This is a Standard General Conditions of the Construction Contract document issued by Marion County Office of the County Engineer, based on the modified EJCDC C-700 standard. The document serves as the contractual framework for the SW 38th Avenue/SW 3rd Street/SW 40th Avenue Resurfacing Project in Florida, which extends from SW 38th Court to SR 40 (W Highway 40). The project scope includes milling and resurfacing of the existing roadway, installation and restriping of pavement markings, and sodding of roadway shoulders. The contract establishes the legal requirements and obligations for both Marion County and the selected contractor, including provisions for commencement of work within thirty days of the contract's effective date or upon issuance of a Notice to Proceed. Key preliminary requirements include submission of a Progress Schedule, Schedule of Submittals, and Schedule of Values prior to the preconstruction conference, which must occur before any work begins at the site.
The document establishes comprehensive requirements for performance and payment bonds equal to the contract price, with bonds to be recorded in Marion County's Official Records and certified copies provided to the County Procurement Department within fourteen calendar days of the Letter of Award. Contractor insurance requirements include Worker's Compensation, Commercial General Liability, and builder's risk insurance on a completed value basis covering the full insurable replacement cost of the work. Marion County is responsible for providing the site and obtaining property insurance for existing structures where work will occur. The contract provides for equitable adjustments to contract price and times for delays caused by differing subsurface or physical conditions, underground facilities not properly shown on drawings, or hazardous environmental conditions, subject to specific notice and documentation requirements. Change orders, work change directives, and field orders establish the procedures for contract modifications, with detailed provisions governing claims, disputes, and final payment procedures including a correction period for defective work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARION COUNTY
OFFICE OF THE COUNTY ENGINEER
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
“This document is a MODIFIED version of EJCDC® C-700, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.”
For a tracked changes version of this document, contact Marion County Office of the County Engineer.
07/25 Page 1 of 79
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1—Definitions and Terminology
1.01 Defined Terms
1.02 Terminology
Article 2—Preliminary Matters
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance
2.02 Copies of Documents
2.03 Before Starting Construction…………………………………………………………………………………………………….8
2.04 Preconstruction Conference; Designation of Authorized Representatives
2.05 Acceptance of Schedules
2.06 Electronic Transmittals
Article 3—Contract Documents: Intent, Requirements, Reuse
3.01 Intent
3.02 Standards Specifications, Codes, Laws and Regulations
3.03 Reporting and Resolving Discrepancies
3.04 Requirements of the Contract Documents
3.05 Reuse of Documents
Article 4—Commencement and Progress of the Work
4.01 Commencement of Contract Times; Notice to Proceed
4.02 Starting the Work
4.03 Reference Points
4.04 Progress Schedule
4.05 Delays in Contractor’s Progress
Article 5—Site; Subsurface and Physical Conditions; Hazardous Environmental Conditions
5.01 Availability of Lands
5.02 Use of Site and Other Areas
5.03 Subsurface and Physical Conditions
5.04 Differing Subsurface or Physical Conditions
5.05 Underground Facilities
07/25 Page 2 of 79
5.06 Hazardous Environmental Conditions at Site
Article 6—Bonds and Insurance
6.01 Performance, Payment, and Other Bonds
6.02 Insurance—General Provisions
6.03 Contractor’s Insurance
6.04 Builder’s Risk and Other Property Insurance
6.05 Property Losses; Subrogation
6.06 Receipt and Application of Property Insurance Proceeds
Article 7—Contractor’s Responsibilities
7.01 Contractor’s Means and Methods of Construction
7.02 Supervision and Superintendence
7.03 Labor; Working Hours
7.04 Services, Materials, and Equipment
7.05 “Or Equal”
7.06 Substitutes
7.07 Concerning Subcontractors and Suppliers
7.08 Patent Fees and Royalties
7.09 Permits
7.10 Taxes
7.11 Laws and Regulations
7.12 Record Documents
7.13 Safety and Protection
7.14 Hazard Communication Programs
7.15 Emergencies
7.16 Submittals
7.17 Contractor’s General Warranty and Guarantee
7.18 Indemnification
7.19 Delegation of Professional Design Services
Article 8—Other Work at the Site
8.01 Other Work
