SELF-PERFORMED CALCULATIONS.docx
DOCX document 25 KB Posted
- Attached to
- Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC
- Solicitation number
- 36C25923B0007
About this file
This document provides instructions for calculating self-performed work on federal contracts in accordance with limitations on subcontracting requirements. It outlines that offerors must calculate the total proposed price, amount projected to be paid to non-VIP listed SDVOSBs, offeror's percentage of estimated non-VIP work, and offeror's percentage of estimated self-performed work. For A/E services contracts, no more than 50% of the amount paid by the government can be paid to firms that are not VIP-listed VOSBs. For general construction contracts, no more than 85% can be paid to firms that are not VIP-listed SDVOSBs, and for special trade construction contracts no more than 75% can be paid to firms that are not VIP-listed SDVOSBs. The related federal contract opportunity is for HVAC Phase 2 work at the Cheyenne VA Medical Center, solicited by the Department of Veterans Affairs Veterans Health Administration VISN 19.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25923B0007 0007.docx | DOCX document | |
| OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf | ||
| RFI 5 Q and A_Response.docx | DOCX document | |
| 36C25923B0007 0006.docx | DOCX document | |
| 36C25923B0007 0005.docx | DOCX document | |
| 36C25923B0007 0004.docx | DOCX document | |
| 36C25923B0007 0003.docx | DOCX document | |
| OR HVAC PH 2 - ADD 01 SPECS.pdf | ||
| 36C25923B0007 0002.docx | DOCX document | |
| CHY VA - Asbestos Inspection Report - 2010.pdf | ||
| CHY VA - Asbestos Reinspection Report - November 2018.pdf | ||
| OR HVAC PH 2 - ADD 01 DWGS.pdf | ||
| CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf | ||
| VA Form 4288-R.xlsx | XLSX spreadsheet | |
| 442-21-012 Pre-Bid Sign In.pdf | ||
| 36C25923B0007 0001.docx | DOCX document | |
| Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf | ||
| P07 Wage Determination WY20230023 1 27 2023.pdf | ||
| Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf | ||
| Attachment A - OSHA form - pdf.pdf | ||
| 36C25923B0007_1.docx | DOCX document | |
| S22 LOS 852.219-75.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to non-VIP listed SDVOSBs: $ __________
c) Offeror’s percentage of estimated non-VIP work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
File details come from the government source that posted it. Updated .