THE COMPLETION OF THE PROJECT. WHERE ROLLED SOD IS UTILIZED,
MESH/NETTING SHALL BE REMOVED AND DISPOSED OFF SITE AT NO ADDITIONAL COST
TO THE OWNER. MESH NETTING SHALL NOT BE BURIED OR DISPOSED ON SITE.
10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH OF
GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND
MAINTAIN THE SOD AS NECESSARY TO ENSURE CURRENT AND FUTURE GROWTH.
PAVING NOTES:
1. ALL AREAS TO BE PAVED SHALL BE PREPARED IN ACCORDANCE WITH ITEM P-101,
"PREPARATION/REMOVAL OF EXISTING PAVEMENTS".
2. EMULSIFIED ASPHALT TACK COAT, ITEM P-603, SHALL BE APPLIED PRIOR TO PLACING
EACH LIFT OF PAVEMENT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. IN CASES OTHER THAN CENTERLINE JOINTS, LONGITUDINAL PAVING JOINTS IN ONE
LAYER SHALL BE OFFSET FROM THAT IN THE PREVIOUS LAYER BY AT LEAST ONE FOOT.
THE JOINT AT THE CENTERLINE OF THE PAVEMENT SHALL LINE UP WITH PREVIOUS
LAYER CENTERLINE JOINTS.
STORMWATER SYSTEM NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY INVERTS AND
LOCATIONS OF THE EXISTING STORM SEWER SYSTEM PRIOR TO SUBMITTAL OF SHOP
DRAWINGS AND CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY DISCREPANCY IN
INVERTS AND LOCATIONS EXIST.
2. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT INFORMATION/CUT
SHEETS, AND/OR CERTIFICATIONS FOR ALL STORM WATER STRUCTURES, STORM
SEWER PIPES, AND CONCRETE DESIGN MIX.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING
STORM SEWER SYSTEM IN SERVICE.
4. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS
SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN
RUN-OFF OR SEEPAGE IS PREVENTED OR MINIMIZED.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE AND NATIONAL
ELECTRICAL CODES.
2. THE ELECTRICAL CHARACTERISTICS OF PROPOSED EQUIPMENT SHALL BE VERIFIED TO
BE COMPATIBLE WITH EXISTING EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.
3. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF
ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR TO
REMOVAL. IF THEY ARE NOT ABANDONED, CABLES SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
4. ITEMS OF SPECIFIC MANUFACTURE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS AND OR MANUFACTURER'S
REPRESENTATIVE DIRECTIONS.
5. ALL GROUND CONNECTIONS SHALL BE MADE USING EXOTHERMIC CONNECTIONS.
6. ALL CABLE CONNECTIONS SHALL BE MADE AT LIGHT UNITS OR AT ENDS OF DUCT BANKS
UNLESS DIRECTED OTHERWISE.
7. ALL ELECTRICAL EQUIPMENT REMOVED WHICH IS DESIRED BY THE OWNER TO BE
SALVAGED SHALL BE TURNED OVER TO THE OWNER. THE EQUIPMENT SHALL BE
STOCKPILED AT A LOCATION DESIGNATED BY THE OWNER IN PROPER WORKING
CONDITION. ALL OTHER MATERIALS SHALL BE SPOILED OFF AIRPORT PROPERTY AT A
PROPER DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE.
8. PROVIDE WATERTIGHT TERMINATION FOR ALL BURIED CONDUIT ENDS.
9. ALL RUNWAY AND TAXIWAY EDGE LIGHTS SHALL BE LOCATED 10 FEET OFF THE DEFINED
PAVEMENT EDGE UNLESS OTHERWISE NOTED OR DIRECTED. THE CONTRACTOR SHALL
ALIGN ALL LIGHTS ON TANGENT SECTIONS SUCH THAT THEY FORM A STRAIGHT LINE.
SEAL
KNM
KNM
DJN
G002
ABAN. - ABANDONED
APPROX. - APPROXIMATE
ASPH. - ASPHALT
BL - BASELINE
BLDG. - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW/ARM
ELEV, - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT - LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
M.E.G. - MEET EXISTING GRADE
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION
ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSSLINKED POLYETHYLENE
PRESSURE TUBING
PVT - POINT OF TANGENCY (VERTICAL
CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED
POLYETHYLENE PIPE
STA - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP - TYPICAL
UG - UNDERGROUND
GENERAL NOTES,
SHEET INDEX &
ABBREVIATIONS
R
SA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
0.0000
TL
OFA
TLOFA TLOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
E E
E
E
E
GRAPHIC SCALE (FT)
1206030
N O
R
TH
CONSTRUCTION SAFETY AND PHASING PLANB1
SHEET LEGENDA1 CONSTRUCTION SAFETY AND PHASING NOTESA2
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
3\
.3
.0
- X
A pr on a nd
B ea co n\
.3
.0
- C A
D D
R eB id
\2
G
3.
dw g 3/
/2
2:
P M
UMATILLA MUNICIPAL
AIRPORT, UMATILLA,
FLORIDA
AIRCRAFT PARKING
APRON EXPANSION AND
ROTATING BEACON
REHABILITATION
XR
EF
S:
x
2_ tb x
2_
Ba se m ap x
2_ G eo m x
2_ C
SP
P x2
_A irf
Li te
2335202G003
PROFESSIONAL SEAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453566-1-94-01
3-12-0026-017-2023
2023.352.02
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MAY 2024
KNM
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
1 2 3 4
B
C
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN
G003
DJN
KNM
KNM
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING FENCELINE, (TYP.)
RUNWAY OBJECT FREE
AREA, (TYP.)
RUNWAY SAFETY
AREA, (TYP.)
EXISTING
TREELINE,
(TYP.)
WETLAND
LIMIT
PROPOSED CHAIN-LINK FENCE, SEE
THE GEOMETRY PLAN FOR
ADDITIONAL INFORMATION.
NEW GRASS AIRCRAFT TIE-DOWN
AREAS, SEE THE GEOMETRY PLANS
FOR ADDITIONAL INFORMATION.
NEW TAXIWAY EDGE LIGHTING,
SEE THE ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION.