8.02 Coordination
8.03 Legal Relationships
Article 9—County’s Responsibilities
07/25 Page 3 of 79
9.01 Communications to Contractor
9.02 Replacement of Engineer
9.03 Furnish Data
9.04 Pay When Due
9.05 Lands and Easements; Reports, Tests, and Drawings
9.06 Insurance
9.07 Change Orders
9.08 Inspections, Tests, and Approvals
9.09 Limitations on County’s Responsibilities
9.10 Undisclosed Hazardous Environmental Condition
9.11 Evidence of Financial Arrangements
9.12 Safety Programs
Article 10—Engineer’s Status During Construction
10.01 County’s Representative
10.02 Visits to Site
10.03 Resident Project Representative
10.04 Engineer’s Authority
10.05 Determinations for Unit Price Work
10.06 Decisions on Requirements of Contract Documents and Acceptability of Work
10.07 Limitations on Engineer’s Authority and Responsibilities
10.08 Compliance with Safety Program
Article 11—Changes to the Contract
11.01 Amending and Supplementing the Contract
11.02 Change Orders
11.03 Work Change Directives
11.04 Field Orders
11.05 County-Authorized Changes in the Work
11.06 Unauthorized Changes in the Work
11.07 Change of Contract Price
11.08 Change of Contract Times
11.09 Change Proposals
11.10 Notification to Surety
Article 12—Claims
07/25 Page 4 of 79
12.01 Claims
Article 13—Cost of the Work; Allowances; Unit Price Work
13.01 Cost of the Work
13.02 Allowances
13.03 Unit Price Work
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work
14.01 Access to Work
14.02 Tests, Inspections, and Approvals
14.03 Defective Work
14.04 Acceptance of Defective Work
14.05 Uncovering Work
14.06 County May Stop the Work
14.07 County May Correct Defective Work
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period
15.01 Progress Payments
15.02 Contractor’s Warranty of Title
15.03 Substantial Completion
15.04 Partial Use or Occupancy
15.05 Final Inspection
15.06 Final Payment
15.07 Waiver of Claims
15.08 Correction Period
Article 16—Suspension of Work and Termination
16.01 Termination by the Contractor
16.02 Termination by the County for Cause …………………………………………………………………………………….70
16.03 Termination by the County for Convenience…………………………………………………………………………..70
Article 17—Final Resolution of Disputes
17.01 Methods and Procedures
Article 18—Miscellaneous
18.01 Giving Notice
18.02 Computation of Times
18.03 Cumulative Remedies
18.04 Limitation of Damages
07/25 Page 5 of 79
18.05 No Waiver
18.06 Survival of Obligations
18.07 Controlling Law
18.08 Assignment of Contract
18.09 Successors and Assigns
18.10 Headings
07/25 Page 6 of 79
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
ARTICLE 1—DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Bidding Requirements or Contract Documents, a term printed with initial capital letters, including the term’s singular and plural forms, will have the meaning indicated in the definitions below. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents.
2. Agreement—The written instrument, executed by County and Contractor, that sets forth the Contract Price and Contract Times, identifies the parties and the Engineer, and designates the specific items that are Contract Documents.
3. Application for Payment—The document prepared by Contractor, in a form acceptable to County, to request progress or final payments, and which is to be accompanied by such supporting documentation as is required by the Contract Documents.
4. Bid—The offer of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
5. Bidder—An individual or entity that submits a Bid to County.
6. Bidding Documents—The Bidding Requirements, the proposed Contract Documents, and all Addenda.
7. Bidding Requirements—The advertisement or invitation to bid, instructions to Bidders, Bid bond or other Bid security, if any, the Bid form, and the Bid with any attachments.
8. Certified Corner Records (CCR) — A legal document prepared pursuant to section 177.507, Florida Statutes and filed with the County by a licensed land surveyor to document every section, quarter section or other public land survey corner established by the original cadastral surveys.
9. Change Order—A document which is signed by Contractor and County and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, or other revision to the Contract, issued on or after the Effective Date of the Contract.
10. Change Proposal—A written request by Contractor, duly submitted in compliance with the procedural requirements set forth herein, seeking an adjustment in Contract Price or Contract Times; contesting an initial decision by Engineer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents;
challenging a set-off against payments due; or seeking other relief with respect to the terms of the Contract.
07/25 Page 7 of 79
11. Claim
a. A demand or assertion by County directly to Contractor, duly submitted in compliance with the procedural requirements set forth herein, seeking an adjustment of Contract Price or Contract Times; contesting an initial decision by Engineer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; contesting Engineer’s decision regarding a Change Proposal;
seeking resolution of a contractual issue that Engineer has declined to address; or seeking other relief with respect to the terms of the Contract.
b. A demand or assertion by Contractor directly to County, duly submitted in compliance with the procedural requirements set forth herein, contesting Engineer’s decision regarding a Change Proposal, or seeking resolution of a contractual issue that Engineer has declined to address.
c. A demand or assertion by County or Contractor, duly submitted in compliance with the procedural requirements set forth herein, made pursuant to Paragraph 12.01.A.4, concerning disputes arising after Engineer has issued a recommendation of final payment.
d. A demand for money or services by a third party is not a Claim.
12. Constituent of Concern—Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), lead-based paint (as defined by the HUD/EPA standard), hazardous waste, and any substance, product, waste, or other material of any nature whatsoever that is or becomes listed, regulated, or addressed pursuant to Laws and Regulations regulating, relating to, or imposing liability or standards of conduct concerning, any hazardous, toxic, or dangerous waste, substance, or material.
13. Contract—The entire and integrated written contract between County and Contractor concerning the Work.
14. Contract Documents—Those items so designated in the Agreement, and which together comprise the Contract.
15. Contract Price—The money that County has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents.
16. Contract Times—The number of days or the dates by which Contractor shall: (a) achieve Milestones, if any; (b) achieve Substantial Completion; and (c) complete the Work.
17. Contractor—The individual or entity with which County has contracted for performance of the Work.
18. Cost of the Work—See Paragraph 13.01 for definition.
19. County —Marion County, a political subdivision of the State of Florida for which Contractor has contracted regarding the Work, and which has agreed to pay Contractor for the performance of the Work, pursuant to the terms of the Contract.
20. Drawings—The part of the Contract that graphically shows the scope, extent, and character of the Work to be performed by Contractor.
21. DWG—Drawing file format from AutoCAD or other 3D drawing or CAD-compatible software.
07/25 Page 8 of 79
22. Effective Date of the Contract—The date, indicated in the Agreement, on which the Contract becomes effective.
23. Electronic Document—Any Project-related correspondence, attachments to correspondence, data, documents, drawings, information, or graphics, including but not limited to Shop Drawings and other Submittals, that are in an electronic or digital format.
24. Electronic Means—Electronic mail (email), upload/download from a secure Project website, or other communications methods that allow: (a) the transmission or communication of Electronic Documents; (b) the documentation of transmissions, including sending and receipt; (c) printing of the transmitted Electronic Document by the recipient; (d) the storage and archiving of the Electronic Document by sender and recipient; and (e) the use by recipient of the Electronic Document for purposes permitted by this Contract. Electronic Means does not include the use of text messaging, or of Facebook, Twitter, Instagram, or similar social media services for transmission of Electronic Documents.
25. Engineer—An individual or entity licensed to practice engineering in the State of Florida and is named as such in the Agreement.
26. Field Order—A written order issued by Engineer which requires minor changes in the Work but does not change the Contract Price or the Contract Times.
27. General Land Office—An independent agency of the United States government responsible for public domain lands in the United States.
28. Hazardous Environmental Condition—The presence at the Site of Constituents of Concern in such quantities or circumstances that may present a danger to persons or property exposed thereto.
a. The presence at the Site of materials that are necessary for the execution of the Work, or that are to be incorporated into the Work, and that are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract, is not a Hazardous Environmental Condition.
b. The presence of Constituents of Concern that are to be removed or remediated as part of the Work is not a Hazardous Environmental Condition.
c. The presence of Constituents of Concern as part of the routine, anticipated, and obvious working conditions at the Site, is not a Hazardous Environmental Condition.
29. Laws and Regulations; Laws or Regulations—Any and all applicable laws, statutes, rules, regulations, ordinances, codes, and binding decrees, resolutions, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction.
30. Letter of Award—The written notification by County to a Bidder of County’s acceptance of the Bid.
31. Liens—Charges, security interests, or encumbrances upon Contract-related funds, real property, or personal property.
32. Milestone—A principal event in the performance of the Work that the Contract requires Contractor to achieve by an intermediate completion date, or by a time prior to Substantial Completion of all the Work.
07/25 Page 9 of 79
33. Notice of Acceptability— Written notification from the Engineer to the County and Contractor indicating that the Work performed by Contractor meets the requirements of the Contract Documents and is acceptable.
34. Notice to Proceed—A written notice by County to Contractor fixing the date on which the Contract Times will commence to run and on which Contractor shall start to perform the Work.
35. Or-Equal— Any material or equipment that will fully perform the duties specified, that such material or equipment is of equivalent substance and function.
