26B-126 SW 38TH AVE/SW 3RD s/SW 40TH AVE resurface
Closed State & local contract opportunity Posted
- Solicitation number
- 26-126
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 745 Road And Highway Building Materials, Asphaltic
- 755 Road And Highway Asphalt And Concrete Handling And Processing Equipment
- 760 Road And Highway Equipment: Earth Handling, Grading, Moving, Packing, Etc.
- 911 Construction And Utilities, Higher Education
- 91114 C.i.p., Construction Contingency
- 91117 C.i.p., Construction, Roads
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91275 Quality Control Testing Services For Construction
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91327 Construction, Highway And Road
Show all 22
- 91339 Construction, Pipe Culvert
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91355 Construction, Tunnel
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 91395 Paving/Resurfacing, Highway And Road
- 91396 Paving/Resurfacing, Street (Major And Residential)
- 914 Construction Services, Trades, New Construction
- 91430 Concrete
- 91484 Trade Services, Construction (Not Otherwise Classified)
Opportunity details come from marionfl.bonfirehub.com. Updated .
About this opportunity
Marion County, Florida is requesting bids on the SW 38th Avenue/SW 3rd Street/SW 40th Avenue Resurfacing Project (26B-126) extending from SW 38th Court to SR 40 (W Highway 40), with bids due October 8, 2026. This is an ITB for public works construction under $200,000 (at minimum) requiring payment and performance bonds, bid security of five percent of total base bid amount, and a bid bond or Cashier's Check.
The project scope includes milling and resurfacing existing roadway, installation and restriping of pavement markings, and sodding of roadway shoulders. All work must comply with Florida Department of Transportation Standard Specifications for Road and Bridge Construction FY 2024-2025. Work must be performed Monday through Friday during regular hours with a minimum of 8 hours per day and 40 hours per week; weekend and holiday work requires prior written County consent. Any lane closures or activities near SR 40 and SR 200 must be coordinated with FDOT, which may impose additional time-of-day restrictions. The contractor retains all milling materials.
The contract term is 60 calendar days total from Notice to Proceed, excluding County-observed holidays and weekends. Work must commence within 15 calendar days of receiving the Notice to Proceed. Liquidated damages are assessed under FDOT Section 8-10.2 for failure to achieve Final Completion within the contract period. Retainage is 5 percent of completed work and stored materials. Standard payment terms are NET 45 days, or NET 3 days if paying by Visa credit card.
Bidders must submit a Vendor Information Form, Conflict of Interest Statement per Florida Statute 112.313, Drug Free Workplace Certificate, Disclosure of Subcontractors and Suppliers, and Similar Work Detail Form with a minimum of three references. Bids must remain firm for 90 calendar days. Award will be made to the lowest responsive and responsible bidder. All bids are submitted through Marion County's Bonfire e-procurement portal. Questions are submitted electronically through Bonfire prior to the deadline. Addendum 1 clarifies work hour restrictions, FDOT coordination, utility adjustments, and milling material retention; acknowledgment of receipt is mandatory for bid responsiveness.
Opportunity text
The SW 38th Avenue/SW 3rd Street/SW 40th Avenue Resurfacing Project extends from SW 38th Court to SR 40 (W Highway 40). The project generally consists of milling and resurfacing the existing roadway, along with resurfacing existing pavement as required. Additional improvements include installation and restriping of pavement markings and sodding of roadway shoulders.