OR HVAC PH 2 - ADD 01 DWGS.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC
- Solicitation number
- 36C25923B0007
About this file
This document package includes construction drawings and specifications for an OR HVAC system upgrade project at the Cheyenne VA Medical Center.
The project involves renovations to the HVAC systems in four operating rooms and associated support spaces in two phases to minimize impacts to facility operations. Phase 1 will update areas A and B while rooms 1 and 2 remain operational. Phase 2 will then update areas A and B while rooms 3 and 4 are still in use. The contractor must provide a detailed phasing plan and schedule for approval.
The drawings provide plans, elevations and details for structural, mechanical and electrical work. This includes plans for new ductwork, piping, diffusers and other mechanical equipment. Structural details show connections for a new modular ceiling system with seismic bracing and attachments to the existing concrete slab and steel structure. Specifications cover requirements for reinforced concrete, welding and bolting.
The solicitation is available through the Department of Veterans Affairs and seeks bids for trade contractors to complete the OR HVAC upgrade project at the Cheyenne VA Medical Center in accordance with the provided construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25923B0007 0007.docx | DOCX document | |
| OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf | ||
| RFI 5 Q and A_Response.docx | DOCX document | |
| 36C25923B0007 0006.docx | DOCX document | |
| 36C25923B0007 0005.docx | DOCX document | |
| 36C25923B0007 0004.docx | DOCX document | |
| 36C25923B0007 0003.docx | DOCX document | |
| OR HVAC PH 2 - ADD 01 SPECS.pdf | ||
| 36C25923B0007 0002.docx | DOCX document | |
| CHY VA - Asbestos Inspection Report - 2010.pdf | ||
| CHY VA - Asbestos Reinspection Report - November 2018.pdf | ||
| CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf | ||
| VA Form 4288-R.xlsx | XLSX spreadsheet | |
| 442-21-012 Pre-Bid Sign In.pdf | ||
| 36C25923B0007 0001.docx | DOCX document | |
| Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf | ||
| P07 Wage Determination WY20230023 1 27 2023.pdf | ||
| Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf | ||
| Attachment A - OSHA form - pdf.pdf | ||
| 36C25923B0007_1.docx | DOCX document | |
| S22 LOS 852.219-75.docx | DOCX document | |
| SELF-PERFORMED CALCULATIONS.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3 4 5 6 7 8
B
C
D
E
F
G
ELEC
B2-120
STOR
B2-121
STOR
B2-122
ANESTHESIA
EQUIP
B2-123
OR 1
B2-94
CORRIDOR
B2-01C
SPS EQUIP
STOR
B2-102
SURGICAL
CORRIDOR
B2-07C
SURGICAL
CORRIDOR
B2-06C
SUB STERILE
B2-126
OR 4
B2-125
OR 3
B2-128
ANESTHESIA
B2-127
OR 2
B2-96
HAC STOR
B2-98
SUB STERILE
B2-96A
PHASE 1
PHASE 2
PHASE 3
AREA B
AREA A
THIS CORRIDOR & HAC STORAGE TO REMAIN
OPEN AND STERILE IN ALL PHASES OF PROJECT.
ANY WORK THAT NEEDS TO OCCUR IN THESE
AREAS WILL BE COORDINATED WITH THE COR
TO OCCUR AFTER HOURS WITH PROPER ICRA.
TAPE AND PLASTIC ICRA BARRIER ACCEPTABLE
AT THESE DOORS DURING PHASE 1.
EXISTING DOUBLE DOORS WILL
BE USED FOR CONTRACTOR
ACCESS DURING PHASE 3. ANTE
ROOM CAN BE CREATED WITH
PLASTIC WALLS WITH MAGNET
OR ZIPPER DOORS.
DURING PHASE 3,
PLASTIC ICRA BARRIER
IS ACCEPTABLE IN THIS
LOCATION.
DURING PHASE 2, A HARD WALL
ICRA BARRIER WILL BE
REQUIRED ACROSS THIS
CORRIDOR. MAINTAIN ACCESS
TO HAC STORAGE.
EXISTING DOUBLE DOORS TO BE
USED FOR CONTRACTOR
ACCESS DURING PHASE 2. ANTE
ROOM CAN BE CREATED WITH
PLASTIC WALLS WITH MAGNET
OR ZIPPER DOORS.
PLASTIC OVER DOOR WITH MAGNET OR
ZIPPER OPENING FOR VA ACCESS AS
NEEDED DURING CONSTRUCTION.
PLASTIC OVER DOOR TO B2-103 WITH MAGNET
OR ZIPPER OPENING FOR VA ACCESS AS
NEEDED DURING CONSTRUCTION.
UNLESS OTHERWISE NOTED, DOORS
BETWEEN CONSTRUCTION AREAS AND
STERILE AREAS MAY BE COVERED IN PLASTIC
AND TAPED, TYPICAL.
EXISTING SINGLE DOOR WILL BE USED FOR
CONTRACTOR ACCESS DURING PHASE 1. ANTE
ROOM CAN BE CREATED WITH PLASTIC WALLS
AND MAGNET OR ZIPPER DOORS. LARGE
EQUIPMENT TRANSPORT CAN BE
COORDINATED DOWN CORRIDOR
B2-06C/B2-07C AFTER SURGERY HOURS.
