Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf
PDF 18 MB Posted
- Attached to
- Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC
- Solicitation number
- 36C25923B0007
About this file
This document outlines a federal contract opportunity for HVAC services at the Cheyenne VA Medical Center. The solicitation number is 36C25923B0007 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 for HVAC Phase 2 services at the Cheyenne VAMC. The opportunity type is a solicitation and attachments are included. The solicitation seeks bids for heating, ventilation, and air conditioning services for the second phase of work at the Cheyenne VA Medical Center in Cheyenne, Wyoming. Bids are due by the date specified in the solicitation documents. The awarded contractor will be expected to provide HVAC installation, repair, and maintenance services over the term of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25923B0007 0007.docx | DOCX document | |
| OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf | ||
| RFI 5 Q and A_Response.docx | DOCX document | |
| 36C25923B0007 0006.docx | DOCX document | |
| 36C25923B0007 0005.docx | DOCX document | |
| 36C25923B0007 0004.docx | DOCX document | |
| 36C25923B0007 0003.docx | DOCX document | |
| OR HVAC PH 2 - ADD 01 SPECS.pdf | ||
| 36C25923B0007 0002.docx | DOCX document | |
| CHY VA - Asbestos Inspection Report - 2010.pdf | ||
| CHY VA - Asbestos Reinspection Report - November 2018.pdf | ||
| OR HVAC PH 2 - ADD 01 DWGS.pdf | ||
| CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf | ||
| VA Form 4288-R.xlsx | XLSX spreadsheet | |
| 442-21-012 Pre-Bid Sign In.pdf | ||
| 36C25923B0007 0001.docx | DOCX document | |
| Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf | ||
| P07 Wage Determination WY20230023 1 27 2023.pdf | ||
| Attachment A - OSHA form - pdf.pdf | ||
| 36C25923B0007_1.docx | DOCX document | |
| S22 LOS 852.219-75.docx | DOCX document | |
| SELF-PERFORMED CALCULATIONS.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLANNORTH
AREA A
AREA B
7100 East Belleview Ave.
Suite 107 Greenwood Village, CO 80111 Phone: 720.200.5955
DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL
BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE
COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY
GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE
PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE
OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED
ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW.
www.specializedeng.com
2022 © COPYRIGHT
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
01/16/2023
21238.001
SITE PLAN
02-10-2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n
/2
.0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n M
E P
S
E S
.r v t
/1
/2
:4
:3
P
M
CS0-0
COVER SHEET CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADE PH2
CHEYENNE, WY
21238.001
BUFFALO
JJW/RJA CJW/ZTR
Cheyenne VAMC OR HVAC
Systems Upgrade PH2
2360 E Pershing Blvd, Cheyenne, WY 82001
SHEET INDEX - ELECTRICAL
Sheet Number Sheet Name
E0-0 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E1-0 ELECTRICAL DEMOLITION - BASEMENT
E1-2 ELECTRICAL DEMOLITION
EL2-2 FLOOR PLAN - LIGHTING
EL2-3 OR LIGHTING CALCULATIONS
EP2-0 BASEMENT - POWER PLAN
EP2-1 LEVEL 1 - POWER PLAN
EP2-2 FLOOR PLAN - POWER
EP2-3 PENTHOUSE - POWER PLAN
E5-0 ONE-LINE DIAGRAM - DEMOLITION
E5-1 ONE-LINE DIAGRAM
E7-0 ELECTRICAL SCHEDULES
E7-1 PANELBOARD SCHEDULES
Grand total: 13
SHEET INDEX - MECHANICAL
Sheet Number Sheet Name
MEP0-0 MEP PHASING
M0-0 MECHANICAL SYMBOLS AND ABBREVIATIONS
M1-2A MECHANICAL DEMOLITION PHASE 1 AREA A
M1-2B MECHANICAL DEMOLITION PHASES 2 & 3 AREA B
M2-2A FLOOR PLAN - DUCTWORK PHASE 1 AREA A
M2-2B FLOOR PLAN - DUCTWORK PHASES 2 & 3 AREA B
M2-3 PENTHOUSE - MECHANICAL PLAN PHASE 1A
MP1-2A PIPING DEMOLITION PHASE 1 AREA A
MP1-2B PIPING DEMOLITION PHASE 2 AREA B
MP2-2A FLOOR PLAN - PIPING PHASE 1 AREA A
M5-0 MECHANICAL DETAILS & AIRFLOW SCEMATIC
M5-1 MECHANICAL CONTROLS
M5-2 MECHANICAL CONTROLS
M6-0 MECHANICAL SCHEDULES
Grand total: 14
SHEET INDEX - ARCHITECTURAL
Sheet Number Sheet Name
CS0-0 COVER SHEET
A0.1 DEMOLITION PLAN
A0.2 DEMOLITION RCP
A1.2 FLOOR PLAN
A2.2 REFLECTED CEILING PAN
LS-0.2 LIFE SAFETY
Grand total: 6
SHEET INDEX - STRUCTURAL
Sheet Number Sheet Name
S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &
ABBREVIATIONS
S-002 STRUCTURAL QA NOTES AND TABLES
S-401 ENLARGED STRUCTURAL PLANS
S-501 STRUCTURAL DETAILS
Grand total: 4
SHEET INDEX - PLUMBING
Sheet Number Sheet Name
P1-2B PLUMBING DEMOLITION PHASE 2 AREA B
P2-2B FLOOR PLAN - PLUMBING PHASE 2 AREA B
PG1-2 MED GAS DEMOLITION
PG2-2 FLOOR PLAN - MEDICAL GAS
Grand total: 4
SHEET INDEX - FIRE PROTECTION
Sheet Number Sheet Name
F1-2 FIRE PROTECTION DEMOLITION
F2-2 FLOOR PLAN - FIRE PROTECTION
Grand total: 2
SHEET INDEX - EQUIPMENT
Sheet Number Sheet Name
Q0-2 EQUIPMENT REFLECTED CEILING PLAN
Grand total: 1
Revisions: Date:
2-152
2-175A2-1762-1772-1832-1822-174
2-175
2-169
2-170
2-184
2-185
C2-23
2-188
2-181
2-179
2-189
2-186 2-187
C2-14
2-163
2-161
2-162
2-160
2-159 2-158 2-157 2-156
C2-13
2-153B2-153A
C2-13A
2-137
S3F2
S4F2
C2-22
ELEV.#7-2 ELEV.#6-2
2-179A 2-179B
2-179C
2-175B
2-185A
2-161A
MECHANICAL
SHAFT
SURGICAL
CONTROL
SURGICAL
SOILED
UTIL.
SURGICAL
EQPMT.
STOR.
SURGICAL
CLERK
OFFICE
SURGICAL
CHIEF
OFFICE
SURGICAL
PHYS.
OFFICE
SURGICAL
CORRIDOR
SURGICAL
STORAGE
SURGICAL
SHOWER
RM.
SURGICAL
LOUNGE
SURGICAL
ANESTHESIA
WORK RM.
SPD
W.SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
CLERK
OFFICE
SPD
CHIEF
OFFICE
SPD
LOUNGE
SPD
LOCKER
RM.
SPD
STERILIZING
SPD
HAC
OTHER
ELEC. VLT.
SPD
SHOWER
RM.
SPD
EQPMT.
WASH
SPD
G.STOR.
SPD
HAC
SPD
SOILED
DECO.
SURGICAL
CORRIDOR
OTHER
COR.
SPD
CORRIDOR
OTHER
STAIRS
OTHER
STAIRS
SURGICAL
PHYS.
OFFICE
SURGICAL
PHYS.
OFFICE
ELEC.
VAULT
ELEVATOR ELEVATOR
SURGICAL
SHOWER
RM.
2-162
2-134
2-134A
2-134B
2-134C
2-134D
2-134E
2-137
C2-15
2-156
SURGICAL
CORRIDOR
SURGICAL
CORRIDOR
SURGICAL
STORAGE
2 3 4 5 6 7 8
B
C
D
E
F
G
OR 2
B2-B6
HAC STOR
B2-98
OR 1
B2-94
SUB
STERILE
B2-B6A
OR 3
B2-128
ANESTHESIA
B2-127
OR 4
B2-125
SUB
STERILE
B2-126
CORRIDOR
B2-01C
STOR
B2-122
ANESTHESIA
EQUIP
B2-123
STOR
B2-121
ELEC
B2-120
CUT OPENING FOR NEW
HVAC RETURN. REFRAME
OPENING FOR DIFFUSER
CUT OPENING FOR NEW
HVAC RETURN. REFRAME
OPENING FOR DIFFUSER
REMOVE SECTION OF
WALL FOR HVAC RETURN
& DIFFUSER
REMOVE SECTION OF
WALL FOR HVAC RETURN
& DIFFUSER
SALVAGE GLOVE BOX & CORNER
GUARD. REINSTALL ON NEW WALL.
SALVAGE GLOVE BOX & CORNER
GUARD. REINSTALL ON NEW WALL.
CUT OPENING FOR NEW
HVAC RETURN. REFRAME
OPENING FOR DIFFUSER
1. DRAWINGS SHOWING EXISTING CONSTRUCTION & UTILITIES ARE BASED ON CASUAL
FIELD OBSERVATION & EXISTING RECORD DOCUMENTS ONLY. THEY ARE NOT
INTENDED TO REPRESENT THE TOTAL SCOPE OF WORK. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION NECESSARY TO ALLOW FOR
COMPLETION OF WORK AS DESCRIBED IN THE ENTIRE SET OF CONSTRUCTION
DOCUMENTS.