NEW AIRCRAFT TIE-DOWN LOCATION WITH
IN-PAVEMENT TIE-DOWN ANCHORS. SEE THE
GEOMETRY PLANS FOR ADDITIONAL INFORMATION.
NEW APRON SITE LIGHTING, (TYP.).
NEW BURIED ELECTRIC
LINE AND CONDUIT,
(TYP.).
TAXIWAY OBJECT
FREE AREA, (TYP.).
EXISTING
PARKING LOT
EXISTING AIRFIELD
ELECTRICAL VAULT
EXISTING
ROUNDABOUT EXISTING AIRCRAFT
PARKING APRON
PROPOSED NON-MOVEMENT
AREA MARKING, (TYP.).
CONTRACTOR ACCESS ROUTE, (TYP.)
RUNWAY 1-19 (2,875' X 60')
TAXIWAY
HANGAR
T-HANGARS
T-HANGARS
BOX HANGARHANGAR
EXISTING BLDG
ABANDONDED FBO
TAXILANE
TAXILANE
MATUSIK WAY
EAST C
ASSAD
Y STR
EET
CONTRACTOR ACCESS TO EAST CASSADY SHALL BE FROM ROSE STREET/SOUTH
PINE AVE OR FROM U.S. HWY 19. CONTRACTOR TO EXERCISE EXTREME CAUTION
REGARDING CONSTRUCTION TRAFFIC NOISE ALONG THE RESIDENTIAL ROADS
OUTSIDE OF WORKING HOURS, AS WELL AS ADHERE TO ALL POSTED SPEED
LIMITS AT ALL TIMES.
CONTRACTOR STAGING,
LAY-DOWN, STORAGE, AND
PARKING AREA
WORK AREA A BOUNDARY
WORK AREA B BOUNDARY
WORK AREA B-1 BOUNDARY
WORK AREA C BOUNDARY
STABILIZED ACCESS ROAD,
ITEM GP-80, SEE DETAIL
B3/G004 FOR ADDITIONAL
INFORMATION
TAXI ROUTE, COLOR
CORRESPONDS TO THE
APPLICABLE WORK AREA
CONTRACTOR ACCESS
ROUTE
LOW PROFILE BARRICADES
(COLOR CORRESPONDS TO
THE APPLICABLE WORK
AREA), SEE DETAIL A3/G004
FOR ADDITIONAL
INFORMATION.
WORK AREA A
1. WORK AREA A SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA
LIMITS, INCLUDING, BUT NOT LIMITED TO EXCAVATION/GRADING, DRAINAGE, SITE LIGHTING, PAVING, PAVEMENT MARKING OPERATIONS, AND GRUBBING.
2. WORK AREA A SHALL BE LIMITED TO 90 CONSECUTIVE CALENDAR DAYS. WORKING HOURS
SHALL BE MONDAY-FRIDAY, 7:00AM-5:00PM. THE OWNER SHALL BE NOTIFIED TWO WEEKS
IN ADVANCE OF THE START OF WORK AREA A.
3. FOR THE DURATION OF WORK AREA A, THERE WILL BE NO ACCESS TO TWO OF THE
EXISTING AIRCRAFT TIE-DOWN AREAS. RUNWAY 1-19, THE REMAINING APRON AREA, AND
ADJACENT APRON CONNECTOR SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF
THIS WORK AREA.
WORK AREA B
1. WORK AREA B SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA
LIMITS, INCLUDING, BUT NOT LIMITED TO EXCAVATION/GRADING, DRAINAGE, AIRFIELD
ELECTRICAL, PAVING, AND PAVEMENT MARKING OPERATIONS.
2. WORK AREA B SHALL BE LIMITED TO 7 CONSECUTIVE CALENDAR DAYS. WORKING HOURS
SHALL BE MONDAY-FRIDAY, 7:00AM-5:00PM. THE OWNER SHALL BE NOTIFIED TWO WEEKS
IN ADVANCE OF THE START OF WORK AREA B.
3. FOR THE DURATION OF WORK AREA B, THERE WILL BE A PARTIAL TAXIWAY CLOSURE. THE
NEW APRON AREA, EXISTING APRON AREA, ADJACENT APRON CONNECTOR, AND RUNWAY
1-19 SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THIS WORK AREA.
WORK AREA B-1
1. WORK AREA B-1 SHALL CONSIST OF PAVEMENT MARKING OPERATIONS ONLY.
2. WORK AREA B-1 SHALL BE LIMITED TO 1 CONSECUTIVE CALENDAR DAYS AND BE
CONCURRENT WITH WORK AREA B. WORKING HOURS SHALL BE MONDAY-FRIDAY,
7:00AM-5:00PM. THE OWNER SHALL BE NOTIFIED 48-HOURS IN ADVANCE OF THE START OF
WORK AREA B-1.
3. FOR THE DURATION OF WORK AREA B-1, THERE WILL BE A PARTIAL TAXIWAY CLOSURE.
RUNWAY 1-19 AND THE PORTION OF THE TAXIWAY SOUTH OF THE WORK AREA SHALL
REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THIS WORK AREA.
WORK AREA C
1. WORK AREA C SHALL CONSIST OF ALL PROJECT RELACTED SCOPE WITHIN THE WORK
AREA LIMITS, INCLUDING, BUT NOT LIMITED TO THE BEACON REHABILITATION, VAULT
MODIFICATIONS, AND UTILITY INSTALLATIONS.
2. WORK AREA C SHALL BE CONCURRENT TO WORK AREAS A AND B. WORKING HOURS SHALL
BE MONDAY-FRIDAY, 7:00AM-5:00PM. THE OWNER SHALL BE NOTIFIED OF ANY POTENTIAL
IMPACTS TO THE BEACON, VAULT, AND ANY AIRFIELD ELECTRICAL 48-HOURS PRIOR TO
ANY SERVICE INTERRUPTION FOR THE DURATION OF THIS WORK AREA.
3. THERE ARE NO ANTICIPATED IMPACTS TO RUNWAY 1-19, THE APRON, OR THE TAXIWAY FOR
WORK AREA C.
SHEET NOTES:
1. HALF-RATE PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE START OF THE
SUBSEQUENT WORK AREA.
2. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT
ALL TIMES.
3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE DESIGNATED WORK
AREA WITHOUT PRIOR APPROVAL OR PROPER COORDINATION WITH THE ENGINEER/RPR.