KEY PLANNORTH
AREA B
AREA A
4 5 6 7 8
B
C
D
E
PHASE 1A
PHASE 2
PHASE 2
PHASE 2
7100 East Belleview Ave.
Suite 107 Greenwood Village, CO 80111 Phone: 720.200.5955
DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL
BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE
COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY
GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE
PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE
OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED
ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW.
www.specializedeng.com
2022 © COPYRIGHT
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
7100 East Belleview Ave.
Suite 107 Greenwood Village, CO 80111 Phone: 720.200.5955 www.specializedeng.com
SES Project : 21238.001
100% CONSTRUCTION
DOCUMENTS
02/10/2023
21238.001
02-10-2023
B
IM
/1
-0
C h e y e n n e
V A
O R
H V
A C
R e n o v a ti o n
/2
.0
C h e y e n n e V
A O
R H
V A
C R e n o v a ti o n M
E P
S
E S
.r v t
/2
/2
:0
:4
A
M
MEP0-0
MEP PHASING AND ICRA
CONSIDERATIONS
CHEYENNE VAMC OR HVAC
SYSTEMS UPGRADE PH2
CHEYENNE, WY
21238.001
BUFFALO
JJW/RJA CJW/ZTR
3/32" = 1'-0"
LEVEL 2 - MEP PHASING
WORK IN PHASE 1 "AREA A" TO BE COMPLETED. OR 1 & OR 2 WILL REMAIN OPERATIONAL.
ONCE THE PUNCH LIST HAS BEEN COMPLETED IN PHASE 1 "AREA A" AND THE HEPA DIFFUSER CHALLENGES
HAVE PASSED, PHASE 1A WILL COMMENCE.
PHASE 1:
WORK IN PHASE 2 "AREA B" TO BE COMPLETED. OR 3 & OR 4 WILL REMAIN OPERATIONAL AND STERILE
CORRIDOR TO AND FROM PRE-OP AND PACU WILL BE MAINTAINED.
FOLLOWING THE COMPLETION OF THE HEPA DIFFUSER CHALLENGE AND PUNCHLIST AND PUNCHLIST, THE SYSTEM TAB, COMMISSIONING AND PARTICULATE TESTING FOR OR 1 & OR 2 SHOULD BE COMPLETED.
FINAL TAB OF THE ENTIRE AHU-1 SYSTEM WITH ALL ICRA BARRIERS REMOVED SHOULD BE COORDINATED WITH VA COR FOR A TWO-DAY SURGICAL SHUTDOWN WHICH WILL OCCUR ON A THURSDAY AND FRIDAY. TAB SHALL CONTINUE THROUGH THE WEEKEND AS NEEDED SO THAT ALL (4) OR'S ARE BALANCED WITH THE PROPER
PRESSURE RELATIONSHIPS AND AVAILABLE FOR USE THE FOLLOWING MONDAY BY 7AM.
PHASE 2:
WORK IN PRE-OP "AREA B" WILL BE LIMITED TO 14 DAYS. THIS PHASE CAN OCCUR CONCURRENTLY DURING ANY PART OF PHASE 1 OR PHASE 2 BUT MUST BE COORDINATED WITH THE VA COR 10 WEEKS IN ADVANCE.
PHASE 3:
THE RENOVATION WORK AT CHEYENNE VA SHALL BE DONE IN PHASES TO MINIMIZE IMPACT ON THE FACILITY AND PATIENT CARE. EXISTING HVAC SYSTEMS SHALL BE OPERATIONAL AT ALL TIMES DURING THE CONSTRUCTION PERIOD EXCEPT FOR PLANNED OUTAGES. SOME WORK SHALL BE DONE DURING OFF HOURS, HOLIDAYS OR WEEKENDS AS REQUIRED BY THE VA OR NECESSARY FOR THE CONTRACTOR TO MEET THE SCHEDULE. THE CONTRACTOR SHALL PROVIDE A COMPLETE PHASING PLAN ALONG WITH PROJECT SCHEDULE WITHIN THREE WEEKS OF AWARD OF CONTRACT FOR VA‘S APPROVAL. THE TASKS INDICATED BELOW ARE ONLY GUIDELINES. SYSTEM SHUT DOWN TIME IS THE MAXIMUM AVAILABLE AND CONTRACTOR SHALL PROVIDE ALL
RESOURCES TO COMPLETE THE TASKS WITHIN AVAILABLE TIME.
PHASING PLAN NOTES:
GC TO PROVIDE AN ICRA PLAN FOR ALL PHASES OF THE PROJECT. ICRA PLAN SHOULD INCLUDE LIFE SAFETY
AND FIRE PROTECTION REQUIREMENTS.
GENERAL NOTES:
Revisions: Date:
ADDENDUM 01 04/24/2023
3/32" = 1'-0"
PENTHOUSE - MEP PHASING
032' 32' 64'030' 30' 60'
032' 32' 64'030' 30' 60'
PHASE 1A IS NOT TO EXCEED 14 CALENDAR DAYS IN TOTAL DURATION. COORDINATE PHASE 1A WITH THE VA 10
WEEKS IN ADVANCE.