36. Owner—Individual or entity with legal title to a parcel of land.
37. PDF—Portable document format file from Adobe or other compatible software.
38. Progress Schedule—A schedule, prepared and maintained by Contractor, describing the sequence and duration of the activities comprising Contractor’s plan to accomplish the Work within the Contract Times.
39. Project—The total undertaking to be accomplished for County by engineers, contractors, and others, including planning, study, design, construction, testing, commissioning, and start-up, and of which the Work to be performed under the Contract Documents is a part.
40. Record Survey—A requirement of the Contract that graphically depicts the scope, extent, and character of the Work performed by the Contractor, inclusive of depictions of as-built conditions.
41. Report—The written part of the Contract that shows the scope, extent, and character of the Work to be performed by Contractor; as well as other investigations, considerations, conclusions, and recommendations pertaining to the conditions of the Work.
42. Resident Project Representative—The authorized representative of Engineer assigned to assist Engineer at the Site. As used herein, the term Resident Project Representative (RPR) includes any assistants or field staff of Resident Project Representative.
43. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and that establish the standards by which such portion of the Work will be judged.
44. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements for Engineer’s review of the submittals.
45. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor’s Applications for Payment.
46. Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents.
47. Site—Lands or areas indicated in the Contract Documents as being furnished by County upon which the Work is to be performed, including rights-of-way and easements, and such other lands or areas furnished by County which are designated for the use of Contractor.
07/25 Page 10 of 79
48. Specifications—The part of the Contract that consists of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work.
49. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work.
50. Submittal—A written or graphic document, prepared by or for Contractor, which the Contract Documents require Contractor to submit to Engineer, or that is indicated as a Submittal in the Schedule of Submittals accepted by Engineer. Submittals may include Shop Drawings and Samples; schedules; product data; County-delegated designs;
sustainable design information; information on special procedures; testing plans; results of tests and evaluations, source quality-control testing and inspections, and field or Site quality-control testing and inspections; warranties and certifications; Suppliers’ instructions and reports; records of delivery of spare parts and tools; operations and maintenance data; Project photographic documentation; record documents; and other such documents required by the Contract Documents. Submittals, whether or not approved or accepted by Engineer, are not Contract Documents. Change Proposals, Change Orders, Claims, notices, Applications for Payment, and requests for interpretation or clarification are not Submittals.
51. Substantial Completion—The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of Engineer, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended.
The terms “substantially complete” and “substantially completed” as applied to all or part of the Work refer to Substantial Completion of such Work.
52. Successful Bidder—The Bidder to which the County makes an award of contract.
53. Supplementary Conditions—The part of the Contract that amends or supplements these General Conditions.
54. Supplier—A manufacturer, fabricator, supplier, distributor, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or a Subcontractor.
55. Surveyor—An individual or entity licensed to practice land surveying in the State of Florida.
56. Technical Data
a. Those items expressly identified as Technical Data in the Supplementary Conditions, with respect to either (1) existing subsurface conditions at or adjacent to the Site, or existing physical conditions at or adjacent to the Site including existing surface or subsurface structures (except Underground Facilities) or (2) Hazardous Environmental Conditions at the Site.
b. If no such express identifications of Technical Data have been made with respect to conditions at the Site, then Technical Data is defined, with respect to conditions at the Site under Paragraphs 5.03, 5.04, and 5.06, as the data contained in boring logs, recorded measurements of subsurface water levels, assessments of the condition of subsurface facilities, laboratory test results, and other factual, objective information
07/25 Page 11 of 79 regarding conditions at the Site that are set forth in any geotechnical, environmental, or other Site or facilities conditions report prepared for the Project and made available to Contractor.
c. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data, and instead Underground Facilities are shown or indicated on the Drawings.
57. Termination Claim—A demand or assertion by Contractor duly submitted directly to County in compliance with the procedural requirements set forth herein, made pursuant to Paragraph 16.03.D, specifying amounts due to the Contractor for Contract Termination by the County for its convenience.
58. Underground Facilities—All active or not-in-service underground lines, pipelines, conduits, ducts, encasements, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or systems at the Site, including but not limited to those facilities or systems that produce, transmit, distribute, or convey telephone or other communications, cable television, fiber optic transmissions, power, electricity, light, heat, gases, oil, crude oil products, liquid petroleum products, water, steam, waste, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. An abandoned facility or system is not an Underground Facility.
59. Unit Price Work—Work to be paid for on the basis of unit prices.
60. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction; furnishing, installing, and incorporating all materials and equipment into such construction; and may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents.
61. Work Change Directive—A written directive to Contractor issued on or after the Effective Date of the Contract, signed by County and recommended by Engineer, ordering an addition, deletion, or revision in the Work.
1.02 Terminology
A. The words and terms discussed in Paragraphs 1.02.B, C, D, and E are not defined terms that require initial capital letters, but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Intent of Certain Terms or Adjectives: The Contract Documents include the terms “as allowed,” “as approved,” “as ordered,” “as directed” or terms of like effect or import to authorize an exercise of professional judgment by Engineer. In addition, the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect or import are used to describe an action or determination of Engineer as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective is not intended to and shall not be effective to assign to Engineer any duty or authority to supervise or direct the performance of the Work, or any duty or authority to
07/25 Page 12 of 79 undertake responsibility contrary to the provisions of Article 10 or any other provision of the Contract Documents.
C. Day: The word “day” means a calendar day of 24 hours measured from midnight to the next midnight.
D. Defective: The word “defective,” when modifying the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it:
1. does not conform to the Contract Documents;
2. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or
3. has been damaged prior to Engineer’s recommendation of final payment (unless responsibility for the protection thereof has been assumed by County at Substantial Completion in accordance with Paragraph 15.03 or Paragraph 15.04).
E. Furnish, Install, Perform, Provide
1. The word “furnish,” when used in connection with services, materials, or equipment, means to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment, means to put into use or place in final position said services, materials, or equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services, materials, or equipment, means to furnish and install said services, materials, or equipment complete and ready for intended use.
4. If the Contract Documents establish an obligation of Contractor with respect to specific services, materials, or equipment, but do not expressly use any of the four words “furnish,” “install,” “perform,” or “provide,” then Contractor shall furnish and install said services, materials, or equipment complete and ready for intended use.
F. Contract Price or Contract Times: References to a change in “Contract Price or Contract Times” or “Contract Times or Contract Price” or similar, indicate that such change applies to
(1) Contract Price, (2) Contract Times, or (3) both Contract Price and Contract Times, as warranted, even if the term “or both” is not expressed.
G. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning.
ARTICLE 2—PRELIMINARY MATTERS
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance
A. Performance and Payment Bonds: When Contractor delivers the signed counterparts of the Agreement to County, Contractor shall also deliver to County the performance bond and payment bond (if the Contract requires Contractor to furnish such bonds).
1. Contractor shall record all required bonds, at the Contractor’s expense, in the Official Records of Marion County, Florida.
07/25 Page 13 of 79
2. Contractor shall provide certified copies of said recorded bonds along with the executed Agreement to County Procurement Department within fourteen (14) calendar days of the Letter of Award.
B. Evidence of Contractor’s Insurance: When Contractor delivers the signed counterparts of the Agreement to County, Contractor shall also deliver to County, with copies to each additional insured (as identified in the Contract), the certificates, endorsements, and other evidence of insurance required to be provided by Contractor in accordance with Article 6, except to the extent the Supplementary Conditions expressly establish other dates for delivery of specific insurance policies.
2.02 Copies of Documents
County shall maintain and safeguard at least one original printed record version of the Contract, including Drawings and Specifications signed and sealed by Engineer and other design professionals.
2.03 Before Starting Construction
Preliminary Schedules: On or before the preconstruction meeting, (or, as otherwise required by the Contract Documents), Contractor shall submit to Engineer for timely review:
A. A preliminary Progress Schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract;
B. A preliminary Schedule of Submittals; and
C. A preliminary Schedule of Values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work.
2.04 Preconstruction Conference; Designation of Authorized Representatives
A. Before any Work at the Site is started, a conference attended by County, Contractor, Engineer, and others as appropriate, will be held to establish a working understanding among the parties as to the Work, and to discuss the schedules referred to in Paragraph 2.03.A, procedures for handling Shop Drawings, Samples, and other Submittals, processing Applications for Payment, electronic or digital transmittals, and maintaining required records.
B. At this conference, County and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party.
2.05 Acceptance of Schedules
Prior to commencing the Work, the Contractor shall receive approval from Engineer for all submitted schedules. Work shall not commence until acceptable schedules have been submitted and agreed upon by Engineer and other reviewing parties.
07/25 Page 14 of 79
A. The Progress Schedule will be acceptable to Engineer if it provides an orderly progression of the Work to completion within the Contract Times. Such acceptance will not impose on Engineer the responsibility for the Progress Schedule, for sequencing, scheduling, or progress of the Work, nor interfere with or relieve Contractor from Contractor’s full responsibility therefor.
B. Contractor’s Schedule of Submittals will be acceptable to Engineer if it provides a workable arrangement for reviewing and processing the required submittals.
C. If a schedule is not acceptable, Contractor will have an additional ten (10) days to revise and resubmit the schedule.
2.06 Electronic Transmittals
A. Except as otherwise stated elsewhere in the Contract, County, Engineer, and Contractor may send, and shall accept, Electronic Documents transmitted by Electronic Means.
B. If the Contract does not establish protocols for Electronic Means, then County, Engineer, and Contractor shall jointly develop such protocols.
C. Subject to any governing protocols for Electronic Means, when transmitting Electronic Documents by Electronic Means, the transmitting party makes no representations as to long-term compatibility, usability, or readability of the Electronic Documents resulting from the recipient’s use of software application packages, operating systems, or computer hardware differing from those used in the drafting or transmittal of the Electronic Documents.
ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE
3.01 Intent
A. The Contract Documents are complementary; what is required by one Contract Document is as binding as if required by all.
B. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents.
C. Unless otherwise stated in the Contract Documents, if there is a discrepancy between the electronic versions of the Contract Documents (including any printed copies derived from such electronic versions) and the printed record version, the printed record version will govern.
D. The Contract supersedes prior negotiations, representations, and agreements, whether written or oral.
E. Engineer will issue clarifications and interpretations of the Contract Documents as provided herein.
F. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation will be deemed stricken, and all remaining provisions will continue to be valid and binding upon County and Contractor, which agree that the Contract Documents will be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
07/25 Page 15 of 79
G. Nothing in the Contract Documents creates:
1. Any contractual relationship between County or Engineer and any Subcontractor, Supplier, or other individual or entity performing or furnishing any of the Work, for the benefit of such Subcontractor, Supplier, or other individual or entity; or
2. Any obligation on the part of County or Engineer to pay or to see to the payment of any money due any such Subcontractor, Supplier, or other individual or entity, except as may otherwise be required by Laws and Regulations.
3.02 Standards Specifications, Codes, Laws and Regulations
A. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, means the standard specification, manual, reference standard, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Contract if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.
B. No provision of any such standard specification, manual, reference standard, or code, and no instruction of a Supplier, will be effective to change the duties or responsibilities of County, Contractor, or Engineer from those set forth in the part of the Contract Documents prepared by, or for, Engineer. No such provision or instruction shall be effective to assign to County or Engineer any duty or authority to supervise or direct the performance of the Work, or any duty or authority to undertake responsibility inconsistent with the provisions of the part of the Contract Documents prepared by or for Engineer.
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies
1. Contractor’s Verification of Figures and Field Measurements: Before undertaking each part of the Work, Contractor shall carefully study the Contract Documents, and check and verify pertinent figures and dimensions therein, particularly with respect to applicable field measurements. Contractor shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy that Contractor discovers, or has actual knowledge of, and shall not proceed with any Work affected thereby until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation by Engineer, or by an amendment or supplement to the Contract issued pursuant to Paragraph 11.01.
2. Contractor’s Review of Contract Documents: If, before or during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation, (b) actual field conditions, (c) any standard specification, manual, reference standard, or code, or (d) any instruction of any Supplier, then Contractor shall promptly report it to Engineer in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph 7.15) until the conflict, error, ambiguity, or discrepancy is resolved, by a clarification or interpretation by Engineer, or by an amendment or supplement to the Contract issued pursuant to Paragraph 11.01.
3. Contractor shall not be liable to County or Engineer for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof.
07/25 Page 16 of 79
B. Resolving Discrepancies
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the part of the Contract Documents prepared by or for Engineer take precedence in resolving any conflict, error, ambiguity, or discrepancy between such provisions of the Contract Documents and the provisions of any standard specification, manual, reference standard, or code, or the instruction of any Supplier (whether specifically incorporated by reference as a Contract Document); or
2. The provisions of any Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation).
3.04 Requirements of the Contract Documents
A. During the performance of the Work and until final payment, Contractor and County shall submit to the Engineer in writing all matters in question concerning the requirements of the Contract Documents (sometimes referred to as requests for information or interpretation— RFIs), or relating to the acceptability of the Work under the Contract Documents, as soon as possible after such matters arise. Engineer will be the initial interpreter of the requirements of the Contract Documents, and judge of the acceptability of the Work.
B. Engineer will, with reasonable promptness, render a written clarification, interpretation, or decision on the issue submitted, or initiate an amendment or supplement to the Contract Documents. Engineer’s written clarification, interpretation, or decision will be final and binding on Contractor, unless it appeals by submitting a Change Proposal, and on County, unless it appeals by filing a Claim.
C. If a submitted matter in question concerns terms and conditions of the Contract Documents that do not involve (1) the performance or acceptability of the Work under the Contract Documents, (2) the design (as set forth in the Drawings, Specifications, or otherwise), or (3) other engineering or technical matters, then Engineer will promptly notify County and Contractor in writing that Engineer is unable to provide a decision or interpretation. If County and Contractor are unable to agree on resolution of such a matter in question, either party may pursue resolution as provided in Article 12.
3.05 Reuse of Documents
A. Contractor and its Subcontractors and Suppliers shall not:
1. Have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer or its consultants, including electronic media versions, or reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of County and Engineer and specific written verification or adaptation by Engineer; or
2. Have or acquire any title or ownership rights in any other Contract Documents, reuse any such Contract Documents for any purpose without County’s express written consent, or violate any copyrights pertaining to such Contract Documents.
B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein precludes Contractor from retaining copies of the Contract Documents for record purposes.
07/25 Page 17 of 79
ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK
4.01 Commencement of Contract Times; Notice to Proceed
Contract Times will commence to run on the thirtieth (30th) day after the Effective Date of the Contract or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within thirty (30) days after the Effective Date of the Contract.
4.02 Starting the Work
Contractor shall start to perform the Work on the date when the Contract Times commence to run. No Work may be done at the Site prior to such date.
4.03 Reference Points
A. County shall provide engineering surveys to establish reference points for construction which in the County’s judgment are necessary to enable Contractor to proceed with the Work.
Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of the County. Contractor shall report to the County whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by a licensed Surveyor.
B. Contractor shall file Certified Corner Records (CCR) with the Florida Department of Environmental Protection, Division of State Lands, Bureau of Survey and Mapping Section.
Should Section Corners, ¼ Section Corners and any other General Land Office recognized Corners be lost or destroyed per Paragraph 4.03(A), corners shall be reset and CCRs prepared under the direction or supervision of a licensed Surveyor and pursuant to § 177.507, Fla. Stat.
Contractors must have the capability to work from plans in DWG file format. County does not provide hard copy plans for the purpose of survey stakeout.
C. Contractor shall prepare the Record Survey under the direction and supervision of a licensed Surveyor. Survey shall be in accordance with the adopted “Standards of Practice” for land surveying pursuant to Fla. Admin. Code 5J-17.051 and 17.053, and § 472.027, Fla. Stat.
4.04 Progress Schedule
A. Contractor shall adhere to the Progress Schedule established in accordance with Paragraph 2.05 as it may be adjusted from time to time as provided below.
1. Contractor shall submit to Engineer for acceptance (to the extent indicated in Paragraph 2.05) proposed adjustments in the Progress Schedule that will not result in changing the Contract Times.
2. Proposed adjustments in the Progress Schedule that will change the Contract Times must be submitted in accordance with the requirements of Article 11.
B. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or disagreements with County. No Work will be delayed or postponed pending resolution of any disputes or disagreements, or during any appeal process, except as permitted by Article 16, or as County and Contractor may otherwise agree in writing.
07/25 Page 18 of 79
4.05 Delays in Contractor’s Progress
A. If County, Engineer, or anyone for whom County is responsible, delays, disrupts, or interferes with the performance or progress of the Work, then Contractor shall be entitled to an equitable adjustment in Contract Price or Contract Times.
B. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of Contractor. Delay, disruption, and interference attributable to and within the control of a Subcontractor or Supplier shall be deemed to be within the control of Contractor.
C. If Contractor’s performance or progress is delayed, disrupted, or interfered with by unanticipated causes not the fault of and beyond the control of County, Contractor, and those for which they are responsible, then Contractor shall be entitled to an equitable adjustment in Contract Times. Such an adjustment will be Contractor’s sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. Causes of delay, disruption, or interference that may give rise to an adjustment in Contract Times under this paragraph include but are not limited to the following:
1. Severe and unavoidable natural catastrophes such as fires, floods, epidemics, and earthquakes;
2. Abnormal weather conditions;
3. Acts or failures to act of third-party utility owners or other third-party entities (other than those third-party utility owners or other third-party entities performing other work at or adjacent to the Site as arranged by or under contract with County, as contemplated in Article 8); and
4. Acts of war or terrorism.
D. Contractor’s entitlement to an adjustment of Contract Times or Contract Price is limited as follows:
1. Contractor’s entitlement to an adjustment of the Contract Times is conditioned on the delay, disruption, or interference adversely affecting an activity on the critical path to completion of the Work, as of the time of the delay, disruption, or interference.
2. Contractor shall not be entitled to an adjustment in Contract Price for any delay, disruption, or interference if such delay is concurrent with a delay, disruption, or interference caused by or within the control of Contractor. Such a concurrent delay by Contractor shall not preclude an adjustment of Contract Times to which Contractor is otherwise entitled.
3. Adjustments of Contract Times or Contract Price are subject to the provisions of Article 11.
E. Each Contractor request or Change Proposal seeking an increase in Contract Times or Contract Price must be supplemented by supporting data that sets forth in detail the following:
1. The circumstances that form the basis for the requested adjustment;
2. The date upon which each cause of delay, disruption, or interference began to affect the progress of the Work;
07/25 Page 19 of 79
3. The date upon which each cause of delay, disruption, or interference ceased to affect the progress of the Work;
4. The number of days’ increase in Contract Times claimed as a consequence of each such cause of delay, disruption, or interference; and
5. The impact on Contract Price, in accordance with the provisions of Paragraph 11.07.
F. Contractor shall also furnish such additional supporting documentation as County or Engineer may require including, where appropriate, a revised progress schedule indicating all the activities affected by the delay, disruption, or interference, and an explanation of the effect of the delay, disruption, or interference on the critical path to completion of the Work.
G. Delays, disruption, and interference to the performance or progress of the Work resulting from the existence of a differing subsurface or physical condition, an Underground Facility that was not shown or indicated by the Contract Documents, or not shown or indicated with reasonable accuracy, and those resulting from Hazardous Environmental Conditions, are governed by Article 5, together with the provisions of Paragraphs 4.05.D and 4.05.E.
H. Paragraph 8.03 addresses delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site.
ARTICLE 5—SITE; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS
5.01 Availability of Lands
A. County shall furnish the Site. County shall notify Contractor in writing of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work.
B. Upon reasonable written request, County shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which permanent improvements are to be made and County’s interest therein as necessary for giving notice of or filing a mechanic’s or construction lien against such lands in accordance with applicable Laws and Regulations.
C. If Contractor deems it necessary to utilize areas outside of the roadway right-of-way for construction operations, the Contractor shall give proper notification and obtain written permission to do so from the Owner of each parcel to be utilized for construction operations.
Documentation of such permission shall be provided to the County in advance of utilization.
Upon completion of the Work, Contractor shall obtain a written statement from such Owner stating that the parcel has been restored to a satisfactory condition and that any other written obligations from Contractor have been fulfilled.
5.02 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas
1. Contractor shall confine construction equipment, temporary construction facilities, the storage of materials and equipment, and the operations of workers to the Site, adjacent areas that Contractor has arranged to use through construction easements or otherwise, and other adjacent areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and such other adjacent areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for (a) damage to the
07/25 Page 20 of 79
Site; (b) damage to any such other adjacent areas used for Contractor’s operations; (c) damage to any other adjacent land or areas, or to improvements, structures, utilities, or similar facilities located at such adjacent lands or areas; and (d) for injuries and losses sustained by the owners or occupants of any such land or areas; provided that such damage or injuries result from the performance of the Work or from other actions or conduct of the Contractor or those for which Contractor is responsible.
2. If a damage or injury claim is made by the owner or occupant of any such land or area because of the performance of the Work, or because of other actions or conduct of the Contractor or those for which Contractor is responsible, Contractor shall (a) take immediate corrective or remedial action as required by Paragraph 7.13, or otherwise; (b) promptly attempt to settle the claim as to all parties through negotiations with such owner or occupant, or otherwise resolve the claim by arbitration or other dispute resolution proceeding, or in a court of competent jurisdiction; and (c) to the fullest extent permitted by Laws and Regulations, indemnify and hold harmless County and Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them, from and against any such claim, and against all costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against County, Engineer, or any other party indemnified hereunder to the extent caused directly or indirectly, in…
This is the start of the file's text. The full file is on GovTribe.