2. IF HAZARDOUS MATERIALS ARE DISCOVERED DURING DEMOLITION, STOP WORK IN
THE AFFECTED AREA & NOTIFY ARCHITECT & OWNER IMMEDIATELY.
3. PROTECT EXISTING STRUCTURES, UTILITIES & OTHER BUILDING ELEMENTS THAT
ARE NOT TO BE REMOVED.
4. MODIFICATIONS OR DAMAGE TO THE EXISTING FIRE PROTECTION & FIRE RESISTIVE
WALL OR FLOOR SYSTEMS SHALL BE RESTORED TO MAINTAIN THE EXISTING RATING.
5. PRIOR TO START OF DEMOLITION, OWNER IS TO REMOVE ANY FIXTURES,
FURNITURE, EQUIPMENT OR OTHER SALVAGED ITEMS THAT ARE IN THE
CONSTRUCTION AREA.
6. ITEMS TO BE DEMOLISHED/REMOVED/SALVAGED, U.N.O:
1. FOR WALLS, REMOVE ENTIRE WALL ASSEMBLY FROM SLAB TO STRUCTURE
ABOVE. INCLUDING ALL ANCHORS, FASTENERS, ADHESIVES & OTHER
MISCELLANEOUS ITEMS ASSOCIATED WITH THE WALL.
2. FOR CEILINGS, REMOVE FINISHED CEILING & ALL SUPPORTING ELEMENTS,
INCLUDING SOFFITS, BULKHEADS, & COVES.
7. THE DESIGN TEAM HAS COORDINATED CONSTRUCTION SCOPE ACROSS ALL
DISAPLINES. HOWEVER, EXISTING CONDITIONS, MEANS & METHODS MAY REQUIRE
ADDITIONAL REMOVEAL & REPLACEMENT OF EXISTING FLOOR SLAB, CEILINGS,
WALLS & ANY OTHER EXISTING ELEMENTS AS NECESSARY FOR THE INSTALLATION
OF NEW OR MODIFIED CONSTRUCTION. REFER TO ALL DISCIPLINE DRAWINGS FOR
EXTENTS & STRUCTURAL FOR ACCEPTABLE CORING & CUTTING METHODS.
8. REMOVE EXPOSED PIPING, VALVES, METERS, EQUIPMENT, SUPPORTS, &
FOUNDATIONS OF DISCONNECTED & ABANDONED UTILITIES BACK TO CONTROL
VALVE, BRANCH LINE OR AS DIRECTED BY OWNER. REFER MEP DOCUMENTS FOR
ADDITIONAL INFORMATION.
DEMOLITION GENERAL NOTES
PARTITION TO BE DEMOLISHED
AREA OF DEMOLITION
DEMOLITION PLAN LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21238.001
100% CD SUBMITTAL
02/10/23
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADES PH2
21238.001
BUFFALO
CHEYENNE, WY2/10/2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n /A
L T
U S
-0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n
R
.r v t
/1
/2
:2
:1
A
M
A0.1
DEMOLITION PLAN
1/8" = 1'-0"
DEMOLITION PLAN LEVEL 21
2-187
2 3 4 5 6 7 8
B
C
D
E
F
G
GWB
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"ACT (E)
9' - 0"
GWB
9' - 0"
GWB
10' - 1"
GWB
9' - 0"
GWB
9' - 0"
E Q
REMOVE ENTIRE
OR CEILING
REMOVE ENTIRE
OR CEILING
REMOVE ENTIRE
OR CEILING
REMOVE ENTIRE
GYP. CEILING
(E) MED GAS PEDESTAL TO REMIAN.
SALVAGE ESCUCHEN, REINSTALL & SEAL
TO NEW CEILING.
SALVAGE OR LIGHTS & BOOMS FOR
REINSTALLATION IN NEW LOCATION.
SEE EQUIPMENT DOCUMENTS FOR
ADDITIONAL INFORMATION.
SALVAGE OR LIGHTS & BOOMS FOR
REINSTALLATION IN NEW LOCATION.
SEE EQUIPMENT DOCUMENTS FOR
ADDITIONAL INFORMATION.
REMOVE OR LIGHT BOOMS &
STRUCTURAL SUPPORT. SEE
EQUIPMENT DOCUMENTS FOR
ADDITIONAL INFORMATION.
REMOVE OR LIGHT BOOMS &
STRUCTURAL SUPPORT. SEE
EQUIPMENT DOCUMENTS FOR
ADDITIONAL INFORMATION.
CORRIDOR
B2-01C
OR 1
B2-94
SUB
STERILE
B2-B6A
SCRUB
ALC
B2-94A
OR 2
B2-B6
HAC STOR
B2-98
SURGICAL
CLEAN
CORE
B2-100
CORRIDOR
B2-07C
CORRIDOR
B2-03C
ANESTHESIA
EQUIP
B2-123
STOR
B2-122STOR
B2-121
ELEC
B2-120
CORRIDOR
B2-02C
OR 4
B2-125 ANESTHESIA
B2-127
SUB
STERILE
B2-126
OR 3
B2-128
SCRUB
ALC
B2-124
SCRUB
ALC
B2-124
SPS EQUIP
STOR
B2-102
SURGICAL
CORRIDOR
C2-17 SURGICAL
CORRIDOR
C2-15
SURGICAL
CORRIDOR
C2-16
SALVAGE CEILING TILE & GRID AS
NEEDED FOR MEP SCOPE. REPLACE
TILE & GRID TO NEW CHASE.
REPLACE ANY DAMAGED TILES.
DEMOLISH CEILING AS NEEDED
FOR NEW WALLS & MEP SCOPE.
SALVAGE CEILING TILE & GRID AS
NEEDED FOR MEP SCOPE. REPLACE
TILE & GRID TO ORIGINAL STATE.
REPLACE ANY DAMAGED TILES.
SALVAGE CEILING TILE & GRID AS
NEEDED FOR MEP SCOPE. REPLACE
ANY DAMAGED TILES.
SALVAGE CEILING TILE & GRID AS
NEEDED FOR MEP SCOPE. REPLACE
TILE & GRID TO ORIGINAL STATE.
REPLACE ANY DAMAGED TILES.
DEMOLISH CEILING AS NEEDED
FOR NEW WALLS & MEP SCOPE.
1. DRAWINGS SHOWING EXISTING CONSTRUCTION & UTILITIES ARE BASED ON CASUAL
FIELD OBSERVATION & EXISTING RECORD DOCUMENTS ONLY. THEY ARE NOT
INTENDED TO REPRESENT THE TOTAL SCOPE OF WORK. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION NECESSARY TO ALLOW FOR
COMPLETION OF WORK AS DESCRIBED IN THE ENTIRE SET OF CONSTRUCTION
DOCUMENTS.
2. IF HAZARDOUS MATERIALS ARE DISCOVERED DURING DEMOLITION, STOP WORK IN
THE AFFECTED AREA & NOTIFY ARCHITECT & OWNER IMMEDIATELY.
3. PROTECT EXISTING STRUCTURES, UTILITIES & OTHER BUILDING ELEMENTS THAT
ARE NOT TO BE REMOVED.
4. MODIFICATIONS OR DAMAGE TO THE EXISTING FIRE PROTECTION & FIRE RESISTIVE
WALL OR FLOOR SYSTEMS SHALL BE RESTORED TO MAINTAIN THE EXISTING RATING.
5. PRIOR TO START OF DEMOLITION, OWNER IS TO REMOVE ANY FIXTURES,
FURNITURE, EQUIPMENT OR OTHER SALVAGED ITEMS THAT ARE IN THE
CONSTRUCTION AREA.
6. ITEMS TO BE DEMOLISHED/REMOVED/SALVAGED, U.N.O:
1. FOR WALLS, REMOVE ENTIRE WALL ASSEMBLY FROM SLAB TO STRUCTURE
ABOVE. INCLUDING ALL ANCHORS, FASTENERS, ADHESIVES & OTHER
MISCELLANEOUS ITEMS ASSOCIATED WITH THE WALL.
2. FOR CEILINGS, REMOVE FINISHED CEILING & ALL SUPPORTING ELEMENTS,
INCLUDING SOFFITS, BULKHEADS, & COVES.
7. THE DESIGN TEAM HAS COORDINATED CONSTRUCTION SCOPE ACROSS ALL
DISAPLINES. HOWEVER, EXISTING CONDITIONS, MEANS & METHODS MAY REQUIRE
ADDITIONAL REMOVEAL & REPLACEMENT OF EXISTING FLOOR SLAB, CEILINGS,
WALLS & ANY OTHER EXISTING ELEMENTS AS NECESSARY FOR THE INSTALLATION
OF NEW OR MODIFIED CONSTRUCTION. REFER TO ALL DISCIPLINE DRAWINGS FOR
EXTENTS & STRUCTURAL FOR ACCEPTABLE CORING & CUTTING METHODS.
8. REMOVE EXPOSED PIPING, VALVES, METERS, EQUIPMENT, SUPPORTS, &
FOUNDATIONS OF DISCONNECTED & ABANDONED UTILITIES BACK TO CONTROL
VALVE, BRANCH LINE OR AS DIRECTED BY OWNER. REFER MEP DOCUMENTS FOR
ADDITIONAL INFORMATION.
