This solicitation seeks proposals to complete Phase 2 of an HVAC system upgrade project at the Cheyenne VA Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is procuring HVAC installation and repair services to replace aging infrastructure and correct deficiencies in the surgical HVAC system. Proposals are due by May 23, 2023 and the award will be a firm-fixed-price contract for work valued between $2-5 million. The contractor must complete all work within 300 calendar days of the notice to proceed.

This opportunity is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. The predominant NAICS code is 238220 for HVAC contractors and the primary PSC code covers construction of general building and industrial facilities. Work is to be performed at the Cheyenne VA Medical Center located at 2360 E. Pershing Blvd. in Cheyenne, Wyoming. This solicitation seeks to continue HVAC upgrades started under a previous contract to service four operating rooms and support areas.

Notice text

9 versions

Update #9 · Latest ·

AN AMENDMENT TO SOLICITATION 36C25923B0007 POSTED ON MAY 19, 2023. The purpose of this amendment is as follows: Post responses to additional RFIs and supporting documents. All questions and offers will be emailed to Ilze Karklins-Powers at Ilze.Karklins-Powers@va.gov. All other items and conditions remain the same.

Update #8 ·

AN AMENDMENT TO SOLICITATION 36C25923B0007 POSTED ON MAY 19, 2023.

The purpose of this amendment is as follows:

Post responses to additional RFIs and supporting documents.

All questions and offers will be emailed to Ilze Karklins-Powers at Ilze.Karklins-Powers@va.gov.

All other items and conditions remain the same.

Update #7 ·

This amendment is created to extend the proposal due date to May 23, 2023 at 1:00 PM MT. Proposals are to be submitted to ilze.karklins-powers@va.gov.

Update #6 ·

This amendment is created to extend the proposal due date to May 10, 2023 at 1:00 PM MT. Please make sure to submit your proposals to ilze.karklins-powers@va.gov

Update #5 ·

What is the existing brand of the lighting controls in the ORs

Response: The existing overall lighting controls in the OR s are just wall switches. The light booms are existing Steris controls. New lighting will be dimming controls as detailed in the construction documents and specifications.

General note A on E1-0 states that outages have to be completed in less than 30 minutes. It s unlikely we can transfer feeds, especially in the larger panels, to temporary power in less than 30 minutes without doing at least some of the work energized. Is it the intent of the VA that we work energized? Could we have 2 hours and do the work deenergized?

Response: This work will be done deenergized to comply with VA safety standards. A 2-hour outage is acceptable if the contractor follows a prioritized list that will be provided by the VA for which feeds are most critical to get transferred first. Breaker #2 Lab Cool RM 1-171 will need to be transferred first and has a maximum downtime of 30 minutes.

DPEHB3 shows 9 existing loads that need to be given temporary power while we install the new gear. Only one of the feeds has a location. Could we have the locations of the additional 8 loads.

Response:

1-CP-1 + 1-CP-2 (Chilled Water pumps, Chiller Room, Basement)

Lab Cool RM 1-171 (Walk-in Cooler, Lab, First Floor)

1-AC-6 & 1-AC-7 (Air compressors, Chiller Room, Basement)

Spare May be a spare or may be feeding air compressor in Chiller Room

1-VP-1 & 1-VP-2 (Vacuum pumps, Chiller Room, Basement)

1-AC Dental (Likely feeding air compressor, Chiller Room, Basement)

Med Comp 1-AC-2 + 1-AC-3 OFF NOT IN USE

TX EI EL1 (Transformer either located in MRI Addition or Chiller Room)

No Name (Unsure of what this is feeding)

MCCEHP-1 Penthouse (Emergency power panel, Penthouse)

There aren t any fire alarm drawings, please confirm that there won t be any duct detectors or other fire alarm initiation or notification devices needed.Â

Response:

Correct, there are existing notification devices in the ORs and ductwork but there is no scope of work for these devices.

Specification Number: SECTION 23 09 23

There seems to be a conflict on the plans. Note 11 on M2-2B and Note 15 on M2-2A require the control contractor: PROVIDE & FIELD INSTALL HEPA FILTER LOADING INDICATOR THAT IS TO REPORT BACK TO THE BAS. Note 2 on the same plan pages requires: LABEL EACH HEPA LAMINAR FLOW DIFFUSER ON FACEPLATE, TYP. ASSOCIATE FACEPLATE NUMBER WITH FILTER IN Johnson Controls METASYS FOR EASE OF MAINTENANCE. TYP. ALL LAMINAR FLOW DIFFUSERS. Note 2 indicates 12 +12 BI must be provide to the BAS per M2-2A. Note 2 indicates 9 +9 BI must be provide to the BAS per M2-2B.