DOING SO MAY RESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE
AIRPORT.
4. THE CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING
AIRPORT FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NOT
ADDITIONAL COST TO THE OWNER.
5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE
ENGINEER AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS
FOR LOCALIZED CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER IN
ADVANCE OF THE START OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED
REPRESENTATIVE CAPABLE OF COMMUNICATING WITH THE LOCAL AIR TRAFFIC AND
KNOWLEDGEABLE ABOUT MOVEMENT ON ACTIVE AIRFIELD PAVEMENT AREAS. THE
CONTRACTOR SHALL CLOSELY COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE
AIRFIELD PAVEMENT WITH THE AIRPORT, AIR TRAFFIC, AND THE RESIDENT ENGINEER.
6. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY
CIRCUMSTANCES, OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONNEL VEHICLES
PARKING AREA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR VEHICLES OR
CONSTRUCTION VEHICLES SHALL BE PERMITTED OUTSIDE THE STAGING AREA OR THE
ACTIVE WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.
7. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE
CONTINUALLY SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE
AIRFIELD PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST,
OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED
BY THE RPR AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND
PHASING PLAN.
8. PRIOR TO THE START OF WORK WITHIN THE WORK AREA, THE CONTRACTOR SHALL
ACTIVATE ANY ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROJECT WORK
AREA AND TAKE NOTE OF ITS EXISTING CONDITIONS. AFTER CONCLUDING WORK WITHIN
THE WORK AREA, THE CONTRACTOR SHALL TAKE NOTE OF THE FINAL CONDITION OF ALL
ELECTRICAL FIXTURES. THE CONTRACTOR MAY BE RESPONSIBLE FOR REPLACE OR
REPAIR OF ANY ELECTRICAL FIXTURES THAT ARE DAMAGED OVER THE COURSE OF THE
PROJECT OR THAT HAVE BEEN NEGATIVELY IMPACTED AS A RESULT OF THE
CONSTRUCTION OPERATIONS IN THE OPINION OF THE ENGINEER.
9. THE CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT
THE END OF EACH DAY WHICH SHALL INCLUDE THE UTILIZATION OF THE FOD-RAZOR
FRICTION MAT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED USING THE
FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION O THE RPR. NO ADDITIONAL
MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF THE FOD-RAZOR FRICTION MAT
AND SHALL BE CONSIDRED INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND
PHASING PLAN.
10. DUST CONTROL IS CONSIDERED A NECESSARY PART OF WORK AND SHALL BE
IMPLEMENTED CONTINUOUSLY THROUGHOUT EACH WORK AREA. THE CONTRACTOR
SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY THE RPR/ENGINEER
AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING PLAN. IF
INADEQUATE DUST CONTROL OCCURS, THE RPR OR ENGINEER RESERVE THE RIGHT TO
HAULT CONSTRUCTION WORK UNTIL ALL DUST IS UNDER CONTROL AND SWEPT AS IT IS A
HAZARD TO AIR TRAFFIC.
11. THE TOTAL APPROXIMATE PROJECT AREA FOR GOPHER TORTOISE SURVEY IS 9.57 AC.
GOPHER TORTOISE SURVEY
BOUNDARY, SEE DETAIL
C4/G004 FOR ADDITIONAL
INFORMATION AND
REQUIREMENTS
EXISTING BEACON TO BE
REMOVED
FLAGGER FOR WORK
AREA C
NEW BEACON AND
ELECTRICAL LINE
WETLAND BUFFER LIMIT
CONSTRUCTION SAFETY AND PHASING NOTESA1
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
3\
.3
.0
- X
A pr on a nd
B ea co n\
.3
.0
- C A
D D
\2
G
4.
dw g 3/
/2
2:
P M
UMATILLA MUNICIPAL
AIRPORT, UMATILLA,
FLORIDA
AIRCRAFT PARKING
APRON EXPANSION
XR
EF
S:
x
2_ tb 2335202G004
PROFESSIONAL SEAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. 453566-1-94-01
3-12-0026-017-2023
2023.352.02
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2025
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
1 2 3 4
B
C
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
STABILIZED ACCESS ROAD DETAILB3
LOW PROFILE BARRICADE DETAILA3
SEAL
CONSTRUCTION
SAFETY AND
PHASING NOTES
AND DETAILS
G004
GOPHER TORTOISE SURVEY NOTESC4
AVIATION FLAG DETAILB4
CONSTRUCTION SAFETY PHASING NOTES:
1. THE WORK AREAS A, B, B-1, AND C SHALL CONSIST OF ALL PROJECT RELATED SCOPE
WITHIN THE WORK AREA LIMITS INCLUDING, BUT NOT LIMITED TO DRAINAGE
IMPROVEMENTS, EXCAVATION/GRADING, PAVING OPERATIONS, AND UTILITY WORK.
2. THE START DATE FOR PROPOSED WORK SHALL BE COORDINATED WITH THE OWNER
AND ENGINEER AT LEAST 72 HOURS IN ADVANCE. NOTAMS SHALL BE IN PLACE 72
HOURS IN ADVANCE PRIOR TO ANY TAXIWAY CLOSURES.
3. IN THE EVENT THAT THE CONTRACTOR'S ACCESS ROUTE IS UNAVAILABLE AT THE TIME
OF CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE
BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, LAY-DOWN, STOCKPILE, AND
PERSONAL VEHICLE PARKING AREA.
4. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND
LANDSIDE)CLEAN AND FREE OF DEBRIS. A POWER BROOM AND/OR SWEEPER TRUCK
SHALL BE ON SITE AND AVAILABLE AT ALL TIMES FOR CLEANING OF PAVEMENT
SURFACES. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND
MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND
INCIDENTAL PORTION OF THE WORK.
5. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY
THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR
CONSTRUCTION SITE DUST CONTROL, AS IT IS A NECESSARY AND INCIDENTAL
PORTION OF THE WORK.
6. THE CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES NECESSARY
TO BE INSTALLED ALONG PUBLIC ROADS DURING CONSTRUCTION TO MEET ALL FDOT
MAINTENANCE OF TRAFFIC REQUIREMENTS.