DEMOLITION GENERAL NOTES
PARTITION TO BE DEMOLISHED
AREA OF DEMOLITION
DEMOLITION PLAN LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21238.001
100% CD SUBMITTAL
02/10/23
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADES PH2
21238.001
BUFFALO
CHEYENNE, WY2/10/2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n /A
L T
U S
-0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n
R
.r v t
/1
/2
:2
:2
A
M
A0.2
DEMOLITION RCP
1/8" = 1'-0"
DEMO RCP LEVEL 22
2-175
2-169
2-170
2-184
2-185
C2-23
2-188
2-181
2-179
2-189
2-186 2-187
C2-14
2-163
2-161
2-162
2-160
2-159 2-158 2-157 2-156
C2-13
2-153B2-153A
C2-13A
2-137
S3F2
S4F2
C2-22
ELEV.#7-2 ELEV.#6-2
2-179A 2-179B
2-179C
2-175B
2-185A
2-161A
MECHANICAL
SHAFT
SURGICAL
CONTROL
SURGICAL
SOILED
UTIL.
SURGICAL
EQPMT.
STOR.
SURGICAL
CLERK
OFFICE
SURGICAL
CHIEF
OFFICE
SURGICAL
PHYS.
OFFICE
SURGICAL
CORRIDOR
SURGICAL
STORAGE
SURGICAL
SHOWER
RM.
SURGICAL
LOUNGE
SURGICAL
ANESTHESIA
WORK RM.
SPD
W.SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
CLERK
OFFICE
SPD
CHIEF
OFFICE
SPD
LOUNGE
SPD
LOCKER
RM.
SPD
STERILIZING
SPD
HAC
OTHER
ELEC. VLT.
SPD
SHOWER
RM.
SPD
EQPMT.
WASH
SPD
G.STOR.
SPD
HAC
SPD
SOILED
DECO.
SURGICAL
CORRIDOR
OTHER
COR.
SPD
CORRIDOR
OTHER
STAIRS
OTHER
STAIRS
SURGICAL
PHYS.
OFFICE
SURGICAL
PHYS.
OFFICE
ELEC.
VAULT
ELEVATOR ELEVATOR
SURGICAL
SHOWER
RM.
2-162
2-134
2-134A
2-134B
2-134C
2-134D
2-134E
2-137
C2-15
2-156
SURGICAL
CORRIDOR
SURGICAL
CORRIDOR
SURGICAL
STORAGE
2 3 4 5 6 7 8
B
C
D
E
F
G
A1.2
OR 1
B2-94
SUB
STERILE
B2-B6A
SCRUB
ALC
B2-94A
OR 2
B2-B6
HAC STOR
B2-98
SURGICAL
CLEAN
CORE
B2-100
CORRIDOR
B2-07C
ANESTHESIA
EQUIP
B2-123
STOR
B2-122
STOR
B2-121
ELEC
B2-120
OR 4
B2-125
ANESTHESIA
B2-127
SUB
STERILE
B2-126
OR 3
B2-128
SCRUB
ALC
B2-124
SCRUB
ALC
SPS EQUIP
STOR
B2-102
CORRIDOR
B2-01C
1' - 5"
1' - 6"
1' - 6"
1' - 8"
1' - 6"
A1.2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
1' - 6"
PATCH EXISTING WALL
TO MEET CRITERIA OF
WALL TYPE A
A
A
A A A
A A A
A
A
LEGEND
AREA NOT IS SCOPE
PATCH EXISTING WALL TO MEET
CRITERIA OF WALL TYPE A
A
C2
C2
ALIGN
A L
IG
N
2' - 6"
ALIGN
ALIGN
A1.23
S im
Sim
A1.24
S im 5
S im
C2 C2
REPLACE & PATCH ALL
FLOOR SEEMS THIS ROOM
REPLACE & PATCH ALL
FLOOR SEEMS THIS ROOM
REPLACE & PATCH ALL
FLOOR SEEMS THIS ROOM
REPLACE & PATCH ALL
FLOOR SEEMS THIS ROOM
A
FLOOR MOCK UP FOR PATTERN,
BASE & SEEMING THIS AREA.
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PATCH & PAINT ALL EXISTING WALLS
& CEILING THIS CORRIDOR
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PATCH & PAINT
ALL EXISTING
WALLS & CEILING
THIS ROOM
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PATCH & PAINT ALL
EXISTING WALLS &
CEILING THIS ROOM
PT PT
PT
PT
PATCH FLOOR &
PROVIDE WALL BASE
TO MATCH EXISITNG
PT
PT
EXTEND EXISTING 4" HOUSEKEEPING
PAD FOR NEW INVERTER
REF STRUCT. 11/S5.01 & ELEC.
PROVIDE CORNER GUARD
& BUMPER RAIL AT NEW
WALLS. MATCH EXISITNG.
SURGICAL
CORRIDOR
B2-06C
1' - 0"
NEW GRILLE RE. MECH
EXISTING WALL BASE
EXISTING DESK SALVAGE
ADN REPLACE AS NEEDED
FOR GRILLE INSTALATION.
EXISTING BOARD
EXISTING CONTROLS
8"
EXISTING OUTLETS
EXISTING OUTLETS
SALVAGE & REINSTALL
EXISTING CORNERGUARD
EXISTING OUTLETS
EXISTING OUTLETS
SALVAGE & REINSTALL
EXISTING GLOVE BOX
NEW GRILLE, RE. MECH.
9"
NEW GRILLE
RE. MECH
EXIST. OUTLETS
EXIST. VIEWBOX
EXIST. WALL
BASE
EXIST. PANEL
LIGHT BOOM
RE. EQUIP.
NEW GRILLE
RE. MECH
9"
EXISTING MED
GAS PEDESTAL
EXISTING CONTROLS
EXISTING OUTLETS
EXISTING WALL
BASE
KEY PLAN
NORTH
LINE OF STRUCTURAL DECK
EXISTING WALL
LINE OF FLOOR
NON-STRUCTURAL
METAL FRAMING SYSTEM
MATCH EXISTING SIZE
1 LAYER 5/8" GWB
PARTITION
DEFLECTION TRACK
SECTION
A
LINE OF STRUCTURAL DECK
LINE OF CEILING
ACOUSTIC INSULATION
FULL STUD THICKNESS
ACOUSTICAL SEALANT BOTH
SIDES BOTTOM OF
PARTITION
LINE OF FLOOR
NON-STRUCTURAL
METAL FRAMING SYSTEM
SIZE AS NOTED BY TYPE
1 LAYER 5/8" GWB EACH SIDE
TYPE VARIES PER 092116
STUD TO STRUCTURE
OR KICKERS
SECTION
3 5/8" METAL STUDS
SPACING PER 092216
C
FIRE RATING:
ASSEMBLY:
NON-RATED
N/A
C
MINIMUM STC: N/A
STUD SIZE/SPACINGTYPE
6" METAL STUDS
SPACING PER 092216
C1
2 1/2" METAL STUDS
SPACING PER 092216
C2
PARTITION
SEAL AT DECK & AROUND
ALL PENETRATIONS TO
MAKE WALL AIR TIGHT
THIS WALL TYPE IS DESIGED TO
SEAL OFF EACH OR FROM THE
SURROUNDING CEILING PLENUM.
SEAL ALL DUCT, PIPING AND
CONDUIT PENITRATIONS.
1. ALL DIMENSIONS ARE TO FINISH WALL SURFACE UNLESS NOTED OTHERWISE.
2. FIELD VERIFY DIMENSIONS & LAYOUT ENTIRE AREA WITHIN CONFINES OF
EXISTING CONSTRUCTION TO RESOLVE DISCREPANCIES PRIOR TO INSTALLATION
OF ANY WALLS.
3. COORDINATE LOCATION SIZE & SCHEDULE FOR ALL OWNER PROVIDED OR
INSTALLED FURNITURE & EQUIPMENT (F&E) & SIGNAGE WITH OWNER, OWNER’S
VENDOR & INSTALLIONS TEAMS. REFER TO EQUIPMENT PLANS & SUPPORTING
PRODUCT DATA.
FLOOR PLAN NOTES
1. THE CONTRACTOR & ALL SUB-CONTRACTORS ARE RESPONSIBLE TO COMPLY
WITH ALL THE INFORMATION WITHIN THE CONSTRUCTION DOCUMENTS,
INCLUDING BUT NOT LIMITED TO THE DRAWING SHEETS OF ALL DESIGN
DISCIPLINES, SPECIFICATIONS & PROJECT REPORTS.
2. IF THE CONTRACTOR FINDS A DISCREPANCY IN THE NOTES, DRAWINGS,
SPECIFICATIONS OR DISCIPLINES WITHIN THIS SET OF CONSTRUCTION
DOCUMENTS, CONTRACTOR IS REQUIRED TO BRING SAID DISCREPANCY TO THE
DESIGN TEAM'S ATTENTION PRIOR TO MOVING FORWARD WITH ANY AFFECTED
SCOPE. FOR PRICING PURPOSES CONTRACTOR IS TO ASSUME MOST STRINGENT
SCENARIO.
3. THESE CONSTRUCTION DOCUMENTS ATTEMPT TO BE AS DETAILED AS POSSIBLE
BUT CANNOT COVER ALL SCOPE NUANCES. CONTRACTOR IS RESPONSIBLE FOR
PROVIDING COMPLETE WORKING SYSTEMS USING THE CONSTRUCTION
DOCUMENTS AS A DEFINITION OF PROJECT SCOPE OF WORK & DESIGN INTENT.
EXAMPLES BUT NOT LIMITED TO ARE:
A. ALL PARTS & ACCESSORIES NEEDED FOR THE INTENDED PURPOSED SCOPE
OF WORK SHALL BE PROVIDED EVEN IF ALL COMPONENTS ARE NOT
SPECIFICALLY NOTED.
B. MECHANICAL & ELECTRICAL SYSTEMS SHALL BE TURNED OVER IN COMPLETE
WORKING ORDER. IF PARTS, COMPONENTS OR ACCESSORIES ARE NEEDED
TO MAKE THE SPECIFIED SYSTEMS FUNCTION AS INTENDED BY THE
MANUFACTURERS THEY SHOULD ALSO BE PROVIDED.
