12-A. SW 38TH AVE Special Provision.pdf
PDF 143 KB Posted
- Solicitation number
- 26-126
- Issued by
- Marion County, Florida
About this file
This is a Special Provisions document for a resurfacing project in Florida, involving the County as the contracting agency. The project covers the SW 38th Avenue/SW 3rd Street/SW 40th Avenue corridor extending from SW 38th Court to SR 40 (W Highway 40) and includes milling and resurfacing existing roadway, resurfacing pavement as required, installation and restriping of pavement markings, and sodding of roadway shoulders. The contract period is 60 calendar days total, including approximately 20 days from substantial completion to project closeout, with County-observed holidays excluded from work authorization unless approved 48 hours in advance. The successful bidder must commence work within 15 calendar days of receiving the Notice to Proceed, with all required documentation submitted to the County prior to issuance of that notice. The contractor must submit a detailed schedule at the Pre-Construction Conference outlining tentative performance dates within the allocated contract timeframe.
Liquidated damages are assessed for failure to achieve Final Completion within the contract period, with daily rates ranging from $1,318 for contracts under $300,000 to $11,171 plus 0.00005 of amounts exceeding $40 million. The contractor bears all costs for increases in liquid asphalt and is responsible for coordinating with FDOT regarding lane closures and traffic control on W Highway 40 and SR 200. Additional provisions require the contractor to replace damaged traffic detection loops, protect utility appurtenances, maintain existing stormwater drainage patterns, prevent ponding at side road aprons, continue mowing operations throughout the contract period, and repair or replace any damaged infrastructure at no additional cost to the County. Any sod quantities exceeding the listed amount are considered incidental to earthwork costs.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCE SPECIAL PROVISIONS
1. SCOPE OF WORK: CONTRACTOR is to complete a lowest bid technically acceptable resurfacing project for the SW 38th Ave/SW 3rd St/SW 40th Ave Resurface, from SW 38th CT to SR 40 (W HWY 40). Generally, the work includes:
1.1 Milling and resurfacing the existing roadway
1.2 Resurfacing existing pavement
1.3 Installing/restriping pavement markings
1.4 Sodding shoulders
2. Contract Time, Schedule and Liquidated Damages: The total contract time for this project is 60 calendar days (including approximately 20 days from substantial completion to project closeout), including COUNTY observed holidays. No work is permitted during COUNTY holidays unless it is approved by the COUNTY, forty-eight (48) hours in advance. Failure to achieve Final Completion within the allotted contract time will cause the charge of liquidated damages against the CONTRACTOR at the daily rate established in this provision. At the Pre-Construction Conference, CONTRACTOR shall submit a schedule for performing the work. The schedule shall be within the contract time allotted for this project and shall include tentative dates of performance. The Notice to Proceed will not be issued until all required documentation is received by the COUNTY. The successful bidder shall start work on this project within 15 calendar days after a Notice to Proceed.
FY2026-27 FDOT Specifications Book
8-10.2 Amount of Liquidated Damages: Applicable liquidated damages are the amounts established in the following schedule:
Amount of Liquidated Damages: Applicable liquidated damages are the amounts established in the following schedule:
Original Contract Amount Daily Charge Per Calendar Day
$299,999 and under ....................................................$1,318
$300,000 but less than $2,000,000............................. $1,609
$2,000,000 but less than $5,000,000...........................$2,529
$5,000,000 but less than $10,000,000.........................$3,498
$10,000,000 but less than $20,000,000.......................$4,752
$20,000,000 but less than $40,000,000.......................$6,703
$40,000,000 and over .............. $11,171 plus 0.00005 of any amount over $40 million (Round to nearest whole dollar)
3. Asphalt Adjustment: No allowance or compensation shall be provided for increases in the cost of liquid asphalt.
4. Due to the project’s proximity to W HWY 40 and SR 200, the Contractor shall coordinate with FDOT for any proposed lane closures, traffic control operations, or activities that may result in traffic delays on W HWY 40 and/or SR 200.
5. The Contractor shall replace any existing traffic detection loops at approximately Station 35+50 that are damaged during the milling operation. Replacement shall be in accordance with FDOT Standard Plans 660-001.
6. The Contractor shall protect all existing manhole covers, valve boxes, and other utility appurtenances in place during asphalt milling operations. Any damage caused by the Contractor shall be repaired or replaced at no additional cost to the County.
7. Any additional sod required above the total quantity listed for the “Roadside Sod” pay item will be considered incidental to the “Earthwork” pay item.
8. CONTRACTOR shall continue to mow the contract area until the completion of the contract.
9. CONTRACTOR shall ensure that the existing stormwater drainage patterns are maintained.
10. CONTRACTOR to ensure that ponding does not occur at side road aprons. Adjust asphalt thickness and/or grade shoulders to ensure that water drains off the roadway.
END OF SPECIAL PROVISIONS