7. EXISTING PAVEMENT DISTURBED BY WORK IN THE DESIGNATED WORK AREA SHALL BE
RESTORED TO ORIGINAL CONDITION OR BETTER. ALL COSTS ASSOCIATED WITH THE
RESTORATION OF ANY DISTURBED PAVEMENT SHALL BE BORNE BY THE CONTRACTOR.
8. THE CONTRACTOR, EMPLOYEES, SUBCONTRACTORS, SUPPLIERS AND ANY OTHER
UNAUTHORIZED PERSONS ARE ONLY PERMITTED TO ACCESS THE WORK AREA
THROUGH THE STAGING AREA SHOWN ABOVE.
9. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH AN ORANGE AND
WHITE CHECKERED FLAG ON THE HIGHEST POINT OR A FLASHING/ROTATING AMBER
CONSTRUCTION BEACON.
10. ACCESS TO THIS PROJECT REQUIRES USE OF EXISTING CITY AND AIRPORT ROADS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL ACCESS
SURFACES REMAIN CLEAN AND CLEAR OF DIRT AND DEBRIS AT ALL TIMES.
11. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY AND
ALL DAMAGE INFLICTED UPON THE ACCESS ROUTES OVER THE DURATION OF THE
PROJECT. THE ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND
POST-CONDITION OF ALL ACCESS ROUTES. ANY MEASURABLE DAMAGE SHALL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
12. THE WORK OF THIS PROJECT REQUIRES WORKING IN THE VICINITY OF AN ADJACENT
TO EXISTING TAXIWAYS AND PARKED AIRCRAFTS. THE CONTRACTOR SHALL YIELD TO
AIRCRAFT TRAFFIC AT ALL TIMES, AND SHALL MAKE ALL NECESSARY ARRANGEMENTS
TO PREVENT IMPACTS TO EXISTING TENANTS WITHOUT PROPER/EXTENDED NOTICE.
13. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH FAA ADVISORY
CIRCULAR AC 150/5370-2, LATEST EDITION AND FDOT MOT SPECIFICATIONS WHEN
NECESSARY.
14. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT INFORMATION OF
KEY AIRPORT PERSONNEL.
15. THE BARRICADES INDICATED ON THE PLAN REPRESENT THE TRAFFIC CONTROL
REQUIRED DURING CONSTRUCTION. IN THE EVENT THAT MORE TRAFFIC CONTROL IS
REQUIRED DURING CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DETERMINE THE NUMBER AND LOCATION OF BARRICADES REQUIRED TO KEEP THE
ACTIVE WORK AREA PROTECTED DURING CONSTRUCTION. THE CONTRACTOR SHALL
ALSO BE RESPONSIBLE FOR THE NUMBER AND LOCATION OF BARRICADES DURING
ANY TAXIWAY CLOSURES IF NECESSARY.
16. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN COMPLIANCE
CERTIFICATION (SPCC). THIS DOCUMENT CERTIFIES THAT THE CONTRACTOR HAS READ
AND UNDERSTANDS THE SAFETY AND PHASING REQUIREMENTS OF THE PROJECT.
ADDITIONALLY THE CONTRACTOR AGREES TO FOLLOW THE RULES AND
REQUIREMENTS OF THIS SAFETY AND PHASING PLAN, THE CONTRACT DOCUMENTS
AND THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2, LATEST EDITION. A
NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE SPCC IS SUBMITTED.
17. NO BADGING IS REQUIRED FOR THIS PROJECT/AIRPORT, HOWEVER THE CONTRACTOR
SHALL BE REQUIRED TO COORDINATE WITH THE OWNER FOR ACCESS THROUGH THE
AUTOMATED GATES.
18. SHOP VAC SHALL BE IN CONTINUOUS USE WHEN REMOVING ASPHALT SLURRY DURING
PAVEMENT CORE TESTING. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
PROVIDE AND OPERATE THE SHOP VAC.
INSPECTION REQUIREMENTS:
1. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE INSPECTED FOR ANY
FOREIGN OBJECT DEBRIS (FOD) ON AIRFIELD OR NON AIRFIELD PAVEMENTS AND FOR
ANY EXCESS CONSTRUCTION MATERIALS LEFT IN THE TAXIWAY OR TAXIWAY OBJECT
FREE AREA.
2. AT THE BEGINNING OF EACH CONSTRUCTION DAY, THE CONTRACTOR SHALL VERIFY
ALL BARRICADES ARE PLACED CORRECTLY.
SAFETY REQUIREMENTS:
1. DURING PERFORMANCE OF THIS CONTRACT, AIRPORT TAXIWAYS AND APRON AREA
SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. AIRCRAFT
USE OF AREAS NEAR THE CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE
DISTURBANCE TO THE CONTRACTOR'S OPERATION. THE CONTRACTOR SHALL NOT
ALLOW EMPLOYEES, SUBCONTRACTORS, SUPPLIERS OR ANY OTHER UNAUTHORIZED
PERSON TO ENTER OR REMAIN IN ANY AIRPORT AREA WHICH WOULD BE HAZARDOUS
TO PERSONS OR TO AIRCRAFT OPERATIONS.
2. ALL WORK WHICH IS TOO CLOSE TO AN ACTIVE TAXIWAY TO BE PERFORMED UNDER
OPERATIONAL CONDITIONS SHALL BE PERFORMED WHEN THE TAXIWAY IS NOT IN USE.
SUCH WORK SHALL NOT BE ACCOMPLISHED WITHOUT PRIOR PERMISSION FROM THE
OWNER OR ENGINEER.
3. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO ENSURE THE
SAFETY OF OPERATING AIRCRAFT AS WELL AS THAT OF HIS OWN EQUIPMENT AND
PERSONNEL. THE CONTRACTOR SHALL OBEY ALL INSTRUCTIONS AS TO ROUTES TO BE
TAKEN BY EQUIPMENT TRAVELING WITHIN THE AIRPORT AREA. THE CONTRACTOR
SHALL MAKE HIS OWN ESTIMATE OF ALL DIFFICULTIES TO BE ENCOUNTERED.