C. THE OWNER'S EQUIPMENT’S MOUNTING, SIZE & ELECTRICAL OR PLUMBING
REQUIREMENTS.
4. MORE DETAILED DRAWINGS GOVERN OVER LARGER SCALED DRAWINGS WHICH
GOVERN OVER GENERAL INFORMATION & SPECIFICATIONS.
5. INFORMATION ON THE EXISTING EQUIPMENT THAT WAS NOT AVAILABLE DURING
DESIGN AND THESE DOCUMENTS REFLECT THE FIELD OBSERVATIONS AND
INFORMATION THAT THE DESIGN TEAM WAS ABLE TO COLLECT. HOWEVER, THAT
INFORMATION IS INCOMPLETE, AND THE CONTRACTOR IS RESPONSIBLE FOR
FINAL COORDINATION OF THE INSTALLATION OF NEW AND EXISTING EQUIPMENT.
CONTRACTOR IS TO WORK WITH AND COORDINATE WITH OWNER’S VENDORS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING & ENSURE THAT ALL
CONSTRUCTION MEETS OR EXCEEDS APPLICABLE CODES & STANDARD
PRACTICES, INCLUDING ALL FEDERAL, STATE & LOCAL BUILDING REQUIREMENTS.
7. NUMBERING MAY NOT BE SEQUENTIAL & MAY HAVE GAPS IN SEQUENCE. THIS IS
NOT AN INDICATION OF MISSING INFORMATION.
8. MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS ARE GENERAL &
DIAGRAMMATIC IN NATURE THEY ARE NOT INTENDED TO REPRESENT SPECIFIC
LOCATIONS OF BUILDING ELEMENTS. REFERENCE ARCHITECTURAL DRAWINGS
FOR CRITICAL LOCATIONS OF SPECIFIC ELEMENTS. CONTRACTOR IS
RESPONSIBLE FOR FINAL COORDINATION OF ALL DISCIPLINES TO ALLOW FOR
COMPLETION OF WORK AS DESCRIBED IN THE CONSTRUCTION DOCUMENTS.
9. THE CONTRACTOR SHALL MAINTAIN A CLEAN & SAFE WORK ENVIRONMENT
COMPILING & EXCEEDING ALL APPLICABLE GOVERNMENT AGENCIES.
10. CONTRACTOR SHALL COMPLY WITH OWNER'S REQUIREMENTS FOR STORAGE,
DEBRIS REMOVAL, NOISE LEVELS, VENTILATION & LIMITATIONS OF ACCESS TO
SITE. COORDINATE WITH OWNER FOR REQUIREMENTS & ANY NEEDED
CLARIFICATION. NO CHANGE ORDERS WILL BE PERMITTED FOR FAILURE TO BE
AWARE OF OWNER'S REQUIREMENTS.
11. THE CONTRACTOR SHALL FOLLOW ALL THE OWNER’S INFECTION CONTROL RISK
ASSESSMENT (ICRA) GUIDELINES & INTERIM INFECTION CONTROL MEASURES
(IICM). WHICH WILL BE USED TO DETERMINE WHAT PREVENTIVE CONTROL
MEASURES ARE REQUIRED. IF THE OWNER DOES NOT HAVE ICRA GUIDELINES,
THEN THE CONTRACTOR SHALL PROVIDE THEIR INFECTION CONTROL POLICIES &
PROCEDURES FOR REVIEW & APPROVAL BY THE OWNER PRIOR TO STARTING
WORK IN OR ADJACENT TO ANY EXISTING AREA.
12. CONTRACTOR SHALL COORDINATE & NOTIFY IN WRITING ALL UTILITY
SHUTDOWNS WITH THE OWNER PER THEIR POLICIES & PROCEDURES.
13. CONTRACTOR IS RESPONSIBLE FOR CHECKING CONTRACT DOCUMENTS, FIELD
CONDITIONS & DIMENSIONS FOR ACCURACY & CONFIRMING WORK IS BUILDABLE
AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. QUESTIONS
REGARDING THESE OR OTHER COORDINATION QUESTIONS THE CONTRACTOR IS
RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT BEFORE
PROCEEDING WITH WORK OR RELATED WORK IN QUESTION.
14. DRAWINGS ARE NOT TO BE SCALED.
15. ALL MATERIALS & EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY & FREE
FROM DEFECTS.
16. CONTRACTOR SHALL INCLUDE ALL INCIDENTAL MATERIALS EITHER SPECIFIED
OR NOT THAT PROVIDE A COMPLETE WORKING SYSTEM.
17. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS
NECESSARY TO DEMONSTRATE A COMPLETE & SATISFACTORY INSTALLATION
THAT MEETS OR EXCEEDS MANUFACTURE OR OWNER’S REQUIREMENTS.
18. REMOVE DEBRIS FROM PROPERTY & DISPOSE OF REMOVED MATERIAL LEGALLY.
PROVIDE DUMPSTER IF REQUIRED. LEAVE THE SITE IN A NEAT & ORDERLY
CONDITION. PROVIDE OFF SITE TRASH REMOVAL FOR PROJECT RELATED WORK
BY SUBCONTRACTORS, ETC.
19. COORDINATE DEMOLITION & CONSTRUCTION WITH OWNER FOR AREAS OF THE
BUILDING THAT ARE TO REMAIN OCCUPIED & PROVIDE METHODS OF
PROCEDURE FOR ANY DISTURBANCE TO TYPICAL OWNER OPERATIONS.
COORDINATE & PROVIDE TEMPORARY INSTALLATIONS & ENCLOSURES AS
NECESSARY TO SEPARATE/PROTECT THE OCCUPIED AREAS FROM DEMOLITION
& CONSTRUCTION. MAINTAIN REQUIRED EGRESS & FIRE PROTECTION OF
OCCUPIED AREAS. DO NOT OBSTRUCT REQUIRED EGRESS PATHS OR EXITS AT
ANY TIME.
20. AREAS OF THE BUILDING SHALL REMAIN OCCUPIED & CONTINUOUSLY
OPERATIONAL DURING THE DEMOLITION & CONSTRUCTION. PROVIDE, ERECT, &
MAINTAIN TEMPORARY BARRIERS & SECURITY DEVICES TO PREVENT ACCESS TO
AREAS THAT COULD BE HAZARDOUS TO WORKERS OR THE PUBLIC.
21. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY DEFECTS FOUND
IN EXISTING SITE OR BASE BUILDING CONSTRUCTION WHICH INTERFERES WITH
ANY NEW CONSTRUCTION. THIS INCLUDES BUT IS NOT LIMITED TO UNEVEN
SURFACES & FINISHES AT PLASTER OR GYPSUM BOARD. CONTRACTOR SHALL
PATCH & REPAIR SURFACE TO MATCH ADJACENT ADJOINING SURFACES.
22. EXISTING STRUCTURAL SYSTEM SHALL NOT BE REMOVED OR MODIFIED UNLESS
APPROVED IN ADVANCED BY THE ARCHITECT & STRUCTURAL ENGINEER.
MODIFICATIONS OR DISRUPTION TO THE FIRE PROTECTIVE & FIRE RESISTIVE
WALL PARTITIONS OR BUILDING STRUCTURAL SYSTEMS SHALL BE RESTORED TO
MAINTAIN THE REQUIRED RATING.
23. CONTRACTOR TO MAINTAIN FIRE SPRINKLER PROTECT THROUGHOUT
CONSTRUCTION. INCLUDING BUT NOT LIMITED TO UPTURNING ALL SPRINKLER
HEADS WHILE CEILING ARE REMOVED.
GENERAL PROJECT NOTES
1. GYPSUM WALLBOARD TO BE 5/8" TYPE X MOLD RESISTANT.
2. BACKING BOARD FOR NON-WET AREAS TO HAVE A MOLD RESISTANCE SCORE OF 10.
3. NON-STRUCTURAL FRAMING STUD SPACING TO BE 16" ON CENTER WITH MAXIMUM
WALL FRAMING DEFLECTION OF L/120 AT 5 PSF. STUD MINIMUM THICKNESS TO BE 25
GA, EXCEPT AS FOLLOWS:
A. PROVIDE HEAVIER THICKNESS AS REQUIRED TO COMPLY WITH MANUFACTURE
PERFORMANCE CRITERIA & MOUNTING REQUIREMENTS.
B. PROVIDE FRAMING SYSTEMS WITH A MINIMUM OF 20 GA STUDS AT FOLLOWING
CONDITIONS:
C. FRAMING SYSTEMS SUPPORTING TILING TO HAVE A MAXIMUM WALL FRAMING
DEFLECTION OF L/360 AT 5 PSF.
4. FRAMING SYSTEMS TERMINATING AT STRUCTURE PROVIDE A 3”-DEEP LEG TRACK,
MAINTAIN 1” CLEARANCE BETWEEN TOP OF STUDS & TRACK. VERIFY FREE
MOVEMENT OF TOP OF STUD CONNECTIONS; DO NOT LEAVE STUDS UNATTACHED
TO TRACK.
5. SEAL ALL WALL PENETRATIONS IN ALL RATED WALLS WITH APPROVED FIRE STOP OR
ACOUSTIC WALLS WITH APPROVED ACOUSTIC SEALANT.
6. FINISH GYPSUM BOARD IN ACCORDANCE WITH LEVELS DEFINED AS FOLLOWS:
A. LEVEL 5: WALLS & CEILINGS TO RECEIVE SEMI-GLOSS OR GLOSS PAINT FINISH &
OTHER AREAS SPECIFICALLY INDICATED INCLUDING OPERATING ROOMS. SPRAY-
APPLY HIGH BUILD DRYWALL SURFACE.
B. LEVEL 4: WALLS & CEILINGS TO RECEIVE PAINT FINISH OR WALL COVERINGS,
UNLESS OTHERWISE INDICATED.
C. LEVEL 1: FIRE RATED WALL AREAS ABOVE FINISHED CEILINGS, WHETHER OR NOT
ACCESSIBLE IN THE COMPLETED CONSTRUCTION.
7. CONTROL JOINTS SHALL BE INSTALLED IN ALL GYPSUM BOARD CEILINGS SO THAT
LINEAR DIMENSIONS BETWEEN CONTROL JOINTS DO NOT EXCEED 30 FT & TOTAL
AREA BETWEEN CONTROL JOINTS DOES NOT EXCEED 900 SQ FT.
8. CONTRACTOR TO PROVIDE CONTROL JOINT SHOP DRAWING, WITH GYPSUM BOARD
SUBMITTAL, INDICATING WHERE ALL PROPOSED JOINTS TO OCCUR.
WALL PARTITION NOTES
1. ALL INTERIOR FINISHES TO MEET OR EXCEED APPLICABLE CODE REQUIREMENTS,
INCLUDING BUT NOT LIMITED TO FLAME SPREAD & SMOKE DEVELOPMENT.
2. CONTRACTOR TO REVIEW & SUBMIT TO ARCHITECT SAMPLES OF EACH MATERIAL IN
FINISH LEGEND.
3. THE FINISH NAME TAKES PRECEDENT OVER THE FINISH PRODUCT NUMBER WHEN
ORDERING MATERIALS. CONTACT ARCHITECT WITH ANY DISCREPANCIES.
4. ALL ITEMS NOT CALLED OUT SHOULD BE FINISHED TO MATCH THE ADJACENT
SURFACE.
5. INSTALL ALL FLOORING PER MANUFACTURER’S RECOMMENDATIONS & ACCEPTED
INDUSTRY PRACTICES INCLUDING BUT NOT LIMITED TO MOISTURE TESTING, FLOOR
PREPARATION, INSTALLATION METHOD, & ADHESIVES. VERIFY WITH ALL
MANUFACTURERS & SUPPLIERS PRIOR TO INSTALLATION.
6. PROVIDE INTEGRAL COVE BASE TO MATCH ADJACENT SHEET FLOORING WITH
STAINLESS STEEL TOP CAP & MECHANICALLY FASTENED CORNERS.
7. INSTALL ALL WALLCOVERING PER MANUFACTURER'S INSTRUCTIONS. AFTER
HANGING THREE (3) LENGTHS OF THE WALLCOVERING MATERIAL, CHECK FOR ANY
DEFECTS.
8. ALL PAINTED SURFACES TO RECEIVE A MINIMUM OF ONE (1) PRIMER COAT & THEN
TWO (2) FINISH PAINT COATS. TINT PRIMER COAT PER MANUFACTURER'S
SPECIFICATIONS.
9. PAINT ALL NEW WALLS & ADJACENT WALL AS ILLISTRATED ON PLAN.
10. ALL PAINTED SURFACES TO RECEIVE WATER BORNE EPOXY SEMI-GLOSS SHERWIN
WILLIAMS ZURICH WHITE SW-7626.
WALS TO BE PAINTED:
11. PROVIDE INTERGAL SHEET VINYL WALL BASE @ ALL NEW WALLS PATCH EXISITNG
FLOOR & BASE AS NEEDED TO MAINTAIN MONOLITIC FLOOR SYSTEM. PRODUCT TO
MATCH EXISTING MANUFACTURE AND COLOR.
FINISH NOTES
PT
AREA OF INTERGAL SHEET VINYL FLOOR & BASE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21238.001
100% CD SUBMITTAL
02/10/23
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADES PH2
21238.001
BUFFALO
CHEYENNE, WY2/10/2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n /A
L T
U S
-0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n
R
.r v t
/1
/2
:2
:2
A
M
A1.2
FLOOR PLAN
1/8" = 1'-0"
FLOOR PLAN - LEVEL 21
1/4" = 1'-0"
OR 4 - E4 1/4" = 1'-0"
OR 4 - W51/4" = 1'-0"
OR 1 - N2 1/4" = 1'-0"
OR 1 - W3
SURGICAL
CLEAN
CORE
Revisions: Date:
STAMP
2/10/2023
2-175
2-169
2-170
2-184
2-185
C2-23
2-188
2-181
2-179
2-189
2-186 2-187
C2-14
2-163
2-161
2-162
2-160
2-159 2-158 2-157 2-156
C2-13
2-153B2-153A
C2-13A
2-137
S3F2
S4F2
C2-22
ELEV.#7-2 ELEV.#6-2
2-179A 2-179B
2-179C
2-175B
2-185A
2-161A
MECHANICAL
SHAFT
SURGICAL
CONTROL
SURGICAL
SOILED
UTIL.
SURGICAL
EQPMT.
STOR.
SURGICAL
CLERK
OFFICE
SURGICAL
CHIEF
OFFICE
SURGICAL
PHYS.
OFFICE
SURGICAL
CORRIDOR
SURGICAL
STORAGE
SURGICAL
SHOWER
RM.
SURGICAL
LOUNGE
SURGICAL
ANESTHESIA
WORK RM.
SPD
W.SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
WARD
SUPPLIES
SPD
CLERK
OFFICE
SPD
CHIEF
OFFICE
SPD
LOUNGE
SPD
LOCKER
RM.
SPD
STERILIZING
SPD
HAC
OTHER
ELEC. VLT.
SPD
SHOWER
RM.
SPD
EQPMT.
WASH
SPD
G.STOR.
SPD
HAC
SPD
SOILED
DECO.
SURGICAL
CORRIDOR
OTHER
COR.
SPD
CORRIDOR
OTHER
STAIRS
OTHER
STAIRS
SURGICAL
PHYS.
OFFICE
SURGICAL
PHYS.
OFFICE
ELEC.
VAULT
ELEVATOR ELEVATOR
SURGICAL
SHOWER
RM.
2-162
2-134
2-134A
2-134B
2-134C
2-134D
2-134E
2-137
C2-15
2-156
SURGICAL
CORRIDOR
SURGICAL
CORRIDOR
SURGICAL
STORAGE
2 3 4 5 6 7 8
B
C
D
E
F
G
OR 1
B2-94
SUB
STERILE
B2-B6A
SCRUB
ALC
B2-94A
OR 2
B2-B6
HAC STOR
B2-98
SURGICAL
CLEAN
CORE
B2-100
CORRIDOR
B2-07C
ANESTHESIA
EQUIP
B2-123
STOR
B2-122STOR
B2-121
ELEC
B2-120
OR 4
B2-125
ANESTHESIA
B2-127
SUB
STERILE
B2-126
OR 3
B2-128
SCRUB
ALC
B2-124
SCRUB
ALC
SPS EQUIP
STOR
B2-102
CORRIDOR
B2-01C
SURGICAL
CORRIDOR
B2-06C
Room
Room
Room
SURGICAL
HOLDING
2-144
OCCUPANCY: HEALTHCARE - I-2
LIFE SAFETY LEGEND
1-HOUR FIRE WALL
1-HOUR FIRE/SMOKE BARRIER
NOT IN SCOPE
CODE CRITERIA
CODES:
CURRENT VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL
CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (WWW.CFM.VA.GOV/TIL/).
2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN
VA DESIGN DOCUMENTS.
2021 NFPA 101 LIFE SAFETY CODE
2021 NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2021 NATIONAL ELECTRICAL CODE (NEC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
TYPE OF CONSTRUCITON: TYPE 2A
NOTE THAT THE OCCUPANCY, BUILDING AREA, OR OCCUPANCY LOAD IS NOT AFFECTED
BY THE SCOPE OF CONSTRUCTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21238.001
100% CD SUBMITTAL
02/10/23
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADES PH2
21238.001
BUFFALO
CHEYENNE, WY2/10/2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n /A
L T
U S
-0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n
R
.r v t
/1
/2
:2
:2
A
M
LS-0.2
LIFE SAFETY
1/8" = 1'-0"
5-LIFE SAFETY PLAN LEVEL 2 - MASTER1
2-187
2-136
2 3 4 5 6
7 8
B
C
D
E
F
G
GWB
10' - 2"
GWB
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"
ACT (E)
9' - 0"
GWB
9' - 0"ACT (E)
9' - 0"
GWB
9' - 0"
GWB
9' - 0"
GWB
9' - 0"
OR 1
B2-94
SUB
STERILE
B2-B6A
SCRUB
ALC
B2-94A
OR 2
B2-B6
HAC STOR
B2-98
SURGICAL
CLEAN
CORE
B2-100
CORRIDOR
B2-07C
ANESTHESIA
EQUIP
B2-123
STOR
B2-122
STOR
B2-121ELEC
B2-120
OR 4
B2-125
ANESTHESIA
B2-127
SUB
STERILE
B2-126
OR 3
B2-128
SCRUB
ALC
B2-124
SCRUB
ALC
SPS EQUIP
STOR
B2-102
CORRIDOR
B2-01C
E Q
1' - 1" 2' - 2"
/2
12' - 4"
11' - 3" 11' - 3"
12' - 4"
/2
M7480R
A1122.1R
M7490R
A1122R
M7481
M7481
M7481
M7481
U0001
U0001
M7480R A1122.1R
M7490R
A1122R
U0002
U0002
U0002U0002
U0001R U0001R
U0003U0003
U0003
U0003
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21238.001
100% CD SUBMITTAL
02/10/23
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADES PH2
21238.001
BUFFALO
CHEYENNE, WY2/10/2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n /A
L T
U S
-0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n
R
.r v t
/6
/2
:0
:4
P M
Q0.2
EQUIPMENT REFLECTED CEILING
PLAN
1/8" = 1'-0"
RCP LEVEL 2 - EQUIPMENT RCP1
JSN EQUIPMENT SCHEDULE (NEW)
JSN DESCRIPTION LOG CAT QTY
M7481 LIGHT, SURGICAL, CEILING MOUNTED, SINGLE, MEDIUM, LED C 4
U0001 CONTROLLER, SURGICAL LIGHT C 2
U0002 INTEGRATED MODULAR LAMINAR AIR DELIVERY MANIFOLD SYSTEM C 4
U0003 PATIENT LIFT C 4
GENERAL NOTES
1. NEW OR CEILING INTEGRATED MODULAR LAMINAR AIR DELIVERY MANIFOLD SYSTEM, TYPICAL OF ALL 4 OR'S. OR-1 AND OR-2 CEILING SYSTEM LAYOUTS ARE SIMILAR. OR-3 AND OR-4 CEILING SYSTEM LAYOUTS ARE SIMLAR. REFER TO SPECIFICATION FOR MORE DETAIL ON CONFIGURATION. REFERENCE EQUIPMENT
CUT SHEETS WITHIN APPENDIX A IN SPECIFICATIONS BOOK.
2. STERIS (MANUFACTURER OF EXISTING BOOMS TO BE REUSED IN ORS 3 & 4) IS TO DEMONSTRATE AND DOCUMENT THE OPERABILITY OF EXISTING SURGICAL SYSTEM BOOMS AND INTEGRATION SYSTEM TO THE VA AND PROJECT TEAM PRIOR TO DE INSTALLATION AND RE INSTALLATION. CONTRACTOR TO CONSTRUCT AND COORDINATE WITH STERIS CRATE CONSTRUCTION FOR EXISTING SURGICAL LIGHTS, BOOMS, VIDEO INTEGRATION AND ASSOCIATED ITEMS FOR OFFSITE STORAGE.
3. EXISTING BOOMS AND SURGICAL LIGHTS TO BE REUSED SHALL BE FULLY WRAPPED IN PLASTIC SHEET, PROPERLY SUPPORTED IN CRATED CASES THAT ARE FILLED WITH FOAM TO PROTECT IN THE
MOVING PROCESS. CRATED BOOMS SHALL BE STORED OFF SITE IN BONEDED AND INSURED,
PROTECTED, TEMPERATURE AND HUMIDITY CONTROLLED STORAGE FACILITY THAT IS APPROVED BY THE VA AND EQUIPMENT MANUFACTURER FOR THIS STORAGE PURPOSE. ORS 3 & 4: PURCHASE OF NEW STRUCTURAL PLATES, MED GAS BRACKETS AND PIPETTES ARE REQUIRED ALONG WITH ACCESS PANEL
COORDINATION.
4. ALL BOOM PIPING (AND HOSES), ELECTRICAL CONNECTIONS, INTEGRATION CONNECTIONS, LOW VOLTAGE CONNECTIONS, ETC SHALL BE LABELED BOTH IN THE ROOM AND AT THE BOOM FOR EASE OF RE-INSTALLATION. EXISTING CONNECTION PLATES SHALL ALSO BE PROTECTED AND REMAIN WITH RELOCATED BOOMS. ALL CONNECTIONS SHALL BE INSPECTED PRIOR TO BEING STORED TO ENSURE THEY ARE IN GOOD CONDITION AND ARE NOT IN NEED OF REPLACEMENT. CONTRACTOR TO WORK WITH
STERIS ON COORDINATING FIELD INSPECTION OF DISMOUNTED BOOMS FOR ANY DAMAGE AND
REPALCEMENT NEEDED.
5. MOVE PATHWAYS FOR OFFSITE STORED BOOMS SHALL BE COORDINATED WITH THE VA PRIOR TO PROVIDING THE FINAL BID FOR THIER STORAGE. PATHWAY FROM OR TO ELEVATOR AND TO LOADING DOCK SHALL INCLUDE FIBER BOARD FLOOR PROTECTION AND CONTRACTOR SHALL USE ELEVATOR 10, OR OTHER AS DETERMINED BY THE VA, WITH DIMENSIONAL LIMITATIONS OF 4'-0" W X 7'-0" H DOOR
OPENING AND 6'-0" W X 7'-6" D INTERNAL CAR DIMENSIONS. 5,000 LB WEIGHT CAPACITY.
6. CONTRACTOR TO COORDINATE WITH STERIS REPRESENTATIVE ON RE-INSTALLATION AND START UP OF EXISTING RE-INSTALLED BOOMS. ON SITE INPECTION BY STERIS IS REQUIRED WITH BOOM /
INTEGRATION SYSTEM FUNCTIONAL TESTING REPORT.
JSN EQUIPMENT SCHEDULE (EXISTING)
JSN DESCRIPTION LOG CAT QTY
A1122.1R COLUMN, ANESTHESIA ARM, CEILING MOUNTED, MOTORIZED R 2
A1122R COLUMN, EQUIPMENT ARM, CEILING MOUNTED, MOTORIZED R 2
M7480R LIGHT, SURGICAL, CEILING MOUNTED, SINGLE, MEDIUM, LED R 2
M7490R LIGHT, SURGICAL, CEILING MOUNTED, DUAL, MEDIUM, LED R 2
U0001R CONTROLLER, SURGICAL LIGHT R 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/10/23
Calibre Engineering, Inc.
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
B
IM
/C h e y e n n e V
A M
C O
R H
V A
C U p g ra d e
/C h e y e n n e
V A
M C
O R
U p g ra d e
S tr u c tu ra l C e n tr a l.
rv t
/1
/2
:2
:3
A
M
S-001
GENERAL STRUCTURAL NOTES,
DESIGN LOADS & ABBREVIATIONS
OR HVAC SYSTEM UPGRADE PH
CHEYENNE, WY
442-21-012
BUFFALO
ES JB
A --------
@ AT
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AFS ABOVE FINISH SLAB
AGG AGGREGATE
APPR APPROXIMATE
ARCH ARCHITECT
B --------
BFF BELOW FINISH FLOOR
BLDG BUILDING
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
BTWN BETWEEN
C --------
C STEEL CHANNEL
CD CONSTRUCTION DOCUMENTS
CFMF COLD-FORMED METAL FRAMING
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COR CONTRACTING OFFICER’S REPRESENTATIVE
CTR CENTER
CU FT CUBIC FEET
D --------
DAS DEFORMED ANCHOR STUD
DEMO DEMOLITION
DBL DOUBLE
DTL DETAIL
DIA/Ø DIAMETER
DIM DIMENSION
DIR DIRECTION
DL DEAD LOAD
DWG DRAWING
E --------
(E) EXISTING
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EMB EMBED
EOR ENGINEER OF RECORD
ES EACH SIDE
ETC ETCETERA
EW EACH WAY
EQ EQUAL
EXP EXPANSION
EXT EXTERIOR
F --------
FDTN FOUNDATION
FF FINISH FACE
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FRMG FRAMING
FSTNR FASTENER
FT FEET
FTG FOOTING
G --------
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GR BM GRADE BEAM
H --------
HAS HEADED ANCHOR STUD
HDAR HEADED ANCHOR ROD
HORIZ HORIZONTAL
HSS HOLLOW STRUCTURAL SHAPE
I --------
IBC INTERNATIONAL BUILDING CODE
IN INCH
INT INTERIOR
J --------
JST JOIST
JT JOINT
K --------
K THOUSAND (KIP)
KIP THOUSAND POUND
KLF KIPS PER LINEAR FOOT
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
L --------
L STEEL ANGLE
LBS POUND
LF LINEAR FEET (FOOT)
LG LIGHT GAUGE
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLR ROOF LIVE LOAD
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LWT LIGHT WEIGHT
M --------
MAX MAXIMUM
MD METAL DECK
MEMB MEMBRANE
MECH MECHANICAL
MFR MANUFACTURER
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MPH MILES PER HOUR
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTL METAL
N --------
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
NWT NORMAL WEIGHT
O --------
OC ON CENTER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
ORIG ORIGINAL
P --------
PAF POWDER ACTUATED FASTENER
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERIM PERIMETER
PL PLATE
PLUMB PLUMBING
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
Q --------
QA QUALITY ASSURANCE
QTY QUANTITY
R--------
RBM REINFORCED BRICK MASONRY
RC REINFORCED CONCRETE
REF REFERENCE
REINF REINFORCEMENT
REV REVISION(S)
S --------
SC SLIP CRITICAL
SCHED SCHEDULE
SDC SEISMIC DESIGN CATEGORY
SEOR STRUCTURAL ENGINEER OF RECORD
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SNOW LOAD
SOG SLAB ON GRADE
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
STD STANDARD
STL STEEL
T --------
T&B TOP AND BOTTOM
TFF TOP OF FINISH FLOOR
TL TOTAL LOAD
TN TRUE NORTH
TO TOP OF
TOB TOP OF BEAM
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF SLAB, STEEL
TYP TYPICAL
U --------
UON UNLESS OTHERWISE NOTED
V --------
V SHEAR
VA DEPARTMENT OF VETERANS AFFAIRS
VERT VERTICAL
VIF VERIFY IN FIELD
W --------
W STEEL WIDE FLANGE
W/ WITH
W/C WATER CONTENT
W/O WITHOUT
WL WIND LOAD
WT WEIGHT
WWF WELDED WIRE FABRIC
Y --------
YD YARD
CODE AND DESIGN CRITERIA
1. BUILDING CODES:
a. LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN GUIDES, STANDARDS AND
MANUALS
b. INTERNATIONAL BUILDING CODE (IBC) - 2021
c. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), STEEL CONSTRUCTION MANUAL - 15th
EDITION
d. AISC, SEISMIC DESIGN MANUAL - 3rd EDITION
e. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) 7, MINIMUM DESIGN LOADS AND ASSOCIATED
CRITERIA FOR BUILDINGS AND OTHER STRUCTURES - 2016
f. AMERICAN CONCRETE INSTITUTE (ACI) 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE - 2019
2. DESIGN CRITERIA
a. RISK CATEGORY: IV
3. DESIGN LOADS
a. FLOOR
1. LIVE LOAD: 100 PSF
b. ROOF
1. SUPERIMPOSED DEAD LOAD: 22 PSF
2. LIVE LOAD: 30 PSF
4. WIND DESIGN DATA
a. BASIC WIND SPEED: 119 MPH (ULTIMATE) 92 MPH (ALLOWABLE)
b. EXPOSURE: C
c. SURFACE ROUGHNESS: C
d. INTERNAL PRESSURE COEFFICIENT (GCpi): ± 0.18
e. DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING DESIGNED BY THE CONTRACTOR:
1. LISTED PRESSURES ARE INCLUDED FOR REFERENCE ONLY BASED ON A TRIBUTARY AREA OF
10 SF. FINAL CALCULATIONS SHALL BE COMPLETED BY THE CONTRACTOR.
2. EDGE ZONE a = 10’
3. WALL PRESSURES
1. INTERIOR ZONE (4) = -35 PSF, +33 PSF
2. CORNER ZONE (5) = -44 PSF, +33 PSF
4. ROOF PRESSURES
1. POSITIVE ALL ZONES = 16 PSF
2. INTERIOR ZONE 1 = -57 PSF
3. EDGE ZONE 2 = -75 PSF
4. CORNER ZONE 3 = -102 PSF
5. SEISMIC DESIGN DATA
a. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
b. SEISMIC IMPORTANCE FACTOR (Ie): 1.5
c. Ss: 0.158g
d. S1: 0.051g
e. SITE CLASS: D
f. Sds: 0.169g
g. Sd1: 0.082g
h. SEISMIC DESIGN CATEGORY: C
i. SEISMIC FORCE RESISTING SYSTEM: SHEAR WALL-FRAME INTERACTIVE SYSTEM WITH ORDINARY
RC MOMENT FRAMES AND SHEARWALLS
1. RESPONSE MODIFICATION FACTOR (R): 4
2. OVERSTRENGTH FACTOR (Ω): 2.5
3. DEFLECTION AMPLIFICATION FACTOR (Cd): 4
6. SNOW DESIGN DATA
a. GROUND SNOW LOAD:
b. SNOW IMPORTANCE FACTOR (Is): 1.2
c. SNOW EXPOSURE FACTOR (Ce) = 1.0
d. THERMAL FACTOR (Ct) = 1.0
e. SLOPED ROOF FACTOR (Cs) = 1.0
f. FLAT ROOF SNOW LOAD = 25 PSF
g. MIN UNIFORM ROOF SNOW LOAD = 25 PSF
GENERAL NOTES
1. THE PROJECT SPECIFICATIONS ARE A PART OF THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS, ARCHITECTURAL DRAWINGS, AND
EXISTING CONDITIONS/DIMENSIONS. THE CONTRACTOR SHALL NOTIFY THE COR OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH ANY WORK.
3. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE COMPLETED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES AND
MEANS NECESSARY TO PROTECT PERSONS AND STRUCTURES DURING CONSTRUCTION. SUCH
MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING, ETC. OBSERVATION BY THE
ARCHITECT, ENGINEER OR COR DOES NOT INCLUDE REVIEW OF THESE MEASURES.
4. NOTES AND DETAILS ON THE STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES.
TYPICAL DETAILS SHALL BE USED WHENEVER APPLICABLE. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
5. ALL WORK NOT DETAILED OR NOTED SHALL BE CONSTRUCTED IN ACCORDANCE WITH OTHER SIMILAR
WORK SHOWN ON THE DRAWINGS AND TYPICAL DETAILS.
6. DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
7. NO PIPES OR DUCTS SHALL BE PLACED IN OR PENETRATE STRUCTURAL MEMBERS UNLESS
SPECIFICALLY DESIGNED AND DETAILED.
8. STRUCTURAL DRAWINGS TO BE USED IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL,
PLUMBING, ELECTRICAL, AND CIVIL DRAWINGS HEREIN.
9. REFER TO ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
a. SIZE AND LOCATION OF DOOR AND WINDOW OPENINGS, EXCEPT AS NOTED.
b. SIZE AND LOCATION OF INTERIOR AND EXTERIOR NONBEARING PARTITIONS.
c. SIZE AND LOCATION OF CURBS, FLOOR DRAINS, SLOPES, DEPRESSED AREAS, CHANGES IN LEVEL, RAMPS, CHAMFERS, GROOVES, INSERTS, ETC.
d. SIZE AND LOCATION OF FLOOR AND ROOF OPENINGS, IF NOT DIMENSIONED ON THESE DRAWINGS.
e. FLOOR AND ROOF FINISHES.
f. STAIR FRAMING AND DETAILS, EXCEPT AS NOTED.
g. DIMENSIONS NOT SHOWN ON STRUCT DWGS.
10. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:
a. PIPE RUNS, SLEEVES, HANGERS, EQUIPMENT, SLAB OPENINGS, NOT SHOWN OR NOTED ON
STRUCTURAL DRAWINGS
b. ELECTRICAL CONDUIT, BOXES, OUTLETS.
c. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES.
d. SIZE AND LOCATION OF MACHINE AND EQUIPMENT BASES. CONTRACTOR'S ENGINEER SHALL
DESIGN SEISMIC ANCHORAGE FOR MECHANICAL AND ELECTRICAL EQUIPMENT PER SPEC.
11. ASTM REFERENCES ARE FOR LATEST REVISIONS AND ISSUE, UON.
12. CONTRACTOR SHALL INVESTIGATE THE SITE DURING CLEARING AND EXCAVATION FOR UNSUITABLE
CONDITIONS, UNCONSOLIDATED AND UNDOCUMENTED FILLS, BURIED STRUCTURES, UTILITIES, ETC., SHALL IMMEDIATELY NOTIFY THE COR OF ANY SITE CONDITIONS NOT REFLECTED ON THE DRAWINGS OR DIFFERENT FROM MAXIMUM OR MINIMUM DIMENSIONS INDICATED, INCLUDING CONFLICT IN GRADES, ADVERSE SOIL CONDITIONS, GROUND WATER PRESENT, DEEPENED FOOTINGS, UNCOVERED AND
UNEXPECTED UTILITY LINES, ETC.
13. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON STRUCTURAL FRAME SUCH THAT THE LOADING DOES NOT EXCEED THE DESIGN LIVE LOADS. PROVIDE SHORING AND BRACING WHERE DESIGN
STRENGTH HAS NOT BEEN ATTAINED OR STRUCTURE IS NOT COMPLETE.
14. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF UTILITY SERVICES IN AREAS TO BE EXCAVATED
BEFORE BEGINNING EXCAVATION. EXERCISE CAUTION IN EXCAVATING AND TRENCHING.
15. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBILITY FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACT OF
OMISSIONS OF THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS.
16. CONTRACTOR’S CONSTRUCTION AND ERECTION SEQUENCE SHALL CONSIDER THE EFFECTS OF
THERMAL MOVEMENTS OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD.
17. VERIFY ALL OPENING DIMENSIONS THROUGH FLOOR, ROOF, AND WALLS WITH MECHANICAL AND
ELECTRICAL CONTRACTORS.
18. STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE INTERSECTIONS, UNLESS
DIMENSIONED OTHERWISE.
19. NOTIFY ARCHITECT OF ANY CONDITIONS NOT CONSTRUCTED PER THE CONTRACT DOCUMENTS PRIOR
TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT PROPOSED REPAIR TO THE ARCHITECT FOR
ACCEPTANCE.
20. NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS ELIMINATING THE NEED
FOR THE CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS. WHERE THE STRUCTURAL
DRAWINGS APPEAR TO CONFLICT WITH OSHA REQUIREMENTS, THE STRUCTURAL DRAWINGS
REPRESENT FINAL CONDITIONS ONLY.
21. THE CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS AND SITE
OBSERVATION AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH ARE NOT KNOWN OR ARE AT
VARIANCE WITH PROJECT DOCUMENTATION. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL
CONDITIONS NOT PER THE CONTRACT DOCUMENTS.
22. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR TO SUBMITTING
SHOP DRAWINGS.
a. CONTRACTOR SHALL MAKE ALLOWANCE FOR THE RESOLUTION OF SUCH DISCOVERIES IN THE
CONSTRUCTION SCHEDULE.
23. SUBMIT A DIMENSIONED DRAWING OF ALL NEW OPENINGS THROUGH EXISTING STRUCTURE AND
SECURE APPROVAL PRIOR TO CUTTING. NEW OPENINGS MAY BE EITHER SHOWN ON THE CONTRACT
DOCUMENTS OR PROPOSED BY THE CONTRACTOR. DRAWING SHALL SHOW:
a. VERTICAL & HORIZONTAL LOCATION AND SIZE OF NEW OPENING(S)
b. ALL EXISTING OPENINGS IN THE VICINITY OF THE NEW OPENING(S)
c. ALL EXISTING STRUCTURE (BEAMS, COLUMNS, SLABS, WALLS, ETC) IN THE VICINITY OF THE NEW
OPENING(S)
d. ALL REINFORCING BAR SIZES AND POSITIONS (LAYOUT LOCATION AND DEPTH) CONFLICTING WITH
OR IN THE VICINITY OF THE NEW OPENING(S).
SUBMITTAL NOTES
1. SEE THE PROJECT SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. SUBMITTALS SHALL NOT CONTAIN SUBSTITUTION REQUESTS WITHOUT PRIOR AUTHORIZATION.
SUBSTITUTION REQUESTS ARE FOR CONTRACTOR'S CONVENIENCE. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL CHANGES NECESSARY IF THEY CHOOSE TO SUBSTITUTE AND SHALL
COORDINATE ALL DETAILS. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY
REQUESTS BY THE CONTRACTOR FOR A SUBSTITUTION REQUEST OR DUE TO ERRORS OR OMISSIONS IN
CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR.
3. DELEGATED DESIGN SUBMITTALS:
a. THE CONTRACTOR SHALL EMPLOY OR RETAIN A PROFESSIONAL ENGINEER LICENSED IN THE
STATE WHERE THE PROJECT IS LOCATED TO DESIGN AND DETAIL DELEGATED DESIGN ITEMS TO MEET THE PERFORMANCE AND DESIGN CRITERIA ESTABLISHED AS PART OF THE BASE BUILDING
STRUCTURE. DELEGATED DESIGN ITEMS INCLUDE:
1. MEDICAL EQUIPMENT SUPPORT, INCLUDING SLD AIRFRAMES
b. CONNECTION OF DEFERRED SUBMITTAL ITEMS TO PRIMARY STRUCTURE BY DEFERRED
SUBMITTAL SUPPLIER. DEFERRED SUBMITTAL SUPPLIER TO PROVIDE CONNECTIONS AND
FRAMING ARRANGEMENT TO AVOID LOADING WHICH EXCEEDS THE CAPACITY OF THE ELEMENT
BEING ATTACHED TO.
c. ALL DEFERRED SUBMITTALS TO BE ATTACHED TO PRIMARY STRUCTURE WITH A PINNED
CONNECTION. MOMENT CONNECTIONS TO PRIMARY STRUCTURE NOT PERMITTED UNLESS NOTED
ON DRAWINGS OR APPROVED BY ENGINEER IN WRITING PRIOR TO SUBMITTAL OF DRAWINGS OR
CALCULATIONS.
d. LOADING AND LOCATION FOR ATTACHMENT OF DEFERRED SUBMITTAL ITEMS ARE NOTED ON
DRAWINGS AND ARE NOT TO BE RE-LOCATED OR INCREASED WITHOUT WRITTEN APPROVAL.
e. METAL STUD FRAMING AND FRAMING ATTACHMENT IS DESIGNED FOR THE TRIBUTARY WIND AND GRAVITY LOAD OF THE STUD SPACING. CLADDING SUPPLIER TO DESIGN CLADDING TO ATTACH AT
EACH STUD. CLADDING ATTACHMENT SPACING WHICH EXCEEDS THE STUD SPACING IS NOT
ACCEPTABLE WITHOUT APPROVAL FROM THE METAL STUD SUPPLIER/DESIGNER AND THE
PROJECT EOR. IF THE CLADDING SUPPLIER DOES NOT WANT OR CANNOT ATTACH TO EACH STUD
THE LOADS FROM THE CLADDING SUPPLIER MUST BE PROVIDED TO THE METAL STUD FRAMING
SUPPLIER. THE METAL STUD FRAMING SUPPLIER WILL NEED TO INCORPORATE THESE LOADS INTO
THE METAL STUD FRAMING DESIGN. GC TO COORDINATE BETWEEN METAL STUD FRAMING
SUPPLIER AND CLADDING SUPPLIER AS REQUIRED.
f. WALLS, GRADE BEAMS AND THE UNDERSIDE OF CONCRETE ON METAL DECK SHALL BE
CONSIDERED CRACKED FOR THE PURPOSE OF DESIGNING ANCHORS FOR ATTACHMENT OF
DEFERRED SUBMITTAL ITEMS.
g. POWDER ACTUATED FASTENERS (PAF) INTO CONCRETE OR CMU SHALL NOT BE USED TO RESIST
TENSION LOADS.
h. MODULAR CEILING SYSTEM BASIS OF DESIGN: SLD AirFRAME
• CONTRACTOR TO SUBMIT PROPOSED ANCHORAGE PLAN FOR ALTERNATE MODULAR CEILING
SYSTEM MANUFACTURERS FOR REVIEW
POST-INSTALLED ANCHOR NOTES
1. POST-INSTALLED ANCHORS BASIS OF DESIGN:
2. CONTRACTOR SHALL PROVIDED ENGINEERING BACKUP FOR ANY ANCHOR SUBSTITUTION REQUEST OR
COMPENSATE CALIBRE TO PERFORM ENGINEERING VALIDATION THAT SUBSTITUTED ANCHOR IS
ACCEPTABLE.
3. CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER’S REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. SUBMIT DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS HAVE PASSED
THE TRAINING COURSE PRIOR TO THE COMMENCEMENT OF INSTALLING ANCHORS.
4. PROOF TENSION TEST FIRST 3 ADHESIVE ANCHORS AND 1% OF TOTAL ANCHORS PER ASTM E488. TEST
10% TOTAL OF OVERHEAD ADHESIVE ANCHORS.
5. TORQUE TEST 100% OF EXPANSION, SLEEVE, AND SCREW ANCHORS TO 100% OF INSTALLATION
TORQUE SHOWN IN PRODUCT ICC REPORT.
6. INSTALL ANCHORS IN ACCORDANCE WITH CONTRACT DOCUMENTS AND THE CURRENT
MANUFACTURER’S PUBLISHED INSTALLATION INSTRUCTIONS.
7. LOCATE ,THROUGH NON-DESTRUCTIVE MEANS, AND AVOID ALL EXISTING REINFORCING PRIOR TO INSTALLATION OF ANCHORS. IF EXISTING LAYOUT CONFLICTS WITH PROPOSED ANCHORS, CONTACT
EOR FOR REVISED LAYOUT.
8. ANCHORS INSTALLED IN MASONRY SHALL BE INTO FULLY GROUTED CELLS FOR LOCATION OF ANCHOR
AND ONE CELL ABOVE, BELOW, AND ADJACENT TO ANCHOR, UON.
POST-INSTALLED ANCHORS
TYPE USE ANCHOR
ADHESIVE ANCHOR:
CONCRETE: HILTI HIT-RE 500 V3
MASONRY: HILTI HY-270
MECHANICAL ANCHORS:
SCREW ANCHOR: HILTI KWIK HUS-EZ
EXPANSION ANCHOR: HILTI KWIK BOLT TZ2
STRUCTURAL STEEL NOTES
1. STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED, AND ERECTED IN ACCORDANCE WITH THE AISC "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" AND "CODE OF STANDARD PRACTICE
FOR STEEL BUILDINGS AND BRIDGES" (LATEST EDITION AND SUPPLEMENTS).
2. CONNECTING OR SPLICING OF STRUCTURAL STEEL NOT SHOWN ON THE DRAWINGS IS PROHIBITED
WITHOUT PRIOR WRITTEN APPROVAL OF THE SEOR.
3. THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS OF ALL STRUCTURAL STEEL FOR REVIEW BEFORE FABRICATION. SHOP DRAWINGS SHALL SHOW THE ERECTION PROCEDURES AND
DETAILS.
4. SEE SPECIFICATIONS FOR FINISH / PAINTING REQUIREMENTS FOR STRUCTURAL STEEL SURFACES.
VERIFY WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
5. WELDED JOINTS SHALL CONFORM TO THE PRE-QUALIFIED JOINT DETAILS AS INDICATED IN THE
STRUCTURAL WELDING CODE (AWS D1.1) BY THE AMERICAN WELDING SOCIETY.
6. ALL WELDING SHALL BE BY WELDERS HOLDING CURRENT VALID CERTIFICATES AND HAVING CURRENT EXPERIENCE IN TYPE OF WELD CALLED FOR. WELDING RODS TO BE LOW HYDROGEN TYPE, E70.
7. ALL GROOVE WELDS TO BE FULL PENETRATION, UON.
8. ALL FILLET WELDS TO BE 5/16”, CONTINUOUS, UON.
9. WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WELD SIZE SHALL
BE AISC MINIMUM PER AISC SECTION J2.1b AND J2.2b, UNLESS A LARGER SIZE IS NOTED.
10. WELDS SHOWN AS FIELD WELDS MUST BE MADE IN THE FIELD UNLESS A SUBSTITUTION REQUEST IS
MADE. ALL OTHER WELDS MAY BE MADE IN SHOP OR FIELD AT CONTRACTOR’S OPTION.
11. EXCEPT AS SUBSEQUENTLY NOTED, HIGH STRENGTH BOLTS NEED NOT BE TIGHTENED BEYOND THE
SNUG-TIGHT CONDITION, AS DEFINED IN SECTION 8.(c) OF THE SPECIFICATIONS FOR STRUCTURAL
JOINTS USING ASTM A325 OR A490 BOLTS. FOR CONNECTIONS SUBJECT TO DIRECT TENSION,
CONNECTIONS FOR BRACED FRAMES, AND OTHER CONNECTIONS SHOWN OR NOTED ON THE PLANS AS SLIP CRITICAL (SC) OR FULLY TENSIONED, BOLTS SHALL BE TIGHTENED BY ONE OF THE METHODS DESCRIBED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .