36C25923B0007 0004.docx

DOCX document 20 KB Posted

Attached to
Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC
Solicitation number
36C25923B0007
Issued by

About this file

This document contains questions and responses related to a federal solicitation for HVAC work at a Veterans Affairs medical center. The solicitation involves upgrading HVAC systems in operating rooms and support spaces, including installing new lighting controls, transferring electrical feeds to temporary power for less than two hours during the work, and monitoring up to 34 HEPA filters via the building automation system. The control contractor must label each HEPA diffuser and associate it with the correct filter in the BAS for maintenance purposes. Clarification was provided that only one filter per OR ceiling system needs monitoring, rather than the multiple indicators implied in the drawings notes.

View the file

Other files

File Type Posted
36C25923B0007 0007.docx DOCX document
OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf PDF
RFI 5 Q and A_Response.docx DOCX document
36C25923B0007 0006.docx DOCX document
36C25923B0007 0005.docx DOCX document
36C25923B0007 0003.docx DOCX document
OR HVAC PH 2 - ADD 01 SPECS.pdf PDF
36C25923B0007 0002.docx DOCX document
CHY VA - Asbestos Inspection Report - 2010.pdf PDF
CHY VA - Asbestos Reinspection Report - November 2018.pdf PDF
OR HVAC PH 2 - ADD 01 DWGS.pdf PDF
CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf PDF
VA Form 4288-R.xlsx XLSX spreadsheet
442-21-012 Pre-Bid Sign In.pdf PDF
36C25923B0007 0001.docx DOCX document
Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf PDF
P07 Wage Determination WY20230023 1 27 2023.pdf PDF
Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf PDF
Attachment A - OSHA form - pdf.pdf PDF
36C25923B0007_1.docx DOCX document
S22 LOS 852.219-75.docx DOCX document
SELF-PERFORMED CALCULATIONS.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 442-21-012 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25923B0007 04-03-2023

X X X

See page 2.

CONTINUATION PAGE

RFI

OR HVAC PH 1

1. What is the existing brand of the lighting controls in the ORs Response: The existing overall lighting controls in the OR’s are just wall switches. The light booms are existing Steris controls. New lighting will be dimming controls as detailed in the construction documents and specifications.

2. General note A on E1-0 states that outages have to be completed in less than 30 minutes. It’s unlikely we can transfer feeds, especially in the larger panels, to temporary power in less than 30 minutes without doing at least some of the work energized. Is it the intent of the VA that we work energized? Could we have 2 hours and do the work deenergized?

Response: This work will be done deenergized to comply with VA safety standards. A 2-hour outage is acceptable if the contractor follows a prioritized list that will be provided by the VA for which feeds are most critical to get transferred first. Breaker #2 “Lab Cool RM 1-171” will need to be transferred first and has a maximum downtime of 30 minutes.

3. DPEHB3 shows 9 existing loads that need to be given temporary power while we install the new gear. Only one of the feeds has a location. Could we have the locations of the additional 8 loads.

Response:

1. “1-CP-1 + 1-CP-2” (Chilled Water pumps, Chiller Room, Basement)

2. “Lab Cool RM 1-171” (Walk-in Cooler, Lab, First Floor)

3. “1-AC-6 & 1-AC-7” (Air compressors, Chiller Room, Basement)

4. “Spare” May be a spare or may be feeding air compressor in Chiller Room

5. “1-VP-1 & 1-VP-2” (Vacuum pumps, Chiller Room, Basement)

6. “1-AC Dental” (Likely feeding air compressor, Chiller Room, Basement)

7. “Med Comp 1-AC-2 + 1-AC-3” OFF – NOT IN USE

8. “TX EI” EL1 (Transformer either located in MRI Addition or Chiller Room)

9. “No Name” (Unsure of what this is feeding)

10. “MCCEHP-1 Penthouse” (Emergency power panel, Penthouse)

4. There aren’t any fire alarm drawings, please confirm that there won’t be any duct detectors or other fire alarm initiation or notification devices needed.

Response:

1. Correct, there are existing notification devices in the ORs and ductwork but there is no scope of work for these devices.

5. Specification Number: SECTION 23 09 23 There seems to be a conflict on the plans. Note 11 on M2-2B and Note 15 on M2-2A require the control contractor: PROVIDE & FIELD INSTALL HEPA FILTER LOADING INDICATOR THAT IS TO REPORT BACK TO THE BAS. Note 2 on the same plan pages requires: LABEL EACH HEPA LAMINAR FLOW DIFFUSER ON FACEPLATE, TYP. ASSOCIATE FACEPLATE NUMBER WITH FILTER IN Johnson Controls METASYS FOR EASE OF MAINTENANCE. TYP. ALL LAMINAR FLOW DIFFUSERS. Note 2 indicates 12 +12 BI must be provide to the BAS per M2-2A. Note 2 indicates 9 +9 BI must be provide to the BAS per M2-2B.

M5-1 sequence of operation for OR-1 to 4 indicates: FILTER MONITORING:

· FOR ONE FILTER PER LAMINAR FLOW SYSTEM, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 1.5" W.C. (ADJUSTABLE). REFER TO PLANS FOR TOTAL NUMBER OF FILTER DIFFUSERS. EACH ROOM WILL HAVE IT'S OWN ALARM. Per this sequence only 4 BI are required as opposed to 9 + 9+ 12 +12 BI per other notes on plans.

Johnson Controls may not bid this project because the schedule is not feasible to install 9 + 9+ 12+12 BI . The schedule is feasible only 4 BI required by the sequence of operation shown on M5-1 sequence of operation for OR-1 to 4 .

Please clarify how many BI are required for FILTER MONITORING as decried above?

Response: In each OR, only one HEPA filter loading indicator should be installed & monitored per OR ceiling system. The filter should be labeled per Sheet M5-2 and Metasys should reflect this naming convention.

Each individual HEPA laminar flow diffuser with should be labeled individually per M5-2 and Metasys should reflect this naming convention. Per note 5 on M6-0 diffusers will have a filter indicator light that will report back to the BAS.

There will be a total of 34 HEPA filters monitored via the BAS (4 total for OR's & 30 for support spaces).

Also reference Keynotes 13,14, & 15 on Sheet M2-2A and Keynotes 9,10,11 on M2-2B for scope related to this topic.

File details come from the government source that posted it. Updated .