4. THE CONTRACTOR OR THEIR PROJECT REPRESENTATIVE SHALL NOTIFY THE AIRPORT
REPRESENTATIVE PRIOR TO STARTING WORK EACH DAY AND WHEN WORK HAS BEEN
COMPLETED FOR THE DAY. IT SHALL ALSO BE THE CONTRACTOR OR THEIR
REPRESENTATIVE'S RESPONSIBILITY TO MAKE A THOROUGH CHECK OF THE WORK
AREAS, TO SEE THAT ALL EQUIPMENT HAS BEEN RETURNED AND PARKED IN THE
PARKING AREAS DESIGNATED BY THE ENGINEER.
5. EQUIPMENT NOT IN OPERATION SHALL BE KEPT CLEAR OF ACTIVE OPERATIONAL
AREAS; PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN ACTIVE
OPERATIONAL AREAS OF THE AIRPORT WITHOUT SPECIFIC PERMISSION FROM THE
OFFICE OF THE AIRPORT REPRESENTATIVE.
6. ALL CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO HAVE A FLAG
ON STAFF OR A YELLOW/AMBER LENS ROTATING/FLASHING LIGHT MOUNTED ON THE
ROOF OR SO ATTACHED TO THE VEHICLE THAT THE FLAG OR LIGHT WILL BE READILY
VISIBLE. THE FLAG SHOULD BE NO LESS THAN 3 FEET SQUARE CONSISTING OF A
CHECKERED PATTERN OF INTERNATIONAL ORANGE AND WHITE SQUARES OF NOT
LESS THAN ONE FOOT ON EACH SIDE. THE CONTRACTOR SHALL HAVE A SUFFICIENT
NUMBER OF FLAGS AND STAFFS TO PROVIDE FOR ALL VEHICLE AND EQUIPMENT
NEEDS.
7. EMPLOYEE PARKING AND ACCESS TO THE JOB SITE BY ALL CONTRACTOR PERSONNEL
AND CONSTRUCTION VEHICLES AND EQUIPMENT SHALL BE AS SHOWN ON SHEET G003.
8. UNAUTHORIZED ENTRANCE OF CONTRACTOR EMPLOYEES AND EQUIPMENT INTO AN
AIR OPERATIONS AREA WILL BE CAUSE FOR IMMEDIATE ACTION AS PROVIDED FOR IN
GENERAL PROVISIONS SUBSECTION TITLED CHARACTER OF WORKERS METHODS AND
EQUIPMENT OF SECTION 80.
9. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS
ADEQUATE FIRE AND SAFETY PRECAUTIONS ARE PROVIDED AND HAVE BEEN
APPROVED BY THE ENGINEER.
10. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE CONSTRUCTION
SITE SHALL BE PROMINENTLY MARKED WITH ORANGE FLAGS AND LIGHTED BY LIGHT
UNITS OR LOW PROFILE LIGHTED BARRICADES DURING HOURS OF RESTRICTED
VISIBILITY AND/OR DARKNESS.
11. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT
MOVEMENT RESULTING FROM MAXIMUM ANTICIPATED AIRCRAFT BLAST AND WIND
CONDITIONS.
12. WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING
GEARS, PROPELLERS OR BEING INGESTED IN JET ENGINES, SHALL NOT BE PLACED ON
ADJACENT TAXIWAY PAVEMENT AREAS. MATERIALS TRACKED ON THESE AREAS SHALL
BE REMOVED CONTINUOUSLY DURING THE PROJECT.
BARRICADE NOTES:
1. LOW-PROFILE, WATER-FILLED BARRICADES SHALL BE USED WHERE WORK IS
ADJACENT TO ACTIVE AIRCRAFT RUNWAYS, TAXIWAYS, OR APRONS, OR AS SHOWN ON
THE PLANS. CAUTION LIGHTS TO BE HIGH INTENSITY RED IN COLOR AND FLASHING
DURING HOURS OF DARKNESS. BARRICADE LIGHTS SHALL BE 360° OMNIDIRECTIONAL.
ALL BARRICADE LIGHTING SHALL BE VERIFIED BY THE CONTRACTOR FOR PROPER
OPERATION AT THE END OF EACH DAY OR NIGHT BEFORE CONTRACTOR CEASES
OPERATION.
2. BARRICADES SHALL NOT BE PLACED INSIDE ANY ACTIVE RUNWAY SAFETY AREA, OR
INSIDE ANY ACTIVE TAXIWAY OR TAXIWAY OBJECT FREE AREA.
3. ALL BARRICADES SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A
WEEKLY BASIS AND SHALL BE REPAINTED WHEN DEEMED APPROPRIATE BY THE RPR.
THE CONDITIONS OF LIGHTING UNITS SHALL BE CHECKED DAILY. ALL LIGHT FIXTURES
SHALL BE VERIFIED OPERATING BY THE CONTRACTOR ON A DAILY BASIS BEFORE THE
CONTRACTOR CEASES OPERATION FOR THE DAY.
4. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE A WEEK AND THE CONTRACTOR
SHALL SWEEP THE DEBRIS WHICH HAS ACCUMULATED AND REMOVE FROM THE SITE.
THE BARRICADES SHALL THEN BE REPLACED AT THE APPROPRIATE LOCATION.
5. BARRICADES SHALL BE SPACED 4' MAXIMUM, END-TO-END, OR AS DIRECTED BY THE
RPR. AT LEAST ONE 15' GAP IN EACH LINE OF BARRICADES SHALL BE PROVIDED FOR
EMERGENCY VEHICLE ACCESS.
6. CAUTION LIGHTS SHALL BE RED IN COLOR AND FLASHING OR STEADY BURNING
DURING HOURS OF DARKNESS.
7. ALL BARRICADES SHALL BE FILLED WITH WATER OR WEIGHED DOWN WITH 2 50-LB
SAND BAGS.
A
A
STABILIZED
CONSTRUCTION
ENTRANCE
ST
AB
IL
IZ
ED
AC
C
ES
S R
O
AD
EX
IS
TI
N
G R
O
AD
RADIUS SHALL BE CONTRACTOR
DETERMINED AS REQUIRED FOR
CONSTRUCTION VEHICLES, AND SHALL
BE NOT LESS THAN 25', TYP. BOTH SIDES.
PLAN VIEW
20' MINIMUM
EXISTING
GRADE
6" M
IN
IM
U M
ASPHALT MILLINGS OR A STABILIZED
MATERIAL APPROVED BY THE
ENGINEER.
SUITABLE FILL MATERIAL EXISTING SUBGRADE
SOILDS SHALL BE COMPACTED TO 95% OF THE
STANDARD PROCTOR.
SECTION A-A
NOTE:
1. CONTRACTOR ACCESS ROAD SHALL NOT BLOCK OR IMPEDE ANY EXISTING DRAINAGE
LINES OR PATHS PRESENT AT THE SITE. ADDITIONALLY, CROSS SLOPE OF THE ROAD
SHALL BE AS REQUIRED TO PROVIDE ADEQUATE DRAINAGE WITHOUT IMPEDING OR
RESTRICTING EXISTING FLOW LINES OR DRAINAGE PATHS.
2. CONTRACTOR ACCESS ROAD SHALL BE MAINTAINED THROUGHOUT THE PROJECT,
INCIDENTAL TO ITEM GP-80, STABILIZED CONSTRUCTION ENTRANCE. THE ACCESS ROAD
SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT AND THE AREA RESTORED TO
MATCH THE EXISTING CONDITION.
3. ANY DIRT OR SEDIMENT TRACKED ONTO EXISTING PAVEMENTS SHALL BE
SWEPT/CLEANED PRIOR TO LEAVING THE SITE EACH DAY.
4. ALL MATERIALS REQUIRED FOR THIS ITEM SHALL BE PAID FOR UNDER ITEM GP-80
STABILIZED ACCESS ROAD.
1. THE CONTRACTOR SHALL COMPLETE A GOPHER TORTOISE SURVEY, PAID UNDER ITEM
"GOPHER TORTOISE SURVEY/PROTECTION." SURVEY RESULTS SHALL BE PROVIDED TO
THE ENGINEER ONCE COMPLETED.
2. CONTRACTOR SHALL PROTECT ALL DISCOVERED BURROWS IN ACCORDANCE WITH THE
FLORIDA FISH AND WILDLIFE REQUIREMENTS.
3. CONTRACTOR SHALL BE REQUIRED TO OBTAIN THE NECESSARY GOPHER TORTOISE
RELOCATION PERMITS. THIS WORK WILL BE PAID UNDER ITEM "GOPHER TORTOISE
PERMIT."
4. ALL COSTS FOR DIGGING, RELOCATION OF GOPHER TORTOISES, BACKFILLING, AND
PERMITS FOR THE RECIPIENT SITE SHALL BE PAID UNDER THE ALLOWANCE, ITEM,
"GOPHER TORTOISE BURROW EXCAVATION AND RELOCATION."
5. THE CONTRACTOR SHALL TRACK TIME AND MATERIALS FOR THE EFFORT NECESSARY
TO EXCAVATE ALL IDENTIFIED BURROWS.
6. THE GOPHER TORTOISE SURVEY SHALL BE COMPLETED AS SOON AS POSSIBLE.
EXCAVATION AND RELOCATIONS SHALL BE COMPLETED BEFORE THE START OF WORK
AREA A. GOPHER TORTOISE EXCAVATION AND RELOCATION WORK COMPLETED PRIOR
TO THE CONTRACT BEGINNING SHALL NOT COUNT AGAINST OVERALL CONTRACT TIME.
CAUTION LIGHT
SECURED TO BARRIER
(TWO PER BARRIER)
COLOR: RED
REFLECTIVE MEDIA (ORANGE
AND WHITE STRIPES)
4' (TYP)
SEE NOTES
WATER-FILLED
BARRICADE
NOTES:
1. LOW PROFILE BARRICADES SHALL BE SUFFICIENTLY WEIGHTED TO PRECLUDE MOVEMENT
FROM PROP BLAST.
2. FLAT, DIRECTIONAL WARNING LIGHTS SHALL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION BY THE ENGINEER.
4. BARRICADES SHALL BE WATER FILLED OR WEIGHED IN A WAY TO PREVENT MOVEMENT
DUE TO WIND, JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL NOT BE PAID
SEPARATELY AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND
PHASING PLAN.
AVIATION ORANGE
AVIATION WHITE
3' MIN.
3' M
IN
NOTES:
1. THE CONTRACTOR SHALL PROMINENTLY DISPLAY AVIATION SAFETY FLAGS ON ALL
CONSTRUCTION VEHICLES AND EQUIPMENT AT THE HIGHEST POINT ON EACH
PIECE OF CONSTRUCTION EQUIPMENT.
2. COST SHALL BE INCLUDED IN GP-80, CONSTRUCTION SAFETY AND PHASING PLAN.
DJN
5.0
104.00
104.50 105.00
104.00
4.0
104.00
104.00
104.00
105.00
103.00
4.0
105.00
103.00
104.00104.00
103.00 103.00
117.00
117.00
117.00
116.00
116.00115.00
114.0011 3.0
4.0
104.00
105.00104.00
105.00
104.00 103.00
104.00
103.00
103.00
104.00
104.00
105.00
105.00
104.00
104.00
4.0
105.00
105.00
104.00
104.00
104.00
104.50
103.50
103.50
104.50
104.50
104.50 104.50
103.50
102.50
103.50
3.5
YHYH
T C
M
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
LP
A
A A
E
YH
EMH
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
S
WW
W
WW
E
LP
E
LPLP
19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
0+
0+
FENCE
DEMOLITION LIMIT
N: 1670130.16 E: 447333.77
PAVEMENT
DEMOLITION LIMIT
N: 1670402.73 E: 447361.14
PAVEMENT DEMOLITION LIMIT
N: 1670392.48 E: 447527.33
GRUBBING LIMIT
N: 1670422.16
E: 447213.26
GRUBBING LIMIT
N: 1670405.70
E: 447491.20
PAVEMENT
DEMOLITION LIMIT
N: 1670539.71 E: 447565.61
PAVEMENT DEMOLITION LIMIT
N: 1670538.92
E: 447578.37
MARKING
DEMOLITION
LIMIT
N: 1670182.50 E: 447511.53
MARKING DEMOLITION LIMIT
N: 1670182.40
E: 447513.81
OH/T
OH/T
0.0000
CB
LS
C O
C O
CB
N O
R
TH
GRAPHIC SCALE (FT)
603015
N O
R
TH
EXISTING CONDITIONS & CIVIL DEMOLITION PLANB1
SHEET LEGENDA1 SHEET NOTESA2
SEAL
EXISTING
CONDITIONS & CIVIL
DEMOLITION PLAN
(SHEET 1 OF 2)
C001
AIRPORT PROPERTY LINE, (TYP.)
EXISTING FENCELINE, (TYP.)
EXISTING APRON
CONNECTOR ALIGNMENT,
SEE SHEET C251 FOR
ADDITIONAL INFORMATION.
EXISTING TAXIWAY
ALIGNMENT, SEE SHEET
C251 FOR ADDITIONAL
INFORMATION.
TAXIWAY
T-HANGAR
T-HANGAR
TAXILANE
TAXILANE
EXISTING BLDG
ABANDONED
FBOCONCRETE
APRON,
(TYP.)
EXISTING PARKING LOT
EXISTING
ROUNDABOUT
EAST C
ASSAD
Y STR
EET
ACCESS ROAD
EXISTING CANTILEVER
GATE WITH CARD
READER ACCESS AND
GATE OPERATOR
SANITARY FORCE
MAIN, (TYP.)
BURIED UNDERGROUND
ELECTRICAL, (TYP.)
WATER MAIN, (TYP.)
YARD
DRAIN,
(TYP.)
BACKFLOW
PREVENTOR, (TYP.)
BURIED COMMUNICATION
LINE, (TYP.)
END
CONDITION
UNKNOWN EXISTING
ANTENNA
ELECTRICAL PULL BOX, (TYP.)
TRANSFORMER,
(TYP.)TREE, (TYP.)
COMMUNICATIONS
PULL BOX, (TYP.)
BOLLARDS,
(TYP.)
CONCRETE
SIDEWALK
EXISTING BEACON, SEE THE
ELECTRICAL PLANS FOR ADDITIONAL
INFORMATION.
GATE VALVE,
(TYP.)TAXIWAY OBJECT
FREE AREA, (TYP.)
EXISTING LIGHT
POLE, (TYP.)
AIRFIELD ELECTRICAL
MANHOLE, (TYP.)
AIRFIELD
ELECTRICAL
VAULT
AIRFIELD ELECTRICAL CONDUIT,
CABLE, AND COUNTERPOISE, (TYP.)
TAXIWAY EDGE
LIGHT, (TYP.)
EXISTING TAXIWAY
CENTERLINE MARKING
EXISTING AIRCRAFT
TIE-DOWN WITH
IN-PAVEMENT ANCHOR,
(TYP.)
EXISTING TIE-DOWN AND
ANCHORS SHALL BE
PROTECTED IN PLACE.
EXISTING TIE-DOWN AND ANCHORS
SHALL BE PROTECTED IN PLACE.
LIMIT OF TOPOGRAPHIC SURVEY, (TYP.)
EXISTING
PEDESTRIAN
GATE
18" HDPE DRAINAGE PIPE
MITERED END SECTION
INV: 101.99'
EXISTING DIRT STOCKPILE. STOCKPILE TO BE USED AS
BORROW, INCIDENTAL TO ITEM P-152, UNCLASSIFIED
EXCAVATION. AREA SHALL BE RE-GRADED AND
RESTORED, SEE THE GRADING PLAN FOR ADDITIONAL
INFORMATION.
DRY RETENTION
AREA
INTERMEDIATE
HOLD BAR
MARKING
RUNWAY OBJECT FREE
AREA, (TYP.)
EXISTING CANTILEVER
GATE WITH CARD
READER ACCESS AND
GATE OPERATOR
END CONDITION
UNKNOWN
EXISTING
PEDESTRIAN GATE
EDGE OF FULL
STRENGTH
PAVEMENT,
(TYP.)
DUAL MITERED
END SECTION
E INV: 102.60'
W INV: 102.65'
DUAL MITERED
END SECTION
E INV: 102.63'
W INV: 102.68'
DUAL 15"X23" RCP
DRAINAGE PIPE
FDOT TYPE
D CURB
M
AT
C H
LI
N
E, S
EE
S
H
EE
T C
KEY PLANA4
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
3\
.3
.0
- X
A pr on a nd
B ea co n\
.3
.0
- C A
D D
\2
C
1- C
2.
dw g
3/
/2
2:
P
M
UMATILLA MUNICIPAL
AIRPORT, UMATILLA,
FLORIDA
AIRCRAFT PARKING
APRON EXPANSION
XR
EF
S:
x
2_ tb x
2_
E- G ra de x
2_ Ba se m ap x
2_
D em o x2
_A lig nm en ts x
2_
PS
-K ey
Pl an
2335202C001-C002
PROFESSIONAL SEAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. 453566-1-94-01
3-12-0026-017-2023
2023.352.02
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2025
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
1 2 3 4
B
C
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
BENCHMARK
SET 4"X4" CONC. MONUMENT
WITH DISK STAMPED
"BOWMAN LB8030 TRAV"
N: 1670423.57 E: 477506.23
ELEV: 104.829' (NAVD 88)
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT
THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE,
VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF
ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE
PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START
OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF
ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR
TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH
THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR
NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN
COMPONENTS(I.E. AIRFIELD ELECTRICAL, STORM SEWERS, POTABLE WATER LINES,
ETC.) AND ANY DISCREPANCIES, CONFLICTS OR POTENTIAL DEVIATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION. ANY COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES
AS OUTLINED ABOVE IS THE RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY
THE ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH
CORRECTIONS AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL
SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES
AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR
TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND
UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK
PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR
SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY
MONUMENTATION,AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT THE
CONTRACTOR'S EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. MILLINGS WILL BE TRANSPORTED TO A CITY STOCKPILE LOCATION WITHIN 5 MILES OF
THE AIRPORT AT NO ADDITIONAL COST TO THE OWNER OR PROJECT, UNLESS
SPECIFIED AND APPROVED OTHERWISE BY THE OWNER.
7. THE CONTRACTOR SHALL MILL 2' SHORT OF THE PROJECT MILLING LIMITS TO PROTECT
THE ASPHALT EDGES FOR FUTURE TIE-INS. THE REMAINING 2' SHALL BE SAWCUT
IMMEDIATELY PRIOR TO PAVING TO PRESERVE THE INTEGRITY OF THE ADJACENT
ASPHALT EDGE.
8. ALL EXISTING AIRFIELD EDGE LIGHTS, AIRFIELD ELECTRICAL HANDHOLES AND
STRUCTURES, PAVEMENT MARKINGS, DRAINAGE SYSTEMS, FAA UTILITIES, AIRFIELD
NAVIGATIONAL AIDS, AND AIRPORT INFRASTRUCTURE INSTALLATIONS NOT
SPECIFICALLY CALLED OUT FOR DEMOLITION/REMOVAL SHALL BE PROTECTED IN
PLACE UNLESS OTHERWISE DIRECTED BY THE OWNER OR ENGINEER.
9. EXISTING INFRASTRUCTURE TO REMAIN AND BE PROTECTED IN PLACE, SHALL BE
REPLACED WITH NEW ITEMS IF DAMAGED/BROKE/DISPLACED/ADVERSELY AFFECTED
BY THE DEMOLITION OPERATIONS BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER OR THE PROJECT. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
PROTECT THE EXISTING AIRFIELD INFRASTRUCTURE THROUGHOUT THE PROJECT
DURATION.
10. AIRFIELD ELECTRICAL INFRASTRUCTURE IS SHOWN AS REFERENCE, SEE THE
ELECTRICAL EXISTING CONDITION AND DEMOLITION PLANS FOR ADDITIONAL
INFORMATION.
11. CONTRACTOR SHALL STAKE AND IDENTIFY SELECT PORTIONS OF THE TAXIWAY THAT
ARE TO BE MILLED PRIOR TO PAVEMENT REMOVAL.
12. CONTRACTOR SHALL STOCKPILE SALVAGED ITEMS IN A NEAT AND ORDERLY MANNER.
SALVAGED ITEMS SHALL BE PROTECTED FROM WEATHER AND OTHER POTENTIAL
CAUSED OF DAMAGE THROUGHOUT THE COURSE OF THE PROJECT.
13. ALL SUITABLE FILL MATERIAL EXCAVATED FROM THE SITE IS THE PROPERTY OF THE
OWNER, UNLESS OTHERWISE DIRECTED, AND SHALL BE TRANSPORTED TO A CITY
STOCKPILE LOCATED WITHIN 5 MILES OF THE AIRPORT AT NO ADDITIONAL COST TO
THE OWNER OR PROJECT. OWNER RESERVES THE RIGHT TO REJECT SUITABLE FILL
MATERIAL. IF REJECTED, MATERIALS SHALL BE DISPOSED OFF SITE BY THE
CONTRACTOR INCIDENTAL TO ITEM P-152.
OBLITERATE EXISTING PAVEMENT MARKING, INCIDENTAL TO ITEM P-620.
COLD MILLING EXISTING ASPHALT, FULL DEPTH. EXISTING LIMEROCK BASE
SHALL BE MILLED AS NEEDED TO MATCH PROPOSED BOTTOM OF ASPHALT
GRADE. SEE GRADING PLAN FOR ADDITIONAL INFORMATION. WHEN PROPOSED
ASPHALT GRADES ARE IN EXCESS OF 1.5" ABOVE EXISTING GRADE, VARIABLE
DEPTH MILLING AND OVERLAY MAY BE UTILIZED.
CLEARING AND GRUBBING, ITEM P-151.
EXISTING CHAIN-LINK FENCE SHALL BE REMOVED
AND DISPOSED OF OFF SITE, ITEM P-162.
PAVEMENT EDGE SHALL BE SAW-CUT
PRIOR TO REMOVAL, ITEM P-101.
PAVEMENT EDGE SHALL BE
SAW-CUT PRIOR TO
REMOVAL, ITEM P-101.
EXISTING DRAINAGE INFRASTRUCTURE TO
BE PROTECTED IN PLACE
EXISTING MINOR CONTOURX.XX'
EXISTING MAJOR CONTOURX.XX'
ELECTRICAL
BACKBOARD TO BE
PROTECTED IN PLACE
SEE THE ELECTRICAL
DEMOLITION PLAN
FOR SITE LIGHTING
DEMOLITION
DJN
.0096
.0097 .0098.0099.0010
0.0
1.0
0102.00
103.00
.0095 .0096 .0097 .00
.00
.0010 0.0
1.0
2.0
3.0
4.0
104.00104.00
105.00
105.00
104.00
105.00105.00
103.00
102.00
101.00
100.00
99.00
98.00
97.00
96.00
.00 93
.00
.00 91 .00 90 .00 89 .00
.00 87 .00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.0081
.00
.0083 .0084 .0085
.0086 .0087
.0088 .0089 .0090
.0091 .0092 .0093 .00
96.00
95.00
94.00
.00
.00
.0082 .0083 .0084 .0085 .00
.00
.00
.00
.00
.00
.00
.00
.00
.00
103.50
102.50
101.50
0.5
.50 98
.50
.50
.50
.50
.50
.50
.50
.50
.50 89 .50
.50
.50
.50
.50
.50 83
.50
.50
.50
.50
.50
102.50
101.50
100.50
99.50
98.50
97.50
96.50
95.50 94.50 93.50
92.50 91.50
.50
89.50
.50
.50
.50
.50
.50
.50
.50
.50
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
TOFA TOFA TOFA TOFA
TOFA
27+00 28+00 29+00
+0
GRUBBING LIMIT
N: 1671258.24
E: 447265.30
GRUBBING LIMIT
N: 1671248.40
E: 447559.35
PAVEMENT DEMOLITION LIMIT
N: 1670679.85 E: 447587.07
PAVEMENT DEMOLITION LIMIT
N: 1670680.65 E: 447574.11
FENCE
DEMOLITION LIMIT
N: 1670836.31 E: 447534.13
OH/T
OH/T
0.0000
CB
LS
C O
C O
CB
N O
R
TH
GRAPHIC SCALE (FT)
603015
N O
R
TH
EXISTING CONDITIONS & CIVIL DEMOLITION PLANB1
SHEET LEGENDA1 SHEET NOTESA2 KEY PLANA4
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .