CHY VA - Asbestos Inspection Report - 2010.pdf
PDF 12 MB Posted
- Attached to
- Z2DA--442-21-012 OR HVAC PH 2 Cheyenne VAMC
- Solicitation number
- 36C25923B0007
About this file
This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. Solicitation number 36C25923B0007 seeks proposals for HVAC Phase 2 work at the Cheyenne VA Medical Center. Services required include HVAC system upgrades and replacements. The attached asbestos inspection report from 2010 provides necessary background information on existing conditions. Proposals are due by the date listed on the FedBizOpps solicitation, with work to be completed within the timeframe outlined in the final awarded contract. Key contact information and technical specifications will be provided to interested parties that meet minimum eligibility requirements for the set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25923B0007 0007.docx | DOCX document | |
| OR 3 4 Steel Asbestos Lead Report - 05.09.23.pdf | ||
| RFI 5 Q and A_Response.docx | DOCX document | |
| 36C25923B0007 0006.docx | DOCX document | |
| 36C25923B0007 0005.docx | DOCX document | |
| 36C25923B0007 0004.docx | DOCX document | |
| 36C25923B0007 0003.docx | DOCX document | |
| OR HVAC PH 2 - ADD 01 SPECS.pdf | ||
| 36C25923B0007 0002.docx | DOCX document | |
| CHY VA - Asbestos Reinspection Report - November 2018.pdf | ||
| OR HVAC PH 2 - ADD 01 DWGS.pdf | ||
| CHY VA - ACM Sampling for AHU 1 23 project - 10.23.20.pdf | ||
| VA Form 4288-R.xlsx | XLSX spreadsheet | |
| 442-21-012 Pre-Bid Sign In.pdf | ||
| 36C25923B0007 0001.docx | DOCX document | |
| Cheyenne VA OR HVAC PH 2 100 Specs FINAL.pdf | ||
| P07 Wage Determination WY20230023 1 27 2023.pdf | ||
| Cheyenne VA OR HVAC PH 2 100 Drawings FINAL FOR BID.pdf | ||
| Attachment A - OSHA form - pdf.pdf | ||
| 36C25923B0007_1.docx | DOCX document | |
| S22 LOS 852.219-75.docx | DOCX document | |
| SELF-PERFORMED CALCULATIONS.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS SURVEY REPORT
Department of Veterans Affairs Medical Center
Cheyenne, Wyoming Buildings: 1, 1C, 1CA, 1CX, 4, 5, 6, 7, 8, 11, 12, 13, 18, 19, 20, 23, 25, 26, 42 and 45.
November 24, 2010
Prepared for:
Mr. David C. Eyre (COTR)
Department of Veterans Affairs Rocky Mountain Network
VISN 19 Contracting 4100 Mississippi Ave., Suite 610
Glendale, Colorado 80246
Prepared by:
300 East Mineral Avenue, Suite 7 Littleton, Colorado 80122
Managed by: Reviewed by:
Cheyenne VA Medical Center Table of Contents -1 B&A Environmental Asbestos Inspection & Assessment Project No. GF-101-05
Table of Contents
EXECUTIVE SUMMARY (RESPONSE ACTIONS)
1.0 INTRODUCTION AND SCOPE OF WORK
2.0 INSPECTION PROCEDURES
2.1 Building Inspection and Sampling
2.2 Bulk Sampling
2.3 Bulk Sample Analysis
3.0 SURVEY FINDINGS
3.1 ACMs
3.2 Non-ACBM
3.3 Damage and Hazard Assessment
3.3.1 Hazard Rank Codes
3.4 Special Considerations
3.5 Inaccessible Areas
3.5.1 Structural Mechanical Enclosures
4.0 APPLICABLE RULES AND REGULATIONS
4.1 Renovation and Demolition (EPA and OSHA)
5.0 COST ESTIMATES FOR REMOVAL
5.1 Cost Estimate Limitations
6.0 PROJECT LIMITATIONS
APPENDIX A: REFERENCES AND GENERAL INSPECTION INFORMATION
APPENDIX B: INSPECTOR CERTIFICATES
APPENDIX C: BUILDING 1
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Cheyenne VA Medical Center Table of Contents -2 B&A Environmental
Building Floor Plans
Laboratory Analytical Results
APPENDIX D: BUILDING 1C
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX E: BUILDING 1CA
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX F: BUILDING 1CX
Building Description
Data Tables
• Table 1: Material Summary
Cheyenne VA Medical Center Table of Contents -3 B&A Environmental
• Table 2: Materials Requiring Immediate Actions
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX G: BUILDING 4
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX H: BUILDING 5
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
APPENDIX I: BUILDING 6
Cheyenne VA Medical Center Table of Contents -4 B&A Environmental
Building Description
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX J: BUILDING 7
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX K: BUILDING 8
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
Cheyenne VA Medical Center Table of Contents -5 B&A Environmental
APPENDIX L: BUILDING 11
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX M: BUILDING 12
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX N: BUILDING 13
Building Description
Cheyenne VA Medical Center Table of Contents -6 B&A Environmental
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX O: BUILDING 18
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX P: BUILDING 19
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
APPENDIX Q: BUILDING 20
Cheyenne VA Medical Center Table of Contents -7 B&A Environmental
Building Description
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX R: BUILDING 23
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX S: BUILDING 25
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
Cheyenne VA Medical Center Table of Contents -8 B&A Environmental
APPENDIX T: BUILDING 26
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX U: BUILDING 42
Building Description
Data Tables
• Table 1: Material Summary
• Table 2: Materials Requiring Immediate Actions
• Table 3: Room-by-Room Assessment
• Table 4: Bulk Sample Log
Building Floor Plans
Laboratory Analytical Results
APPENDIX V: BUILDING 45
Building Description
Cheyenne VA Medical Center Table of Contents -9 B&A Environmental
• Table 4: Bulk Sample Log
Cheyenne VA Medical Center Executive Summary - 1 B&A Environmental Asbestos Survey Project No. GF-101-05
EXECUTIVE SUMMARY
During September 22 through November 12, 2010, Buys and Associates, Inc. (B&A) conducted an asbestos survey of thirteen buildings on the Department of Veterans Affairs (VA) Medical Center campus, located at 2360 East Pershing Boulevard in Cheyenne, Wyoming. Mr. Craig Bagley with the Department of Veterans Affairs, contracted and requested this inspection to identify Asbestos
Containing Building Materials (ACBMs). According to the Statement of Work provided by the Department of Veterans Affairs, the buildings to be surveyed at the Cheyenne VA included buildings 1, 1C, 1CA, 1CX, 4, 5, 6, 7, 8, 11, 12, 13, 18, 19, 20, 23, 25, 26, 42 and 45. The objective of this inspection was to perform a comprehensive survey to determine the presence and condition of all
ACBM and to recommend response actions for the materials identified. The following materials were identified as requiring a response.
RECOMMENDATIONS
Hazard Rank Codes – all of the ACBM materials, including those that contain less than 1% but greater than none detected, were assigned a Hazard Rank Code 1, 2, 3 or 4. A Hazard Rank Code of 1 requires some immediate response action. Materials assigned a
Hazard Rank Code 4 are those ACBMs that do not pose a significant risk and do not require immediate response. Hazard Rank Codes were determined by assessing the material condition, accessibility, and potential for future disturbance. The Executive Summary
Table above outlines the recommended response actions that accompany Hazard Rank Codes 1 through 3.
• Hazard Ranking Code 1 Materials – These materials are damaged or significantly damaged ACBM with a high fiber release potential. These materials require immediate isolation, removal, repair, encapsulation and/or enclosure by an EPA-certified asbestos abatement contractor.
Cheyenne VA Medical Center Executive Summary - 2 B&A Environmental
• Hazard Ranking Code 2 Materials – These materials are damaged or significantly damaged ACBM with a low to moderate fiber release potential. These materials require removal, repair, encapsulation and/or enclosure by an EPA-certified asbestos abatement contractor.
• Hazard Ranking Code 3 Materials – These materials are intact (in good condition), but present a high potential for disturbance. These materials require removal, enclosure, and/or labeling, or may be managed in the Operations and
Maintenance Plan through more frequent periodic inspections. B&A recommends that any abatement actions be performed by an EPA-certified asbestos abatement contractor.
Operations and Maintenance Plan – the VA Engineering staff should implement the Operations and Maintenance Plan provided with this report immediately. This plan assigns responsibility for program management and coordination and institutes a formal system for coordinating building construction or maintenance activities so that asbestos-containing materials are not inadvertently disturbed.
Cost Estimates for Removal – the Cost Estimates for Response Actions included in the Executive Summary Table above only addresses the costs associated with response actions in specific rooms or functional spaces (i.e., materials assigned a Hazard Rank of 1 through 3). The Material Removal Unit Cost Estimates Table in Section 5 in the body of the report outlines the estimated removal costs associated with all of the various homogeneous materials identified during this survey, including Hazard Ranking 4 materials
(i.e., those materials that are in good condition and have a low potential for disturbance), which were not included in the Executive
Summary table.
The cost estimates below are provided for use in long-term budgeting and planning only, and do not have a level of accuracy sufficient to be used as a construction design cost estimate. The actual cost of asbestos removal is highly dependent on a number of factors such as the size of the job (single room or mechanical enclosure, or an entire floor or building); the required time frame for removal; the time of year the job is conducted; and travel time and distance to the job for the contractor. Therefore, actual removal costs could vary
Cheyenne VA Medical Center Executive Summary - 3 B&A Environmental significantly from these estimates. We have attempted to capture the range of costs in our Unit Removal Cost Estimate. Materials replacement and consultant abatement management costs are not included in these estimates and can add 15 - 50% to the project costs.
The report that follows this Executive Summary should be read in its entirety because it includes important information, such as material descriptions and locations, regulatory requirements, and building specific recommended response actions.
Response Actions and Cost Estimates for Asbestos-Containing Building Materials with Hazard Ranks of 1, 2, or 3
Executive Summary
Hazard Rank
Recommended Response ActionsMaterial Description
Building No. QuantityBuilding Name
Room No.
Material Code
Cost Estimate for Response Actions
Hazard Rank # 1 Material
Comments
Damaged or significantly damaged ACBM with a high disturbance potential. These materials require immediate isolation, removal, repair, encapsulation and/or enclosure.
(1)
50M11.B 11 Main Hospital Attic Brown fire stop caulking ln. ft. Remove or Repair and place in O&M plan
$500 - $2,000<50 ln ft -- Sample in Room 40L
25T01.A 11 Main Hospital Attic Gasket material (not accessible) - NO SAMPLE
TAKEN - ASSUMED
each Remove $2,500 - $5,000<25 each -- Not Accessible -- NO SAMPLE
TAKEN -- ASSUMED
Hazard Rank
Recommended Response ActionsMaterial Description
Building No. QuantityBuilding Name
Room No.
Material Code
Cost Estimate for Response Actions
Hazard Rank # 2 Material
Comments
Damaged or significantly damaged ACBM with a low to moderate disturbance potential. These materials require removal, repair, encapsulation and/or enclosure.
(1)
1000M03.A 21 Main Hospital Attic Wallboard/tape/joint compound, drywall, smooth texture
sq. ft. Remove or Repair and place in O&M plan
$2,000 - $8,000<1000 sq ft -- Sample in Room 40K -- 5% white paint, 25% white compound, 70% tan/white drywall
300M06.A 21 Main Hospital Attic Plaster sq. ft. Remove or Repair and place in O&M plan
$3,000 - $6,000<300 sq ft -- Sample in Room Stairwell 3rd, 4th, 2nd Floor -- 30% tan plaster w/ yellow paint, 70% tan granular plaster
500M03.C 21 Main Hospital Floor 3 Drywall/tape and mud, green sq. ft. Remove or Repair and place in O&M plan
$1,500 - $4,000 -- Sample in Room A312 -- 1st positive stop on all samples -- 5% white tape, 10% green paint, 10% tan compound, 15% tan joint compound 60%
11/26/2010 Page 1 of 3Printed: Cheyenne VA Medical Center
Executive Summary
Hazard Rank
Recommended Response ActionsMaterial Description
Building No. QuantityBuilding Name
Room No.
Material Code
Cost Estimate for Response Actions
Hazard Rank # 2 Material
Comments
Damaged or significantly damaged ACBM with a low to moderate disturbance potential. These materials require removal, repair, encapsulation and/or enclosure.
(1)
100F04.B 21C ICU Surgery Floor 1 9x9 brown tile, under carpet sq. ft. Remove or Repair and place in O&M plan
$500 - $1,000<100 sq ft -- under carpet -- Sample in Room C-118 -- 3% white mastic, 5% tan mastic, 7% brown mastic w/ black foam, 85% dark brown tile
100T02.B 21C ICU Surgery Floor 1 Pipe joint (canvas) ln. ft. Remove or Repair and place in O&M plan and Label
$2,500 - $7,000<100 ln ftRoom C-125A -- 20% White woven wrap, 80% White fibrous plaster
100F07.D 21C ICU Surgery Floor 2 Floor tile with adhesive, 12x12 on 9x9 cannot distinguish pattern
sq. ft. Remove or Repair and place in O&M plan
$500 - $1,000<100 sq ft -- Samples in Room 2F1SB, C-219, C-
202 --- 1st positive stop on all samples -- 3% Brown mastic, 7% black fibrous material 90% white tile
100M10.H 21CA PT/OT Specialty clinics
Basement 2x4 ceiling tile, crater (not accessible, patient in room)
sq. ft. Remove $1,000 - $3,000<100 sq ft -- NA - Patient in room
400F04.A 25 5A Human Resources/5B
Voluntary Services
Basement White, 9x9 floor tile and adhesive
sq. ft. Remove and Repair and place in O&M plan
$2,000 - $4,000Sample in Rm B1 -- 1% black mastic, 99%
White/multi-colored tile
400F04.B 25 5A Human Resources/5B
Voluntary Services
Basement Brown, 9x9 floor tile and adhesive
sq. ft. Remove or Repair and place in O&M plan
$2,000 - $4,000Sample in Rm B3 -- 4% Black mastic, 96%
Brown/Tan tile
11/26/2010 Page 2 of 3Printed: Cheyenne VA Medical Center
Executive Summary
Hazard Rank
Recommended Response ActionsMaterial Description
Building No. QuantityBuilding Name
Room No.
Material Code
Cost Estimate for Response Actions
Hazard Rank # 2 Material
Comments
Damaged or significantly damaged ACBM with a low to moderate disturbance potential. These materials require removal, repair, encapsulation and/or enclosure.
(1)
264F04.A 26 Quarters Basement 9x9 Floor Tile - green with white streaks
sq. ft. Remove and Repair and place in O&M plan
$1,400 - $3,000Sample in Rm 1 -- 1st positive stop on all samples -- 6% brown mastic w/ gray paint, 94% green vinyl flooring w/ debirs
752T10.A 26 Quarters Basement Debris sq. ft. Remove, may just entail thoroughly cleaning area by trained and certified asbestos abatement workers
$5,000 - $10,000Sample in Rm 4, 5 -- Sent for emergency 9/24/10 --
Located in crawl spaces of building
(1) Material Codes: T - Thermal Systems Insulation; F - Floor Covering; S - Surfacing Material (Sprayed or Troweled-on); M - Miscellaneous Material
11/26/2010 Page 3 of 3Printed: Cheyenne VA Medical Center
Cheyenne VA Medical Center 1 B&A Environmental
1.0 INTRODUCTION AND SCOPE OF WORK
During September 22 through November 12, 2010, Buys and Associates, Inc. (B&A) conducted an asbestos survey of thirteen buildings on the Department of Veterans Affairs
(VA) Medical Center campus, located at 2360 East Pershing Boulevard in Cheyenne, Wyoming. Mr. Craig Bagley with the Department of Veterans Affairs, contracted and requested this inspection to identify Asbestos Containing Building Materials (ACBMs).
According to the Statement of Work provided by the Department of Veterans Affairs, the buildings to be surveyed at the Cheyenne VA included buildings 1, 1C, 1CA, 1CX, 4, 5, 6, 7, 8, 11, 12, 13, 18, 19, 20, 23, 25, 26, 42 and 45.
The objective of this inspection was to perform a comprehensive survey to determine the presence and condition of all ACBM and to recommend response actions for the materials identified. The scope of work for this inspection was outlined in solicitation
VA-259-10-RQ-0236.
• Perform a comprehensive survey (inspection and assessment) of selected facilities
(and portions of facilities) to determine the presence of asbestos-containing materials (ACM) according to Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and VA Directives.
• Conduct an Asbestos Assessment of every accessible space in the selected facilities (and portions of facilities).
• Prepare a written report of findings with tables outlining the quantities, types, and locations of ACM, as well as a hazard ranking, recommended response action, and associated cost estimate of implementation of those response actions. In addition, contractor is to provide color CAD drawings identifying the sample locations, and material locations.
• Write an Operations and Maintenance plan that addresses procedures for maintaining existing ACM and implementing the OSHA asbestos notification requirements for building occupants.
Cheyenne VA Medical Center 2 B&A Environmental
• Create a facility database that the VA Engineering staff can query for tabular information about the locations, quantity, damage, access/damage potential, and recommended response actions for the ACMs identified during the survey.
To accomplish this survey, B&A identified all accessible areas in each building by name and room number. Table 3 and 5 in Appendices A through V identifies the functional spaces, materials, quantities, condition, hazard ranking, and any recommended response actions.
The specific buildings (and portions of buildings) included in this survey are:
• Building 1 (all accessible areas)
• Building 1C (all accessible areas)
• Building 1CA (all accessible areas)
• Building 1CX (all accessible areas)
• Building 4 (all accessible areas)
• Building 5 (all accessible areas)
• Building 6 (all accessible areas)
• Building 7 (all accessible areas)
• Building 8 (all accessible areas)
• Building 11 (all accessible areas)
• Building 12 (all accessible areas)
• Building 13 (all accessible areas)
• Building 18 (all accessible areas)
• Building 19 (all accessible areas)
• Building 20 (all accessible areas)
Cheyenne VA Medical Center 3 B&A Environmental
• Building 23 (all accessible areas)
• Building 25 (all accessible areas)
• Building 26 (all accessible areas)
• Building 42 (all accessible areas)
• Building 45 (all accessible areas)
2.0 INSPECTION PROCEDURES
The asbestos survey was performed using the applicable portions of the currently recognized standard protocol developed for schools under Asbestos Hazard Emergency
Response Act (AHERA), as promulgated in Title 40, Code of Federal Regulations (40
CFR), Part 763 and as amended in the Federal Register.
2.1 Building Inspection and Sampling
The building inspections were conducted by EPA-accredited inspectors and consisted of a detailed visual inspection and assessment of the condition and potential for disturbance of suspect asbestos-containing building materials (ACBM). The specific components of the inspection and assessment included:
• Identification and inspection of materials by functional space. Summaries of the suspect materials identified are presented in the Data Tables in the appendices for each building.
• An assessment of suspect, known, or assumed ACBM.
• Identifying suspect ACBM's by material type, with a unique identifier. The 4 groups are thermal system insulation (TSI), surfacing materials, miscellaneous materials, and floor covering.
B&A uses a standardized numbering system to identify Homogeneous Materials during the survey. Letters T, F, S, or M designate material types as follows:
Cheyenne VA Medical Center 4 B&A Environmental
− Thermal Insulation (pipe insulation, fittings, etc.): T01 - T10 (example: T02.2
Hard Pipe Insulation)
− Floor Covering (floor tile, sheet vinyl, mastics and adhesives, floor leveling compounds, cove base, etc.): F01 - F07 (example: F04.4: 9”x9” Floor Tile –
Gray)
− Surfacing Materials (texturing and fire-proofing): S01 - S02
− Miscellaneous Materials (roofing, sink undercoating, gypsum board, etc.):
M01 – M17 (example: M10.1: Gray Window Caulk)
2.2 Bulk Sampling
Inspectors collected bulk samples of suspect ACBM and submitted the samples to an accredited laboratory for analysis. Bulk sample numbers are included in the Bulk
Sample Log (Table 4) in the appendices for each building.
• B&A conducted its sampling in a manner that minimized damage to the building, did not leave unsightly marks, and did not create a health hazard for the inspector or building occupants.
• The number of samples collected from each homogeneous area generally followed the AHERA rules.
• Friable surfacing materials were sampled using the random sampling scheme given in the EPA publication 560/5-85-030a, titled “Asbestos in Buildings:
Simplified Sampling Scheme for Friable Surfacing Materials.”
• Unique sample numbers were assigned to each sample collected during the inspection. The numbers assigned to bulk samples included the Building and
Room Number and the Homogenous Material sampled (example: VA3-001
M10.1 – Red Caulk). These numbers were entered on chain-of-custody forms that accompanied the bulk samples to the analytical laboratory.
• Locations of bulk samples and confirmed ACBM are identified on the Building
Floor Plans in the appendices for each building.
Cheyenne VA Medical Center 5 B&A Environmental
• Each material identified and sampled was photographed with a unique identification number inside the photo. These photos will be viewable in the database that will accompany this report.
2.3 Bulk Sample Analysis
Bulk samples were analyzed using polarized light microscopy (PLM) and visual estimation according to the EPA Interim Method for the Determination of Asbestos in
Bulk Insulation Samples, EPA-600/M4-82-020. The quantification of asbestos in a sample is intended to be an estimate only and the limit of detection for this method is approximately 1% by volume.
Samples were analyzed by Reservoirs Environmental, Inc. (REI) in Denver, Colorado.
REI is accredited under the National Institute of Standards and Technology, National
Voluntary Laboratory Accreditation Program (NIST-NVLAP) for bulk asbestos sample analysis, and is also accredited by the American Industrial Hygiene Association (AIHA).
The laboratory reports are included inthe appendices for each building..
EPA’s National Emissions Standards for Hazardous Air Pollutants (NESHAP) and
AHERA regulations define ACM as material containing greater than 1% asbestos by weight; materials containing 1% or less asbestos are not considered regulated ACM by the EPA. Further, the NESHAP regulations state that any sample found to contain less than 10% asbestos but greater than “none detected,” by the visual estimation method used during PLM analysis, must be assumed to contain greater than 1% asbestos unless confirmed by NESHAP point counting analysis.1
1 NESHAP point counting procedures are outlined in the EPA “Interim” Bulk Method. For each layer of a material to be point-counted, eight mounts are made by dispersing 8 pinches of a sample in suitable fluid.
Each of the mounts is examined under a polarizing microscope using an eyepiece reticule that superimposes a grid of points over the field of view. Fifty non-empty points are examined for each mount, yielding 400 points, some of which will be identified as asbestos and some not. The percentage of asbestos is determined by comparing the number of positive points to the number counted. For example, 4 positive points out of 400 equals 1.0% asbestos.
Cheyenne VA Medical Center 6 B&A Environmental
3.0 SURVEY FINDINGS
3.1 ACMs
ACBM is identified in Tables 1-5, the Building Floor Plans, and the Laboratory
Analytical Results in Appendices C through V. These tables describe the type of material, visual appearance, condition, friability, potential for disturbance, and identify any materials that require immediate actions.
3.2 Non-ACBM
Suspect materials are identified as non-ACBM if the material contains no detectable asbestos. Tables 2 and 3 in Appendices C through V identify the non-ACM materials.
Non-ACM material quantities are included in Table 2.
3.3 Damage and Hazard Assessment
Each ACM was assessed for damage, accessibility, and the potential for future damage.
This information is presented in Table 3, located in Appendices C through V.
3.3.1 Hazard Rank Codes
Hazard Rank Codes were determined by assessing the material condition, accessibility, and potential for future disturbance. ACBM materials, including those that contain less than 1% but greater than none detected, were assigned a Hazard Rank Code 1, 2, 3 or 4.
A Hazard Rank Code of 1 requires some immediate response action. Materials assigned a Hazard Rank Code 4 do not pose a significant risk and do not require immediate response. The Executive Summary Table outlines the recommended response actions that accompany Hazard Rank Codes 1 through 3.
• Hazard Ranking Code 1 Materials – These materials are damaged or significantly damaged ACBM with a high fiber release potential. These materials require immediate isolation, removal, repair, encapsulation and/or enclosure by a
EPA-certified asbestos abatement contractor.
Cheyenne VA Medical Center 7 B&A Environmental
• Hazard Ranking Code 2 Materials – These materials are damaged or significantly damaged ACBM with a low to moderate fiber release potential.
These materials require removal, repair, encapsulation and/or enclosure by a
EPA-certified asbestos abatement contractor.
• Hazard Ranking Code 3 Materials – These materials are intact (in good condition), but present a high potential for disturbance. These materials may be removed, enclosed, and/or labeled, or they may be managed in place in the
Operations and Maintenance Plan. B&A recommends that any intentional contact with ACBM be performed by a EPA-certified asbestos abatement contractor.
• Hazard Ranking Code 4 Materials – These materials are intact (in good condition), and present a low to moderate potential for disturbance and can be managed under the Operations and Maintenance Plan. They should be inspected periodically, however, to ensure they do not deteriorate.
3.4 Special Considerations
Materials with peculiar configurations or that are hidden or obscured, materials or areas that were inaccessible to our inspectors, and materials assumed to be asbestos-containing will be identified in Table 3 in each of the building appendices.
Roofing materials were sampled when it was clear that such sampling would not compromise the integrity of the roof. At the request of the VA Engineering Staff, we did not sample any materials associated with membrane roofs during this survey.
The roofing materials on the following buildings were not sampled:
• Building 1 (membrane roof)
• Building 1C (assumed ACM)
• Building 1CA (assumed ACM)
• Building 1CX (membrane roof)
• Building 4 (assumed ACM)
• Building 5 (assumed ACM)
• Building 6 (assumed ACM)
Cheyenne VA Medical Center 8 B&A Environmental
• Building 7 (assumed ACM)
• Building 8 (assumed ACM)
• Building 11 (assumed ACM)
• Building 12 (assumed ACM)
• Building 13 (assumed ACM)
• Building 18 (assumed ACM)
• Building 19 (assumed ACM)
• Building 20 (assumed ACM)
• Building 23 (assumed ACM)
• Building 25 (assumed ACM)
• Building 26 (assumed ACM)
• Building 42 (non-suspect)
• Building 45 (membrane roof)
3.5 Inaccessible Areas
Suspect materials that were hidden or inaccessible may not have been characterized by this inspection. Therefore, any material not identified in this report as having been tested should be treated as suspect ACM until it has been sampled by a EPA-certified inspector and analyzed by an accredited laboratory applying EPA methods.
In addition, some building structures may have been constructed after the application of
ACM, and therefore may have obscured these materials from visual examination during this inspection. Typical scenarios include thermal system insulation inside hardened mechanical chases, floor tile, and mastic under walls, and sprayed on texturing and/or fireproofing behind structural supports or architectural features.
Cheyenne VA Medical Center 9 B&A Environmental
3.5.1 Structural Mechanical Enclosures
The interior contents of structural mechanical enclosures (hardened chases) were inspected where possible. The chases throughout the building we inspected can be grouped into 3 categories: 1) those that have never been accessed and contain asbestos-containing thermal system insulation, 2) those located within a functional space (floor or section of the building) that has not undergone asbestos removal, but has been abated in conjunction with a pipe leak or other repair operation, and 3) those located in areas wherein large scale abatement projects have been conducted.
We inspected the interior contents of most of the hardened chases we encountered. The
ACBM in some of these hardened chases has been removed; however, many still contain
ACBM, including some hardened chases in areas where large scale asbestos abatement was performed before renovation activities.
3.5.1.1 Recommendation
Prior to demolishing any hardened chase, attempt to inspect the contents to determine if it contains ACBM. If you cannot determine the contents, demolition should be performed applying the requirements of VA Specifications for asbestos abatement.
4.0 APPLICABLE RULES AND REGULATIONS
In Wyoming, EPA asbestos regulations are administered by either the EPA or Wyoming
Department of Air Quality. OSHA is responsible for administering OSHA regulations.
4.1 Renovation and Demolition (EPA and OSHA)
NESHAP regulations require the removal of friable ACM and non-friable ACM that could become friable during demolition activities.
Despite EPA rules exempting building materials containing 1% or less asbestos from stringent regulation, OSHA regulations outline specific precautionary work practices when employees work with materials containing any detectable amounts of asbestos.
Strict compliance by building owners with the OSHA asbestos regulations may result in response actions not required by the EPA for certain unregulated materials.
Cheyenne VA Medical Center 10 B&A Environmental
5.0 COST ESTIMATES FOR REMOVAL
The Cost Estimates for Response Actions included in the Executive Summary and
Operations and Maintenance Plan Tables only address the costs associated with response actions in specific rooms or functional spaces (i.e., materials assigned a Hazard Rank of 1 through 3). The Material Removal Unit Cost Estimates Table below outlines the estimated removal costs associated with all of the various homogeneous materials identified during this survey, including Hazard Ranking 4 materials (i.e., those materials that are in good condition and have a low potential for disturbance), which were not included in the Executive Summary table.
Material Removal Unit Cost Estimates
Materials Locations Estimated.
Quantity*
Unit Removal
Cost Estimate
Floor Tile 1, 1C, 8, 13, 45 7,400 SF $1.5 - $35
Pipe Insulation 1, 4, 7, 11, 13 500 LF $6 - $30
Pipe Fittings 1, 1C, 4, 7, 13 250 EA $5 - $400
Transite 1 50 SF $10 - $25
Caulk 1 200 LF $3 - $40
Window Glazing 6, 19, 20, 25, 26 100 LF $10 - $ 20
Gasket Material 1 50 EA $100 - $300
Sink Undercoating 1, 1C 2 EA $250
Baseboard Mastic 1, 1C, 6 2,500 LF $3 - $6
Drywall 1, 1C, 5, 6, 8, 13 10,000 SF $5 - $20
Plaster 1, 1C, 5, 6, 7, 11 15,000 SF $10 - $30
Vinyl Sheet Flooring 1, 7 500 SF $10 - $25
Surfacing 1, 1C, 4, 8, 13 8,100 SF $15 - $30
Tread 1, 1C 700 SF $8 - $15
Ceiling Tile 1 2,000 SF $10 - $25
Ceiling Tile Mastic 11 5,000 SF $8 - $25
Tar impregnated materials 13 500 SF $8 - $25
Cheyenne VA Medical Center 11 B&A Environmental
Materials Locations Estimated.
Quantity*
Unit Removal
Cost Estimate
Boiler Insulation 13 25 SF $30 - $45
Carpet Glue 13 150 SF $8 - $25
Fire Stop 1C 50 SF $20 - $40
Carpet 1C 50 SF $8 - $25
*SF – square foot; LF – linear foot; EA – each; OD – outside diameter
5.1 Cost Estimate Limitations
These cost estimates are provided for use in long-term budgeting and planning only, and do not have a level of accuracy sufficient to be used as a construction design cost estimate. The actual cost of asbestos removal is highly dependent on a number of factors such as the size of the job (single room or mechanical enclosure, or an entire floor or building); the required time frame for removal; the time of year the job is conducted; and travel time and distance to the job for the contractor. Therefore, actual removal costs could vary significantly from these estimates.
We have attempted to capture the range of costs in our Unit Removal Cost Estimate.
Materials replacement and consultant abatement management costs are not included in these estimates and can add 15 - 50% to the project costs.
6.0 PROJECT LIMITATIONS
This project was performed using, as a minimum, practices consistent with standards acceptable within the industry at this time, and a level of diligence typically exercised by
EH&S consultants performing similar services.
The procedures used attempt to establish a balance between the competing goals of limiting investigative and reporting costs and time, and reducing the uncertainty about unknown conditions. Therefore, because the findings of this report were derived from the scope, costs, time and other limitations, the conclusions should not be construed as a guarantee that all universal, toxic and/or hazardous wastes have been identified and fully evaluated. Furthermore, B&A assumes no responsibility for omissions or errors resulting
Cheyenne VA Medical Center 12 B&A Environmental from inaccurate information, or data, provided by sources outside of B&A or from omissions or errors in public records.
It is emphasized that the final decision on how much risk to accept always remains with the client since B&A is not in a position to fully understand all of the client's needs.
Clients with a greater aversion to risk may want to take additional actions while others, with less aversion to risk, may want to take no further action.
APPENDIX A: REFERENCES AND GENERAL INSPECTION INFORMATION
REFERENCES:
a. Environmental Protection Agency (EPA) Regulations:
i. 40 CFR 763 Subpart E, Asbestos Worker Protection
ii. 40 CFR 61 Subpart M, EPA National Emission Standard for Asbestos
iii. 40 CFR 763 Subpart I, Prohibition of the Manufacture, Importation, Processing, and Distribution of Certain Asbestos-Containing Products
iv. EPA Pamphlet 910-B-96-001, How to Manage Asbestos in School Buildings
b. National Institute of Buildings Sciences (NIBS): Guidance Manual, Asbestos Operations
& Maintenance Work Practices, 2nd Edition
c. Occupational Safety and Health Administration (OSHA) Regulations
i. 29 CFR 1926.1101, Construction Standard for Asbestos
ii. 29 CFR 1910.1001, General Industry Standard for Asbestos
d. Department of Transportation (DOT) Regulations: 49 CFR Sections 171, 172, and 173, Packaging and transportation of asbestos-containing waste material.
e. Wyoming Air Quality Standards and Regulations, Chapter 3, Section 8
f. VA Directives/Policies
i. VA Circular 00-88-6, Management, Abatement, and Removal of Asbestos in VA
Facilities (February 9, 1988)
ii. VA Directive 2004-012, Safety and Health During Construction
iii. H-08-1 VA Master Construction Specification, Section 01569, dated August 1, 1988.
GENERAL ASBESTOS INSPECTION INFORMATION:
1. Homogeneous Materials – B&A uses a standardized numbering system to identify Homogeneous Materials during the survey. Letters T, F, S, or M designate material types as follows:
• Thermal Insulation (pipe insulation, fittings, etc.): T01 - T10 (example: T02.2 Hard Pipe Insulation)
• Floor Covering (floor tile, sheet vinyl, mastics and adhesives, floor leveling compounds, cove base, etc.): F01 - F07 (example: F04.4: 9”x9” Floor Tile – Gray)
• Surfacing Materials (texturing and fire-proofing): S01 - S02
• Miscellaneous Materials (roofing, sink undercoating, gypsum board, etc.): M01 – M17 (example:
M10.1: Gray Window Caulk)
2. Friability: Friability is defined in accordance with EPA’s NESHAP regulations.
• “Friable ACM” is any material containing more than 1% asbestos (as determined by PLM) that, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure and also includes non-friable ACM that may become friable during building demolition.
• “Non-friable ACM” is any material containing more than 1% asbestos (as determined by PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
• “Category I non-friable ACM” are asbestos-containing resilient floor coverings (commonly known as vinyl asbestos tile (VAT)), asphalt roofing products, packings, and gaskets.
• “Category II non-friable ACM” encompasses all other non-friable ACM.
• “Non-friable RACM” is used to denote thermal system insulation that is in good condition but would become friable during renovation or demolition and therefore is “regulated asbestos containing material” (RACM).
APPENDIX B: INSPECTOR CERTIFICATES
APPENDIX C: BUILDING 1
Building 1
Main Hospital
2360 East Pershing Blvd.
Cheyenne, WY
Building 1 was constructed in 1932 and serves as the hospital for the Department of
Veterans Affairs Cheyenne Medical Facility. The structure consists of three levels with basement and attic and is a steel frame and brick construction. The building is approximately 150,000 square feet.
Summary of Asbestos-containing Building Materials Building No.: 1 (Main Hospital)
Table 1
QuantityHomogeneous Material Description ACM Designation(2)(1)
Pebble pattern, tan -- NO SAMPLE TAKEN -- ASSUMED >1% AsbestosF01.A 32 sq. ft.
Light tan speckled sheet vinyl with adhesive >1% AsbestosF01.C 300 sq. ft.
Heavy grey and brown conglomerate >1% AsbestosF03.E 40 sq. ft.
Small grey and brown conglomerate >1% AsbestosF03.F 10 sq. ft.
12x12 floor tile - Light blue/gray tile >1% AsbestosF03.G 200 sq. ft.
9x9 floor tile, brown with black, grey streaks >1% AsbestosF04.A 100 sq. ft.
Stair tread, brown with circle raises -- NO SAMPLE TAKEN -- ASSUMED >1% AsbestosF07.A 200 sq. ft.
Smooth texture >1% AsbestosM03.A 21000 sq. ft.
Wallboard/tape/joint compound >1% AsbestosM03.A 3000 sq. ft.
Wallboard/tape/joint compound, drywall, smooth texture >1% AsbestosM03.A 1000 sq. ft.
Gyp board WJC & tape with heavy knock down texture >1% AsbestosM03.B 6000 sq. ft.
Drywall/tape and mud, green >1% AsbestosM03.C 1500 sq. ft.
Gyp with JC & tape with sponge texture >1% AsbestosM03.H 300 sq. ft.
Plaster, white texture <= 1% AsbestosM06.A 2000 sq. ft.
Plaster >1% AsbestosM06.A 4000 sq. ft.
Plaster <= 1% AsbestosM06.A 900 sq. ft.
Smooth plaster >1% AsbestosM06.A 14000 sq. ft.
Transite panels with smooth texture and yellow paint >1% AsbestosM07.A 50 sq. ft.
Smooth, 2x4 ceiling tile -- NO SAMPLE TAKEN -- ASSUMED >1% AsbestosM10.C 1000 sq. ft.
1x1 big hole ceiling tile >1% AsbestosM10.I 1000 sq. ft.
Brown fire stop caulking >1% AsbestosM11.B 50 ln. ft.
Unknown caulking >1% AsbestosM11.B 100 ln. ft.
Dark green caulking >1% AsbestosM11.D 100 ln. ft.
Outside window caulking >1% AsbestosM11.F 50 ln. ft.
11/22/2010 Page 1 of 2Printed: Cheyenne VA Medical Center
Summary of Asbestos-containing Building Materials
Table 1
QuantityHomogeneous Material Description ACM Designation(2)(1)
6" brown baseboard <= 1% AsbestosM14.E 300 ln. ft.
6" grey cove base with mastic >1% AsbestosM14.F 300 ln. ft.
Sink Undercoating >1% AsbestosM16.A 3 ln. ft.
Other; not listed <= 1% AsbestosM17.A 50 ln. ft.
Gasket material (not accessible) - NO SAMPLE TAKEN - ASSUMED >1% AsbestosT01.A 25 each Gasket material painted white -- NOT ACCESSIBLE -- ASSUMED >1% AsbestosT01.A 50 each Pipe joint, hard fitting B7 >1% AsbestosT02.A 300 ln. ft.
Straight run; not fiberglass >1% AsbestosT03.B 100 ln. ft.
Straight run insulation >1% AsbestosT03.C 100 ln. ft.
Insulation not on pipe, found on rail >1% AsbestosT10.A 50 ln. ft.
(1) Material Codes: T = Thermal Systems Insulation; F = Floor Covering; S = Surfacing Material (Sprayed or Troweled-on); M = Miscellaneous Material
(2) ACM Designation: >1% Asbestos = Asbestos-containing materials that contain greater than 1% asbestos and are regulated under EPA and State air quality regulations, and have requirements for worker protection under OSHA. <=1% Asbestos = Asbestos-containing materials that contain less than or equal to 1% asbestos and are NOT regulated under EPA or State air quality regulations, but have requirements for worker protection under OSHA.
11/22/2010 Page 2 of 2Printed: Cheyenne VA Medical Center
Summary of Non-Asbestos-containing Building Materials
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
100 sq. ft.Mauve, speckled linoleum None DetectedF01.A 1000 sq. ft.Floor sheeting, linoleum, looks like wood grain None DetectedF01.A 500 sq. ft.Linoleum, mosiac style None DetectedF01.B 100 sq. ft.Pale green speck sheet vinyl and adhesive None DetectedF01.B 500 sq. ft.Linoleum, white with blue, green and pink specks None DetectedF01.C 100 sq. ft.Grey with green and grey specs, sheet vinyl None DetectedF01.D 500 sq. ft.Linoleum, off-white None DetectedF01.D 500 sq. ft.Wood stain; light tan, linoleum None DetectedF01.E 500 sq. ft.Vinyl sheeting None DetectedF01.F 100 sq. ft.Floor tile and mastic, tan speck None DetectedF03.A
1000 sq. ft.Floor tile, yellow None DetectedF03.A 2000 sq. ft.12x12 floor tile, white with tan streaks B7 -- NO SAMPLE TAKEN -- Condu None DetectedF03.A 1000 sq. ft.12x12 floor tile, white with blue specks None DetectedF03.A 300 sq. ft.Tan marble 12x12 with black mastic None DetectedF03.A 200 sq. ft.12x12 floor tile and mastic None DetectedF03.B 500 sq. ft.12x12 floor tile, white with brown specks None DetectedF03.B
2000 sq. ft.12x12 tile, white with blue specks -- NO SAMPLE TAKEN -- Conducted vis None DetectedF03.B 600 sq. ft.Blue, 12x12 floor tile with mastic, accent tile throughout 2nd floor None DetectedF03.B 200 sq. ft.Floor tile, light green None DetectedF03.B
2000 sq. ft.12x12 tile, green -- NO SAMPLE TAKEN -- Conducted visual verification of None DetectedF03.C 200 sq. ft.Floor tile, dark green None DetectedF03.C 500 sq. ft.White, 12x12 floor tile with mastic None DetectedF03.C 50 sq. ft.With 2 tone brown conglomerate, 12x12 with mastic None DetectedF03.D
2000 sq. ft.12x12 floor tile, peach -- NO SAMPLE TAKEN -- Conducted visual verificat None DetectedF03.D
11/23/2010 Page 1 of 9Printed: Cheyenne VA Medical Center
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
200 sq. ft.Floor tile, purple None DetectedF03.D 2000 sq. ft.12x12 floor tile, white with grey -- NO SAMPLE TAKEN -- Conducted visua None DetectedF03.E 200 sq. ft.12x12 tile, black with white specks None DetectedF03.E 200 sq. ft.12x12 tile, light blue None DetectedF03.F 200 sq. ft.12x12 tile, dark blue None DetectedF03.G 200 sq. ft.12x12 tile, white with yellow adhesive None DetectedF03.H 200 sq. ft.12x12 tile, light brown with grey None DetectedF03.I 200 sq. ft.Floor tile, pink with grey specs None DetectedF03.J 200 sq. ft.Floor tile, grey with specs None DetectedF03.K 500 sq. ft.12x12 tile, tan with white None DetectedF03.L 200 sq. ft.Floor tile, pink None DetectedF03.M 200 sq. ft.Floor tile, tan with brown None DetectedF03.N 100 sq. ft.White, 9x9 floor tile with green and grey splatter and black mastic None DetectedF04.A 50 sq. ft.Floor adhesive None DetectedF06.A
500 sq. ft.Different camo style carpet, strip multi-color and adhesive None DetectedF07.A 500 sq. ft.Carpet adhesive brown and grey and black throughout all offices, 2nd floor None DetectedF07.A
1000 sq. ft.Carpet adhesive, brownish None DetectedF07.A 500 sq. ft.Carpet adhesive, blueish green None DetectedF07.B
1000 sq. ft.Skirt glue None DetectedF07.B 1000 sq. ft.Carpet adhesive, blue carpet None DetectedF07.C 500 sq. ft.Carpoet; dark grey and black, spots and streaks None DetectedF07.C 500 sq. ft.16x16 tile, brown with stain black None DetectedF07.D 500 sq. ft.Stair trend None DetectedF07.E 500 sq. ft.Brown, blue and tan None DetectedF07.F
11/23/2010 Page 2 of 9Printed: Cheyenne VA Medical Center
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
1000 sq. ft.Roofing tar (floor build over previous roof) None DetectedM01.A 1000 sq. ft.Roof shingles None DetectedM01.B 3000 sq. ft.Wallboard/tape/joint compound, no texture B7 None DetectedM03.A 6000 sq. ft.Wallboard and tape joint compound to texture "slight indents" None DetectedM03.A 3000 sq. ft.Drywall/tape/mud, knock down texture None DetectedM03.A 1000 sq. ft.Drywall/tape/mud, orange peel texture None DetectedM03.B 1000 sq. ft.Gypsum board None DetectedM03.B 1000 sq. ft.Wallboard/tape/joint compound, drywall, no texture (newer) None DetectedM03.B 1000 sq. ft.Gyp with JC & tape with knock down texture None DetectedM03.C 500 sq. ft.Wallboard/tape/joint compound, drywall, no texture (older) None DetectedM03.C
1000 sq. ft.White, texture, drywall None DetectedM03.C 500 sq. ft.No texture, gypsum board None DetectedM03.D 100 sq. ft.Patch material None DetectedM03.D 100 sq. ft.Gyp board with JC & texture with rough knock down None DetectedM03.E 100 sq. ft.Double gyp with JC & tape with green paint None DetectedM03.F 500 sq. ft.Drywall None DetectedM03.F 500 sq. ft.Gyp JC & tape, no paint None DetectedM03.G
3000 sq. ft.Plaster None DetectedM06.A 3000 sq. ft.Plaster, no texture B7 None DetectedM06.A 500 sq. ft.Plaster sample None DetectedM06.B 200 sq. ft.Plaster with knock down texture None DetectedM06.B 500 sq. ft.2x2 ceiling tile, small and big dots None DetectedM10.A
3000 sq. ft.Ceiling tile 2x4 dot/texture None DetectedM10.A 3000 sq. ft.Ceiling tiles, dot texture inside B7 None DetectedM10.A
11/23/2010 Page 3 of 9Printed: Cheyenne VA Medical Center
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
2000 sq. ft.Splatter dot ceiling tile, 2x4 throughout most of 2nd floor None DetectedM10.A 2000 sq. ft.2x4 ceiling tile, dot and fissure None DetectedM10.B 500 sq. ft.Ceiling tile, dot, dot, 2x4, white None DetectedM10.B
1000 sq. ft.2x2 gypsum ceiling None DetectedM10.B 2000 sq. ft.Throughout west end of east west corridor and patches in other areas, fissure None DetectedM10.B 1000 sq. ft.2x4 ceiling tile worm and dot/craters None DetectedM10.B 1000 sq. ft.2x4 ceiling tile, pinhole/heavy texture None DetectedM10.C 500 sq. ft.Ceiling tile, white, dot None DetectedM10.C
1000 sq. ft.Gypsum board ceiling tile, white None DetectedM10.C 1000 sq. ft.Texture ceiling tile None DetectedM10.C 1000 sq. ft.2x2 fissure ceiling tile None DetectedM10.D 1000 sq. ft.2x4 ceiling tile, pinhole with texture None DetectedM10.D 1000 sq. ft.2x4 dot with chicken scratch ceiling tile None DetectedM10.D 500 sq. ft.Ceiling tile, fissure coat, dot, dot None DetectedM10.D
1000 sq. ft.2x4 dot ceiling tile None DetectedM10.E 1000 sq. ft.2x4 worm hole None DetectedM10.E 1000 sq. ft.2x4 ceiling tile, thin fissure/pinholes None DetectedM10.E 500 sq. ft.Ceiling tile, dot and crater None DetectedM10.E
1000 sq. ft.2x2 drywall/gypsum ceiling tiles None DetectedM10.F 1000 sq. ft.2x2 worm hole, dot None DetectedM10.F 1000 sq. ft.2x4 ceiling tile, pinhole/crater None DetectedM10.F 500 sq. ft.Ceiling tile, chicken scratch None DetectedM10.F
1000 sq. ft.2x4 ceiling tile with galaxy design None DetectedM10.G 1000 sq. ft.2x4 ceiling tiles, slight hole with worm None DetectedM10.G
11/23/2010 Page 4 of 9Printed: Cheyenne VA Medical Center
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
500 sq. ft.Blue multibox, carpet and adhesive, 12x12, dot, adhesive glue None DetectedM10.G 1000 sq. ft.2x4 ceiling tile, dot with crater None DetectedM10.H 500 sq. ft.Ceiling tile; 2x2, dot; chicken scratch None DetectedM10.H 500 sq. ft.Ceiling tile, thinner, 2x2 None DetectedM10.I 500 sq. ft.Ceiling tiles, 2x2, white dots None DetectedM10.J 500 sq. ft.Ceiling tile, deeper None DetectedM10.K 500 sq. ft.Ceiling Tiles/Panels None DetectedM10.L 500 sq. ft.Ceiling tile, advanced pattern None DetectedM10.M 500 sq. ft.Ceiling Tile None DetectedM10.N 85 ln. ft.Red fire stop caulking None DetectedM11.A 10 ln. ft.Red, brown, fire caulking None DetectedM11.A 50 ln. ft.Black, ceiling, caulking None DetectedM11.B
100 ln. ft.Brown caulking None DetectedM11.B 100 ln. ft.Grey caulking on beams, most likely a fire proofing None DetectedM11.C 100 ln. ft.Peach caulking None DetectedM11.C 10 ln. ft.Brown caulking; ceiling None DetectedM11.C 50 ln. ft.Brown caulking on ceiling None DetectedM11.C 50 ln. ft.Dark red fire stop None DetectedM11.D 50 ln. ft.Caulking None DetectedM11.D
100 ln. ft.Black fire stop caulking None DetectedM11.E 50 ln. ft.Caulking above wood baseboard None DetectedM11.E
1000 ln. ft.6" off-white baseboard None DetectedM14.A 300 ln. ft.6" tan cove base with yellow adhesive None DetectedM14.A 300 ln. ft.Baseboard, 4" light grey None DetectedM14.A
11/23/2010 Page 5 of 9Printed: Cheyenne VA Medical Center
Table 2
QuantityHomogeneous Material Description ACM Designation(2)(1)
3000 ln. ft.Gray 4" cove base and mastic None DetectedM14.A 500 ln. ft.light brown baseboard None DetectedM14.A 300 ln. ft.Brown 6" baseboards None DetectedM14.B
3000 ln. ft.Cove base and mastic, 6" gray None DetectedM14.B 300 ln. ft.6" dark brown cove base with yellow mastic None DetectedM14.B 300 ln. ft.4" brown baseboard None DetectedM14.B 500 ln. ft.Baseboard, light brown None DetectedM14.B 300 ln. ft.4" black baseboard None DetectedM14.C 300 ln. ft.6" light grey baseboard None DetectedM14.C
3000 ln. ft.Cove base and mastic, 6" brown None DetectedM14.C 300 ln. ft.Dark grey cove base with mastic None DetectedM14.C 500 ln. ft.Light grey baseboard, 6" None DetectedM14.C 300 ln. ft.4" tan baseboard None DetectedM14.D 300 ln. ft.6" black baseboard B-4 None DetectedM14.D 300 ln. ft.6" rose colored cove base with mastic None DetectedM14.D 500 ln. ft.Gray, 6" baseboard None DetectedM14.D 500 ln.