PHASE 1A INCLUDES THE MODIFICATIONS TO AHU-1. RE: MECH SHEET M2-3. WHEN AHU-1 IS BACK ONLINE, THE SYSTEM TAB, COMMISSSIONING, AND AIR PARTICULATE TESTING FOR OR-3 AND OR-4 SHOULD BE COMPLETED.
EXPEDITE ALL REPORTS TO THE VA SO THAT OR 3 & OR 4 CAN BE OPEN AT THE END OF THE 14 DAY PHASE.
PHASE 1A:
POST-INSTALLED ANCHORS / REINFORCING STEEL SPECIAL INSPECTIONS
REFERENCE INDIVIDUAL ANCHOR - ICC-ES REPORT
TASKS PERIODIC CONTINUOUS
PRIOR TO START OF WORK REVIEW CONTRACTOR'S INSTALLATION
PROCEDURE - X
PRIOR TO INSTALLATION OF ANCHOR VERIFY TYPE, DIAMETER,
LENGTH, FINISH AND BASE MATERIAL. VERIFY SOLID GROUTED
AREA AROUND ANCHORS IN GROUTED MASONRY. VERIFY MAXIMUM
IMPACT WRENCH TORQUE RATING FOR SCREW ANCHORS
X -
DURING INSTALLATION OF ANCHOR VERIFY HOLE DIMENSIONS,
HOLE CLEANING, ANCHOR EMBEDMENT, EDGE DISTANCES AND
SPACING
AFTER INSTALLATION OF ATTACHED ASSEMBLY VERIFY NUMBER,
EDGE DISTANCES AND ANCHOR FLUSH WITH AND PERPENDICULAR
TO THE RECEIVING SURFACE
AFTER INSTALLED TORQUE TEST
- X
- X
- X
ADHESIVE ANCHORS, REINFORCING STEEL ANCHORED INTO HARDENED CONCRETE
PRIOR TO START OF WORK REVIEW CONTRACTOR'S INSTALLATION
PROCEDURE - X
PRIOR TO INSTALLATION OF ANCHOR VERIFY TYPE, DIAMETER,
LENGTH, FINISH AND BASE MATERIAL. VERIFY SOLID GROUTED
AREA AROUND ANCHORS IN GROUTED MASONRY. VERIFY MAXIMUM
IMPACT WRENCH TORQUE RATING FOR SCREW ANCHORS
DURING INSTALLATION OF ANCHOR VERIFY HOLE DIMENSIONS,
HOLE CLEANING, ANCHOR EMBEDMENT, EDGE DISTANCES AND
SPACING
AFTER INSTALLATION OF ATTACHED ASSEMBLY VERIFY NUMBER,
EDGE DISTANCES AND ANCHOR FLUSH WITH AND PERPENDICULAR
TO THE RECEIVING SURFACE
CURE TIME
AFTER INSTALLED TENSION TEST PER ASTM E488
X -
- X
- X
- X
X -
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS PRIOR TO WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-1
INSPECTION TASKS PRIOR TO WELDING QC QA
WELDER QUALIFICATION RECORDS AND CONTINUITY RECORDS PERFORM OBSERVE
WPS AVAILABLE PERFORM OBSERVE
MANUFACTURER CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE
PERFORM PERFORM
MATERIAL IDENTIFICATION (TYPE / GRADE)
WELDER IDENTIFICATION SYSTEM
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
OBSERVE OBSERVE
OBSERVE OBSERVE
OBSERVE OBSERVE
FIT-UP OF CJP GROVE WELDS OF HSS T-, Y-, AND K-JOINTS
WITHOUT BACKING (INCLUDING JOINT GEOMETRY)
CONFIGURATION AND FINISH OF ACCESS HOLES
FIT-UP OF FILLET WELDS
CHECK WELDING EQUIPMENT
OBSERVE OBSERVE
OBSERVE OBSERVE
OBSERVE -
PERFORM OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS DURING WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-2
INSPECTION TASKS DURING WELDING QC QA
CONTROL AND HANDLING OF WELDING CONSUMABLES OBSERVE OBSERVE
NO WELDING OVER CRACKED TACK WELDS OBSERVE
ENVIRONMENTAL CONDITIONS OBSERVE
WPS FOLLOWED OBSERVE
WELDING TECHNIQUES OBSERVE
PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS PERFORM PERFORM
OBSERVE
OBSERVE
OBSERVE
OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS AFTER TO WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-3
INSPECTION TASKS AFTER WELDING QC QA
WELDS CLEANED OBSERVE
SIZE, LENGTH, AND LOCATION OF WELDS PERFORM
OBSERVE
WELDS MEET VISUAL ACCEPTANCE CRITERIA
ARC STRIKES
K-AREA
WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AND
BUILT-UP HEAVY SHAPES
PERFORM PERFORM
BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED
JOINT OR MEMBER
NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE
APPROVAL OF EOR
PERFORM PERFORM
OBSERVE OBSERVE
PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS PRIOR TO BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-1
INSPECTION TASKS PRIOR TO BOLTING QC QA
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR
FASTENER MATERIALS
OBSERVE PERFORM
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS OBSERVE PERFORM
CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL OBSERVE OBSERVE
CORRECT BOLTING PROCEDURE SELECTED FOR JOINT DETAIL OBSERVE OBSERVE
CONNECTION ELEMENTS, INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITIONS AND HOLE PREPARATION,
IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
OBSERVE OBSERVE
PRE-INSTALLATION VERIFICATION TESTING PERFORM OBSERVE
PROPER STORAGE PROVIDED FOR BOLTS, NUTS,
WASHERS, AND OTHER FASTENER COMPONENTS
OBSERVE OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS DURING BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-2
INSPECTION TASKS DURING BOLTING QC QA
FASTENER ASSEMBLIES PLACED IN ALL HOLES AND
WASHERS AND NUTS ARE POSITIONED AS REQUIRED
OBSERVE OBSERVE
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR
TO THE PRE-TENSIONING OPERATION
OBSERVE OBSERVE
FASTENER COMPONENT NOT TURNED BY THE WRENCH
PREVENTED FROM ROTATING
OBSERVE OBSERVE
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC
SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST
RIGID POINT TOWARDS THE FREE EDGES
OBSERVE OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2018 IBC 1705.2
INSPECTION TASKS AFTER BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-3
INSPECTION TASKS AFTER BOLTING QC QA
PRE-INSTALLATION VERIFICATION TESTING PERFORM PERFORM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/10/23
Calibre Engineering, Inc.
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
B
IM
C he ye nn e
V A
M C
O R
H V
A C
U pg ra de
0/ C he ye nn e
V A
M C
O R
U pg ra de
S tr uc tu ra l C en tr al
.r vt
4/
/2
1:
:3
P
M
S-002
STRUCTURAL QA NOTES AND
TABLES
OR HVAC SYSTEM UPGRADE PH
CHEYENNE, WY
442-21-012
BUFFALO
ES JB
QUALITY ASSURANCE PLAN AND STATEMENT OF SPECIAL INSPECTION NOTES
1. SPECIAL INSPECTIONS FOR THIS PROJECT ARE REQUIRED PER THE 2018 INTERNATIONAL BUILDING CODE CHAPTER 17, SECTION 1704 AND 1705. SEE PROJECT SPECIFICATIONS AND STATEMENT OF
SPECIAL INSPECTIONS BELOW FOR SPECIFIED REQUIREMENTS.
2. THE OWNER SHALL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY TO PERFORM SPECIAL INSPECTION SERVICES FOR ALL STRUCTURAL MEMBERS AND ASSEMBLIES. SPECIAL INSPECTORS’
INSPECTIONS ARE IN ADDITION TO ANY INSPECTION PERFORMED BY THE AUTHORITY HAVING
JURISDICTION.
3. THE SPECIAL INSPECTOR OR INSPECTION AGENCY RETAINED FOR CONDUCTING INSPECTIONS SHALL
NOT BE EMPLOYED DIRECTLY OR INDIRECTLY BY THE CONTRACTOR, UNLESS APPROVED BY THE
AUTHORITY HAVING JURISDICTION.
4. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING:
a. STEEL CONSTRUCTION (IBC 1705.2, AISC 360-16)
1. WELDING
2. HIGH STRENGTH BOLTS
b. ANCHORAGE OF PLUMBING, MECHANICAL, AND ELECTRICAL EQUIPMENT (IBC 1705.12.6)
5. SEE INSPECTION TABLES AND REFERENCED DOCUMENTS FOR MORE IN-DEPTH INSPECTION
REQUIREMENTS.
a. ‘O’ = OBSERVE, INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM BASIS
b. ‘P’ = PERFORM, INSPECTOR SHALL PERFORM TASKS FOR EACH MEMBER
6. FOR SHOP FABRICATED MEMBERS AND ASSEMBLIES, INSPECTIONS SHALL OCCUR UNLESS THE FABRICATOR IS REGISTERED AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO PERFORM
SUCH WORK WITHOUT SPECIAL INSPECTION OR HAS A CURRENT ICC-ES EVALUATION REPORT.
a. AT COMPLETION OF FABRICATION BY AN APPROVED FABRICATOR, THE FABRICATOR SHALL
SUBMIT A CERTIFICATE OF COMPLIANCE THAT THE WORK WAS COMPLETED IN COMPLIANCE WITH
CONTRACT DOCUMENTS.
7. THE SPECIAL INSPECTOR FOR EACH MATERIAL SHALL SUBMIT SPECIAL INSPECTOR QUALIFICATIONS TO
THE AUTHORITY HAVING JURISDICTION PRIOR TO START OF WORK
8. A FINAL REPORT OF SPECIAL INSPECTIONS, DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL
INSPECTIONS, INCLUDING TESTING AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE
INSPECTIONS, SHALL BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION STATING THAT THE WORK WAS COMPLETED IN SUBSTANTIAL CONFORMANCE TO THE APPROVED PLANS, SPECIFICATIONS, AND THE APPLICABLE PROVISIONS OF THE CODE. ANY WORK NOT IN COMPLIANCE SHALL BE DESCRIBED
IN THE REPORT.
9. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND COORDINATING THE WORK WITH THE
INSPECTOR (WITH UPDATES AS NEEDED) TO FACILITATE PROPER INSPECTION PER THE CODE.
CONTRACTOR SHALL KEEP WORK EXPOSED AND ACCESSIBLE UNTIL REQUIRED SPECIAL INSPECTIONS
ARE COMPLETE. ANY COSTS TO RE-EXPOSE AREAS NOT INSPECTED SHALL BE BORNE BY THE
CONTRACTOR.
10. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR
CORRECTION. INSPECTOR SHALL SUBMIT TIMELY REPORTS OF NON-CONFORMANCE TO SEOR.
11. STRUCTURAL OBSERVATION BY THE ENGINEER DOES NOT CONSTITUTE SPECIAL INSPECTIONS.
Revisions: Date:
ADDENDUM 01 04/24/2023
REINFORCING STEEL NOTES:
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN ACCORDANCE WITH THE "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318) AND THE "MANUAL OF STANDARD PRACTICE
FOR REINFORCED CONCRETE CONSTRUCTION" CRSI AND WCRSI AS MODIFIED BY THE PROJECT
DRAWINGS AND SPECIFICATIONS.
2. DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615 GRADE 60.
3. WELDING OF REINFORCING SHALL BE WITH LOW HYDROGEN ELECTRODES IN CONFORMANCE WITH
"RECOMMENDED PRACTICES FOR WELDING REINFORCING STEEL, ETC." AMERICAN WELDING SOCIETY
(AWS) AWS D1.4 WELDING OF REINFORCING STEEL IS LIMITED TO A706 REBAR.
4. NO REINFORCING BAR BENDS SHALL BE MADE UNLESS A706 REBAR.
5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064 GR. 65.
6. MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6” OR TWO MESH PANELS, WHICHEVER IS GREATER.
7. SPLICES SHALL BE MADE WHERE INDICATED ON THE STRUCTURAL DRAWINGS. IF NOT INDICATED, SPLICE BEAM BOTTOM BARS OVER SUPPORTS AND TOP BARS AT MIDSPAN. MAKE BAR CONTINUOUS
AROUND CORNERS UON. ALL SPLICES TO BE CONTACT TENSION SPLICE (CLASS B) UON.
8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME GRADE, SIZE, SPACING, AND NUMBER AS THE SPECIFIED VERTICAL REINFORCING, UON.
9. WHERE A 90°, 135°, OR 180° HOOK IS GRAPHICALLY INDICATED, PROVIDE CORRESPONDING ACI
STANDARD HOOKS UON.
CONCRETE NOTES:
1. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL CONFORM TO THE "BUILDING CODE FOR REINFORCED CONCRETE" ACI 318, AND THE "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS", ACI 301, LATEST EDITIONS, WITH MODIFICATIONS AS NOTED ON THE
DESIGN DRAWINGS OR SPECIFICATIONS.
2. CONCRETE MIXES SHALL BE SUBMITTED FOR REVIEW, DESIGNED BY A QUALIFIED TESTING
LABORATORY AND SHALL BEAR THE SEAL OF AN ENGINEER LICENSED IN THE UNITED STATES. SEE
CONCRETE MIX TABLE FOR MIX REQUIREMENTS.
3. AGGREGATE FOR HARD ROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C33 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED ONLY WITH PERMISSION OF THE
STRUCTURAL ENGINEER THROUGH THE COR.
4. CONCRETE MIXING OPERATIONS, ETC. SHALL CONFORM TO ASTM C94.
5. PLACEMENT OF CONCRETE SHALL CONFORM TO ACI 305 "HOT WEATHER CONCRETING" AND ACI 306 "
COLD WEATHER CONCRETING" WHEN APPLICABLE
6. CLEAR COVERAGE OF CONCRETE OVER REINFORCING BARS TO BE AS FOLLOWS:
7. ALL REINFORCING BARS, ANCHOR BOLTS, AND OTHER CONCRETE INSERTS SHALL BE WELL SECURED IN
POSITION PRIOR TO PLACING CONCRETE
8. MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH SLAB ON GRADE, CONCRETE
ON STEEL DECK, FRAMED CONCRETE FLOORS, AND WALLS DO NOT REQUIRE SLEEVES, UNLESS
OTHERWISE INDICATED IN THE PROJECT SPECIFICATIONS, MECHANICAL OR ELECTRICAL DRAWINGS. IF
SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE PLACING CONCRETE. DO NOT CUT ANY
REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENINGS IN CONCRETE IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH CONCRETE
BEAMS OR COLUMNS UNLESS SPECIFICALLY DETAILED.
9. ANY CONDUIT, INCLUDING JUNCTION BOXES, INTENDED TO RUN WITHIN STRUCTURAL ELEMENTS, INCLUDING SLABS, BEAM, & COLUMNS, MUST BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO PLACING IN THE FIELD. CONTRACTOR SHALL ACCOUNT FOR ADDITIONAL REINFORCING NEEDED IF
CONDUIT AND RECESSED BOXES ARE USED.
10. PROJECTING CORNERS OF BEAMS, WALLS, COLUMNS, ETC., SHALL BE FORMED WITH A ¾” CHAMFER, UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
11. ALL CONCRETE NOT SPECIFICALLY SHOWN WITH REINFORCEMENT SHALL BE REINFORCED IN THE SAME MANNER AS SIMILAR CONDITIONS OR WITH REINFORCEMENT MEETING THE MINIMUM REQUIREMENTS OF
ACI-318.
12. CONCRETE SLAB SHALL BE WET MAT, MOIST CURED FOR A MINIMUM OF 7 DAYS.
13. CURING COMPOUNDS USED ON CONCRETE THAT IS TO RECEIVE A RESILIENT FINISH SHALL BE
APPROVED BY THE FINISH APPLICATOR BEFORE USE.
14. CONCRETE CONSTRUCTION JOINT SURFACE SHALL BE CLEANED AND ALL LAITANCE AND LOOSE
MATERIAL REMOVED PRIOR TO SECOND CONCRETE PLACEMENT.
CONCRETE MIX TABLE
USE
f'c
(KSI)
CONCRETE
WEIGHT
MAX.
W/C
RATIO
MAX.
AGG
. (IN)
AIR
CONTENT
EXPOSURE
CLASS
OTHER
NOTES
INTERIOR TOPPING SLABS 3.5 NWT 0.5 3/4 - F0, S0, W0, C0 -
MIX TABLE NOTES:
1. CEMENT TYPE TO BE TYPE ASTM C150 I/II OR ASTM C595 TYPE IL UNLESS
OTHERWISE NOTED.
2. CONTRACTOR TO PROVIDE SLUMP AS NEEDED FOR WORKABILITY AND
CONSISTENCY TO BE PLACED INTO FORMS AND AROUND REINFORCEMENT
WITHOUT SEGREGATION OR EXCESS BLEEDING. USE ADMIXTURES AS REQUIRED
TO OBTAIN DESIRED RESULTS.
3. NORMAL WEIGHT (NWT) CONCRETE SHALL HAVE A DRY DENSITY OF 145 ± 5 PCF
AND LIGHTWEIGHT (LWT) CONCRETE SHALL HAVE A DRY DENSITY OF 110 ± 5 PCF.
4. AIR CONTENT SHALL BE ± 1 1/2% FROM REQUIRED VALUES. DO NOT PROVIDE AIR
ENTRAINING ADMIXTURES TO ANY INTERIOR SLABS UNLESS CONTRACTOR CAN
DEMONSTRATE TO ARCHITECT THAT SLABS WITH ENTRAINED AIR WILL HAVE
ACCEPTABLE FINISH.
5. EXPOSURE CLASS DEFINITION PER ACI301/318. CONTRACTOR TO PROVIDE MIXES
THAT MEET THESE REQUIREMENTS. FOR CORROSION PROTECTION OF
REINFORCING (C0, C1, C2) PROVIDE MAXIMUM CHLORIDE ION CONTENT IN
CONCRETE (%/WT) OF C0 = 1.0, C1 = 0.3, C2 = 0.15).
6. FOR SLABS ON GRADE, REQUIRED MINIMUM FLEXURAL STRENGTH = 6.7√f'c.
CONCRETE PLACEMENT CONDITION CONCRETE COVER
CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3"
CONCRETE EXPOSED TO EARTH OR WEATHER, #6
THROUGH #18 BAR
2"
CONCRETE EXPOSED TO EARTH OR WEATHER, #5 BAR
AND SMALLER
1 1/2"
CONCRETE NOT EXPOSED: SLABS, WALLS, AND JOISTS,
#14 AND #18 BAR
1 1/2"
CONCRETE NOT EXPOSED: SLABS, WALLS, AND JOISTS,
#11 BAR AND SMALLER
3/4"
CONCRETE NOT EXPOSED: BEAMS, COLUMNS (PRIMARY
REINF., TIES, STIRRUPS, SPIRALS)
1 1/2"
SLABS ON GRADE (FROM TOP) 1 1/2"
4/24/23
ED
EC
EB
E6 E7
(E) 4" DROP SLAB, TYP
(E) 9" TWO WAY
CONCRETE SLAB
S-501
TYP
EF
E3E2 E4 E5
(E )W
X
(E )W
X
(E )W
X
(E )W
X
(E )W
X
(E )W
X
(E )W
X
(E )W
X
(E)W24X76(E)W24X55(E)W24X55
(E)W12X14 (E)W12X14 (E)W12X14 (E)W12X14 (E)W12X14
(E)W12X14
(E)W12X14
(E)W12X26
(E )W
X
(E)W12X14
(E)W12X14
(E)W12X14
(E )W
X
(E )W
X
(E)W12X14
(E)W12X14
(E )W
X
(E )W
X
(E )W
X
(E)W12X14
(E )W
X
(E )W
X
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14W12X14
W12X14
S-501
S-501
SIM
S-501
TYP
(E) 3N
NOTE:
1. CONTRACTOR TO VERIFY IN FIELD EXACT LOCATION OF EXISTING FRAMING
2. ADJUST W12 LOCATION AS NEEDED TO ACHIEVE FLANGE WELD TO BOTTOM OF DECK
W X
S-501
SIM
EQ EQ
(E) W8, TYP
(E) 3"Ø PIPE COLUMN, TYP
V
IF
± 12' - 6" VIF
MECHANICAL EQUIPMENT (5K),
SEE MECHANICAL DRAWINGS
S-501
EQ EQ EQ
S-501
TYP
EXISTING POSTS BELOW, TYP
W8x15
W x
W x
W8x15
TYP 4
SIDES
/1 S-401
/2 S-401
/3 S-401
GRAVITY
LATERAL
MARK
CONNECTION
TYPE CONCRETE STEEL
(E) CONSTRUCTION TYPE
/7 S-501
/8 S-501
/9 S-501
/3 S-501
/4 S-501
/6 S-501
NOTE:
1. CONNECTION LOCATIONS ARE APPROXIMATE,
CONTRACTOR TO VERIFY WITH
MANUFACTURER'S DRAWINGS
2. LATERAL BRACE IS TO BE INSTALLED IN
DIRECTION OF MARK UON
MAX LOAD
(FACTORED)
TU = 3000 LB
FP = 985 LB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/10/23
Calibre Engineering, Inc.
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
B
IM
/C h e y e n n e V
A M
C O
R H
V A
C U p g ra d e
/C h e y e n n e
V A
M C
O R
U p g ra d e
S tr u c tu ra l C e n tr a l.
rv t
/2
/2
:3
:3
P
M
S-401
ENLARGED STRUCTURAL PLANS OR HVAC SYSTEM UPGRADE PH
CHEYENNE, WY
442-21-012
BUFFALO
ES JB
1/4" = 1'-0"
OR 1 & 2 REFLECTED CEILING STRUCTURAL PLAN
1/4" = 1'-0"
OR 3 & 4 REFLECTED CEILING STRUCTURAL PLAN
3/4" = 1'-0"
EXISTING MECHANICAL PLATFORM
PLAN NORTH
PLAN NORTH
PLAN NORTH
LEGEND:
SHEET NOTES:
1. SEE GENERAL NOTES, SPECIFICATIONS, AND
DETAILS FOR ADDITIONAL INFORMATION.
2. SEE ARCHITECTURAL DRAWINGS FOR PATIENT LIFT
TRACKS, TYP. SUPPORT STRUCTURE AND
CONNECTIONS TO EXISTING STRUCTURE BY
CONTRACTOR. SEE LIFT TRACK SUPPLIER'S
DETAILS, INSTALLATION REQUIREMENTS, AND
CALCULATIONS FOR ADDITIONAL INFORMATION.
3. SUBMIT ANY PROPOSED NEW OPENINGS FOR
REVIEW.
4. CONTRACTOR TO LOCATE EXISTING REINFORCING
AND ADJUST ALL NEW FLOOR PENETRATIONS AND
NEW STRUCTURAL CONNECTIONS TO AVOID
REINFORCING.
Revisions: Date:
ADDENDUM 01 04/24/2023
1/4 1-12
1/4
1/4
CONTINUOUS PL 3/8x5
PL 3/8"x3-1/2"x6" W/ (2) 3/4"Ø
A325 BOLTS
MECHANICAL EQUIPMENT, SEE
MECHANICAL DRAWINGS
1/2" MAX
1 1/2"
1 1/2"
/2
/2
5" MAX
COORDINATE DIMENION WITH
SELECTED EQUIPMENT. CENTER
EQUIPMENT ON EXISTING STEEL
FRAME.
1/4
1/4
TYP
PL 3/8"x3-1/2"x6" W/ (2) 3/4"Ø
A325 BOLTS
1 1/2" 1 1/2"
/2
/2
1/2" MAX
NOTES:
1. CONTRACTOR TO COORDINATE LOCATION OF ANCHOR WITH MODULAR
CEILING SYSTEM MANUFACTURER'S REQUIREMENTS AND ARCH, MECH,
PLUMB, AND ELEC DRAWINGS.
2. CONTRACTOR TO LOCATE AND AVOID EXISTING REINFORCING. ADJUST
LOCATION OF POST- INSTALLED ANCHORS AS REQUIRED.
3. MIN SPACING TO ADJACENT ANCHORS IS 5", STAGGER ANCHORS IN
ADJACENT UNISTRUT AS NEEDED
UNISTRUT P5000, OR
APPROVED EQUALA325 THREADED
ROD PER MODULAR
CEILING SYSTEM
MANUFACTURER
18" MAX
6" MIN 1/2"Ø HILTI KWIK HUS-EZ
W/ 3-1/4" MIN EMBED, TYP
1-1/2" MIN, TYP
NOTES:
1. SEE DETAIL FOR MORE INFORMATION
UNISTRUT P5001, OR
APPROVED EQUAL
5/8"Ø THREADED
ROD
/3 S-501
EXISTING MEP
DISTRIBUTION,
CONTRACTOR TO
COORDINATE WITH MECH,
PLUMB, ELEC DRAWINGS
8" MAX
3' - 0" MAX
60" MAX
A325 THREADED
ROD PER MODULAR
CEILING SYSTEM
MANUFACTURER
UNISTRUT P5001, OR
APPROVED EQUAL
4" MIN, TYP
1/8
1/8
TYP
UNISTRUT, P1001HS OR
APPROVED EQUAL
LATERAL BRACE
UNISTRUT P1354AW, OR
APPROVED EQUAL. INSTALL
PER MANUFACTURER'S
REQUIREMENTS
MODULAR CEILING SYSTEM,
INSTALL PER
MANUFACTURER'S
REQUIREMENTS
NOTE:
1. MAXIMUM LENGTH OF LATERAL BRACE IS 12'-0"
UNISTRUT P1354AW, OR
APPROVED EQUAL. INSTALL
PER MANUFACTURER'S
REQUIREMENTS
°-5
1' - 0" 1 1/2", TYP
1/2"Ø HILTI KWIK HUS-EZ
W/ 3-1/4" MIN EMBED, TYP
UNISTRUT P1000HS, OR
APPROVED EQUAL
UNISTRUT, P1001HS OR
APPROVED EQUAL
LATERAL BRACE
NOTE:
1. MAXIMUM LENGTH OF LATERAL BRACE IS 12'-0"
2. CONTRACTOR TO LOCATE AND AVOID EXISTING REINFORCING. ADJUST
LOCATION OF POST- INSTALLED ANCHORS AS REQUIRED.
3. MIN SPACING TO ADJACENT ANCHORS IS 5", STAGGER ANCHORS IN
ADJACENT UNISTRUT AS NEEDED
2" MIN
60" MAX
A325 THREADED
ROD PER MODULAR
CEILING SYSTEM
MANUFACTURER
UNISTRUT P5001, OR
APPROVED EQUAL
5/8"Ø THREADED
ROD
4" MIN, TYP
NOTE:
1. (1) CONNECTION TO MODULAR CEILING SYSTEM PERMITTED PER
UNISTRUT SPAN, (1) ADDITIONAL CONNECTION PERMITTED
BETWEEN BEAM CLAMPS
(1/8)
(1/8)
TYP
UNISTRUT P1354AW, OR
APPROVED EQUAL. INSTALL
PER MANUFACTURER'S
REQUIREMENTS
°-5
M A
X
UNISTRUT, P1001HS OR
APPROVED EQUAL
LATERAL BRACE
NOTE:
1. MAXIMUM LENGTH OF LATERAL BRACE IS 12'-0"
2. WELD IN LIEU OF BOLT AT EXISTING BEAM WEB AT CONTRACTOR'S OPTION
1/8
3 SIDES,
SEE NOTE 2
1/4
1/4
PL 3/8x3-1/2x9 W/ (3) 3/4"Ø
BOLTS
1/2" MAX, TYP 1 1/2"
/2
1/8 1-12
BEAM TO
DECK
WWR 6x6-W2.9x2.9
C L R
M
IN
E M
B E
D
M
A X
#4xCONT AT PERIMETER
#4 @ 16" OC WITH HILTI HIT-HY 100 OR APPROVED EQUAL
NOTES:
1. SEE ARCHITECTURE FOR SIZE, THICKNESS, AND LOCATIONS
2. CONTRACTOR TO COORDINATE SIZE OF PAD WITH SELECTED EQUIPMENT
3. PRIOR TO DRILLING DOWELS, CONTRACTOR TO LOCATE (E) REINFORCING. DO NOT DAMAGE (E) REINFORCING
2" CLR
(E) HOUSEKEEPING PAD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
100% CONSTRUCTION
DOCUMENTS
02/10/23
Calibre Engineering, Inc.
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
B
IM
/C h e y e n n e V
A M
C O
R H
V A
C U p g ra d e
/C h e y e n n e
V A
M C
O R
U p g ra d e
S tr u c tu ra l C e n tr a l.
rv t
/2
/2
:3
:3
P
M
S-501
STRUCTURAL DETAILS OR HVAC SYSTEM UPGRADE PH
CHEYENNE, WY
442-21-012
BUFFALO
ES JB
1 1/2" = 1'-0"
CONNECTION AT EXISTING W8
1 1/2" = 1'-0"
CONNECTION AT W8
1 1/2" = 1'-0"
TYPICAL MODULAR CEILING SYSTEM CONNECTION AT CONCRETE SLAB
1 1/2" = 1'-0"
TYPICAL MODULAR CEILING SYSTEM BYPASS CONNECTION AT CONCRETE SLAB
1 1/2" = 1'-0"
MODULAR CEILING SYSTEM CONNECTION AT W12
1 1/2" = 1'-0"
TYPICAL MODULAR CEILING SYSTEM SEISMIC BRACE CONNECTION
1 1/2" = 1'-0"
TYPICAL MODULAR CEILING SYSTEM SEISMIC BRACE AT CONCRETE SLAB
1 1/2" = 1'-0"
MODULAR CEILING SYSTEM CONNECTION AT VARIED W-SHAPES
1 1/2" = 1'-0"
TYPICAL MODULAR CEILING SYSTEM SEISMIC BRACE AT W SHAPE
NOTE:
1. REMOVE AND REPLACE (E) FIREPROOFING AS NEEDED TO MAKE
CONNECTION
1 1/2" = 1'-0"
TYPICAL BEAM TO BEAM CONNECTION AT W24
1 1/2" = 1'-0"
EQUIPMENT PAD AT (E) SLAB
Revisions: Date:
ADDENDUM 01 04/24/2023
| Sheets |
| MEP0-0 - MEP PHASING AND ICRA CONSIDERATIONS |