M5-1 sequence of operation for OR-1 to 4 indicates: FILTER MONITORING:

FOR ONE FILTER PER LAMINAR FLOW SYSTEM, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 1.5" W.C. (ADJUSTABLE). REFER TO PLANS FOR TOTAL NUMBER OF FILTER DIFFUSERS. EACH ROOM WILL HAVE IT'S

OWN ALARM. Per this sequence only 4 BI are required as opposed to 9 + 9+ 12 +12 BI per other notes on plans.

Johnson Controls may not bid this project because the schedule is not feasible to install 9 + 9+ 12+12 BI . The schedule is feasible only 4 BI required by the sequence of operation shown on M5-1 sequence of operation for OR-1 to 4 .

Please clarify how many BI are required for FILTER MONITORING as decried above?

Response: In each OR, only one HEPA filter loading indicator should be installed & monitored per OR ceiling system. The filter should be labeled per Sheet M5-2 and Metasys should reflect this naming convention.

Each individual HEPA laminar flow diffuser with should be labeled individually per M5-2 and

Metasys should reflect this naming convention. Per note 5 on M6-0 diffusers will have a filter

indicator light that will report back to the BAS.

There will be a total of 34 HEPA filters monitored via the BAS (4 total for OR's & 30 for support

spaces).

Also reference Keynotes 13,14, & 15 on Sheet M2-2A and

Keynotes 9,10,11 on M2-2B for scope related to this topic.

Update #4 ·

RFI

OR HVAC PH 2

Specification Number: SECTION 23 09 23

The specification 23 09 23 indicates BACnet IP protocol controllers are required in one area of the

specification. In another part of the specification 23 09 23 it indicates BACnet MS\TP protocol

controllers might be allowed.

Please clarify that DDC controllers that work on BACnet MS\TP protocol are acceptable for this

project.

Response: DDC controllers on BACnet MS/TP protocol are acceptable to use.

Update #3 ·

RFI #1

OR HVAC PH 2

Update #2 ·

This amendment is created to provide site visit notes and attendance documentation. See attached.

Update #1 ·

Attachments

Files

File Type Posted
36C25923B0007 0007.docx DOCX document
OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf PDF
RFI 5 Q and A_Response.docx DOCX document
36C25923B0007 0006.docx DOCX document
36C25923B0007 0005.docx DOCX document
36C25923B0007 0004.docx DOCX document
36C25923B0007 0003.docx DOCX document
CHY VA - Asbestos Reinspection Report - November 2018.pdf PDF
CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf PDF
CHY VA - Asbestos Inspection Report - 2010.pdf PDF
36C25923B0007 0002.docx DOCX document
OR HVAC PH 2 - ADD 01 DWGS.pdf PDF
OR HVAC PH 2 - ADD 01 SPECS.pdf PDF
VA Form 4288-R.xlsx XLSX spreadsheet
442-21-012 Pre-Bid Sign In.pdf PDF
36C25923B0007 0001.docx DOCX document
Attachment A - OSHA form - pdf.pdf PDF
Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf PDF
36C25923B0007_1.docx DOCX document
Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf PDF
P07 Wage Determination WY20230023 1 27 2023.pdf PDF
SELF-PERFORMED CALCULATIONS.docx DOCX document
S22 LOS 852.219-75.docx DOCX document
Show all 23

Notice history

Notice Type Posted
Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC - 442C39391 Award Award Notice
This notice Latest solicitation Solicitation
Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
648-22-104 Correct HVAC Deficiencies (P&V) Portland, Oregon 97239, United States · NAICS 238220 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
Z2NZ--Turn Key Chiller Equipment (Purchase and Install) Pineville, Louisiana 71360, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
Y1DA--442-306 | Construct Physical Therapy Addition | Cheyenne, WY Cheyenne VA Medical Center Cheyenne, Wyoming 82001, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Replace Fisher House 1 HVAC System Texas 78229, United States · NAICS 238220 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business
J041--White City B249 SE HVAC Repair Department of Veterans Affairs Va Sorcc White City, Oregon 97503, United States · NAICS 238220 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity