Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24226R0033
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is seeking construction services for the comprehensive renovation of the Cardiac Catheterization Lab and Vascular Interventional Radiology Lab at Albany VA Medical Center in Albany, New York, under Solicitation 36C24226R0033 (VA Project No. 528A8-18-801). The scope of work includes general construction, mechanical systems (HVAC and hydronic), plumbing, fire protection, and electrical and fire alarm work, encompassing demolition of existing systems and installation of new components such as constant volume air terminal units, stainless steel ductwork with welded joints, plumbing fixtures, medical gas piping, and sprinkler systems. The procurement will be evaluated using five factors: Technical Capability (equally weighted with Past Performance), Past Performance on Similar Projects (equally weighted with Technical Capability), Schedule (more important than price but less important than the first two factors), Integrated Infrastructure and Ceiling Support System (pass/fail basis), and Price. Offerors must demonstrate experience renovating procedure rooms in active hospital environments with multi-phased approaches, coordination of multiple discipline subcontractors, and completion of three or more similar projects over $5 million within the past ten years. The Request for Information deadline is March 13, 2026, at 12:00 EST, and proposals are due April 3, 2026, at 12:00 EST, with a mandatory site walkthrough having occurred on February 24, 2026.

This is a 100 percent small business set-aside under NAICS code 236220 with an estimated construction magnitude between $5 million and $10 million. The bid guarantee requirement is 20 percent of the bid price or $2,000,000, whichever is less, and the contract will be awarded on a firm-fixed-price basis. All work must be completed within 790 calendar days from the issuance of the Notice to Proceed. The place of performance is located at 113 Holland Avenue, Albany, New York 12208. Offerors must be registered in SAM.gov, comply with Davis-Bacon prevailing wage requirements applicable to Albany County and surrounding New York counties, submit annual Vets4212 reports, and comply with Buy American requirements and federal security prohibitions. The project involves complex coordination across multiple disciplines with escorted site visits available for further investigation until March 6, 2026, and numerous technical clarifications have been provided through fourteen amendments addressing specific construction methodologies, material specifications, and contractor responsibilities.

Notice text

15 versions

Update #15 · Latest ·

This amendment answers the following Vendor question:

Do the contract documents provided by the VA take care of the red requirements form Phillips as long as installation is per bid documents? In other words, is this GC s responsibility though it says Customers A&E shall provide?

Response: The contract documents, as issued and stamped by the Engineer of Record, satisfies the Philips design requirement, provided installation is performed in accordance with the bid documents. This requirement is not a GC design responsibility, but falls under the A/E (EOR) scope, which has already been addressed through the signed and sealed drawings.

All other terms and conditions remain the same.

Update #14 ·

This amendment provides additional information regarding vendor question 4. From amendment A0010:

Drawing 1-ES-100 Detail 1 Calls out new Crawl Space walkway in dotted lines on the drawing. Is this New Crawl Space Contractor provided with this Bid? Can more Detail of what is expected be provided? More info will be needed for pricing If the expectation is that contractor is required to remove the spoils, we would need a route where we could get this out of the building, a place where we could load it into a truck and the time that this work could be performed spelled out.

Response: For route to remove spoils, see attached file SUBBASEMENT soil removal path and pictures of conditions of path and loading dock below. All work shall be performed outside of regular business hours, Monday-Friday 4pm-6am and week-ends.

Update #13 ·

This amendment corrects the end date of solicitation 36C24226R0033 stated in amendment A0011 from 12:00EST on 04/01/2026 to 12:00EST on 04/03/2026 as stated previously in amendment A0010.

All other terms and conditions remain the same.

Update #12 ·

This amendment answers the following vendor questions:

For this project would the government accept wall protection from Construction Specialties?

Response: Yes, it is listed as InPro.Â

I came across a note on drawing GI 004 that calls for us to reference drawing 1-HA-103. Could not find the drawing either.

Response: Amendment note for GI-004 Phase 3.5 note #8. Note #8 references 1-HA-103. It should reference drawing 1-AS-201 at coordinates 7A, and detail 5/PL-701.

Electrical Site Drawing 1-ES-002 Detail 1 states that existing utilities will be marked out by this Contractor . Are As-builts available that show existing Utilities in the area? Â Â

Response: Existing as-builts are not available. Per note at coordinates C1, the contractor is required to hand dig, field verify, and provide mark ups of all existing utilities within this area.

As all of the RFIs received have been answered, this amendment extends the close date of this solicitation from 12:00EST on 03/30/2026 to 12:00EST 04/01/2026.

All other term and conditions remain the same.

Update #11 ·

This amendment answers the following vendor questions:

Spec sections 09 67 23.60 & 09 96 59 related to Resinous Coating Systems each direct bidders that, A sample warranty letter must be included with bid package or bid may be disqualified. Please confirm that no sample warranty letter will be required within the proposal submission.

Response: This amendment adds to subfactor 1 of evaluation factor 1 the requirement that the offeror shall include the qualifications and product warranty terms (warranty letter is preferred) of the Resinous Coating System Installer as part of the subcontractor plan to be included in the offeror s proposal. This subcontractor information shall be evaluated in the same manner as the other subcontractors listed in this sub-section.

Solicitation/RFP document indicates on page 9 of 57 that the technical capability narrative shall address the three (3) sub-factors detailed herein . Sub-factor 1 Management Approach and Sub-Factor 2: Experience are detailed on pages 9 & 10 but there is no reference to a third sub-factor. Please confirm that there are only two sub-factors or clarify the third sub-factor.

Response: The statement in the technical capability narrative shall address the three (3) sub-factors detailed herein is incorrect. There are only two subfactors in the technical evaluation factor.

Is there a BOD for signage? Does the VA exclusively use InPro or another manufacturer? Signage companies are having difficulty pulling the required info from 1-AS-905 and 101400.

Response: See attached document Stratton VA Interior Finish Standards-250613 and VA Design Manual

Drawing 1-ES-100 Detail 1 Calls out new Crawl Space walkway in dotted lines on the drawing. Is this New Crawl Space Contractor provided with this Bid? Can more Detail of what is expected be provided?

Response: Yes, the contractor is responsible to remove the dirt in areas identified in drawing ES-100 (see General Note 2). A blown up section identifying the areas in question is highlighted in attachment ES-100 Clarification Spoils Earth Removal R1

More info will be needed for pricing If the expectation is that contractor is required to remove the spoils, we would need a route where we could get this out of the building, a place where we could load it into a truck and the time that this work could be performed spelled out.

Response: This information will be forthcoming in a future amendment.

Having difficulty visualizing the finished ceilings in both procedure rooms due to multiple heights. Can you provide 3-D renderings of both procedure room ceilings.

Response: See attachments IR Lab Concept View and Cath Lab Concept View pdf files.

This amendment extends the close date of this solicitation from 12:00EST on March 30th, 2026, to 12:00EST on April 3rd, 2026.

Note: There are still RFIs outstanding, the solicitation close date may change based on when all RFIs received have been answered.

All other terms and conditions remain the same.

Update #10 ·

This amendment answers the following vendor questions:

On Drawing MH-101, General Notes #1 states that all supply and return ductwork is to be welded stainless steel. Please confirm that this includes the office areas, and applies to all supply and return duct on this drawing. Do the joints need to be welded as well? If so, what will the joint connection be at the VAV/CAV boxes and the air outlets (other than the airframe outlets)? Do the hangers for this ductwork also need to be stainless steel?

Response:

All ductwork (supply and return) from AHU-17-3A that serve the CATH & VIR Labs, shall be stainless-steel with welded joints. The CAV boxes have a slip & drive cleat connection that shall be welded to complete installation. Hangers and supports for the ductwork shall be galvanized steel strap or rods per SMACNA standards.

All ductwork (supply and return) from AHU-18-3A that serve the adjacent offices & support spaces, shall be galvanized steel with gasketed flanged joints.

Although there is a spec, can't seem to find where the window shades are called out.  Will they be on all exterior windows in the area (eg, rooms B228, B229, B230, B202J, B202G, B202F, A236C and A236B)?  If so, there are no elevations of those windows, so can't really find window sizes.

Response:

Window shades are required at the following rooms. (Approximate sizes have been provide):

B228- 8 -0 Wx 6 -6 H

B229- 8 -0 Wx 6 -6 H and 4 -0 Wx 6 -6 H

B230- (2) 4 -0 Wx 6 -6 H

B202J- 8 -0 Wx 6 -6 H and 4 -0 Wx 6 -6 H

B202G- 4 -0 Wx 6 -6 H

A236B- 8 -0 Wx 6 -6 H

Final dimensions to be field verified.

Will splice plates and tension bolts be allowed for the structural steel beams? These beams are too large to get into an elevator and too heavy to boom thru a window and install. Drawing ref. 1-S-100 and 1-S-101 Please advise.

Item 3. Beams less than 9 feet in length shall not be fabricated with a splice. At Contractor s Option, Beams longer than 9 feet may be erected with a field splice. The field splice shall be fabricated with prequalified complete joint penetration (CJP) welds as shown in the attached sketch. Beams can be brought into the building using the elevator or picked through a window. The Elevator size shall be field verified but is approximately 8/2-inches wide by 95-inches long.  If picking through a window, a pick plan is required to be submitted to the VA in advance for review. Areas below the pick are required by the VA to be evacuated/empty during the lift including interior areas of the building.

As part of the Special Inspection Schedule, the welds shall be inspected by an AWS Certified weld inspector to inspect the CJP welds. Weld Inspector shall perform a Visual Inspection and Ultrasonic Test of 100 percent of the CJP Welds.

See attached file 0338 VA RFI-0002 03-19-26f

Please see below our RFIs for this project. As background on the first item, the BIM / coordination / as-built question relates to a spec-interpretation issue we have run into on a separate project and would like to clarify pre-bid here.

Coordination / BIM / File Format Clarification

The contract documents reference contractor coordination drawings, record documents, and VA CAD/BIM standards. Please clarify:

Will any native CAD, BIM/Revit, point cloud, LiDAR, scan, or similar design/reference files be made available to the awarded contractor? If yes, please specify the file type/software version.

Response: Autodesk 2025 DWG drawing package.

Are contractor coordination drawings required in AutoCAD only, or is BIM/Revit required?

Response: Refer to Section 01 33 23 Shop Drawings, Product Data, and Samples for requirements related to contractor coordination drawings and record drawings/as-builts.

Are contractor record drawings / as-builts required in AutoCAD only, or is BIM/Revit required?

Response: Refer to Section 01 33 23 Shop Drawings, Product Data, and Samples for requirements related to contractor coordination drawings and record drawings/as-builts.

Third Floor CHW Modifications / Phasing and Final Configuration

Sheets GI-004, MD-102, and MH-202 show phased third-floor chilled water modifications, including new 3" CHWS/R continuation, reconnection to an existing 3" branch, relocation of existing in-line pumps, and a bypass arrangement. The operating configuration is not clear to us. Please clarify:

Which existing areas/systems are required to remain in-service during this work?

Response: It is the responsibility of the contractor to develop the schedule and phasing of the contracted work. The major areas/systems that are permitted to be taken out-of-service are indicated on the GI sheets.

What shutdowns, outage limitations, and cutover sequence are required?

Response: It is the responsibility of the contractor to develop the schedule for shutdowns, outages, and cutover sequences of the contracted work. Contractor shall coordinate with the VA for scheduling of shutdowns, outages, and cutover sequencing.

Are the relocated pumps intended to remain in the final condition, or be removed if TAB shows they are not required?

Response: The relocated pumps are to remain in the final condition. Once the TAB is conducted, and the pumps are not required to maintain flow rates required for the A wing equipment, coordinate with the VA to utilize the by-pass loop and disconnect the electric and controls to the pumps.

Is the bypass line temporary only, or part of the permanent installation?

Response: The by-pass loop is part of the permanent installation and only to be utilized if the TAB report proves that the pumps are not required to maintain flow rates for the A wing equipment.

Contract Duration / Phasing Duration Clarification

Sheet GI-002, Construction Phasing Plan, identifies 86 Work Weeks Total and Project Duration: 287 Days, which do not match each other and differ from the solicitation duration of 790 days. Please clarify:

What is the governing contract duration for this project?

Response: The governing contract duration shall be 790 calendar days, as identified in the solicitation.

The durations noted on Sheet GI-002 (i.e., 86 Work Weeks Total and Project Duration: 287 Days ) are for planning/phasing reference only and do not define the contractual project duration.

Are the phase durations shown on GI-002 mandatory contract requirements, or for reference only?

Response: Phase durations in the lobby are mandatory contract requirements. Phase durations for the 2nd and 3rd floor are reference.

Are there any special insurance requirements? Specifications call for $1 Million Professional Insurance. Is this required?

a) I need requirements for the following:

GL limits

Auto limit

WC limit

Umbrella limit

Additional Insured & Waiver of Subrogation information and any other insurance being required.

Response: Yes, the third-party medical vacuum certification company has a current ACORD insurance certificate of at least $1M in professional liability insurance coverage as per 226200 Medical Vacuum Systems VA Master Specification from the TIL, section 3.3 Verifier Testing A. 1..

All other insurance requirements are stated in FAR clause 52.228-5 and section 4.8 of the solicitation Supplemental Insurance Requirements.

4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS

In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:

(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General Liability: $500,000.00 per occurrences.

(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.

(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.

Per MD-102, MH-202, ED101, ES101 shows existing Pumps to be relocated with note on MH-202 to keep existing Controls and extend control wire to new location.Â

Question: Do you know the location of the existing controller for the two pumps that are being relocated?

Response: The pump controller is located in A312 and shall be existing to remain.

Question: How many wires/points for these Pumps. Start/Stop/Status/Speed?

Response: The pump points are as follows:

Inputs:

P1 CHW pump status

P2 HW pump status

Outputs:

P1 CHW pump s/s

P2 HW pump s/s

Question: Are these Pumps currently Controlled by Trane Controls or Automated Logic?

Response: The pumps are controlled by Trane controls system.

Note: There are still RFIs outstanding, any changes to the solicitation close date will be issued once all outstanding RFIs have been answered. No further RFIs or requests for site visits shall be accepted.

All other terms and conditions remain the same.

Update #9 ·

This amendment changes the close date of the solicitation from 03/24/2026 at 12:00 EST to 03/30/2026 at 12:00EST.

All other terms and conditions remain the same.

Update #8 ·

This amendment provided a corrected version of the EXHIBIT C Past Performance Questionnaire attached to amendment A0004 posted on 03/05/2026.

All other terms and conditions remain the same.

Update #7 ·

This amendment corrects the new end date for this solicitation stated in amendment A0005 section C. The correct end date is 03/24/2026, not 03/124/2026.

All other terms and conditions remain the same.

Update #6 ·

This amendment answers the following vendor questions:

Is lead lining required for the concrete floor in the space? Specifications call for installation of floor lead. See Physicists report Please advise.

Answer: The installation of lead lining is not necessary as the existing concrete is thick enough. If flooring concrete/topcoat removal is required during construction, the contractor shall return the impacted area back to its original specifications.

Who is responsible to remove the office furniture that is currently in the construction space?

Answer: The VA shall be responsible for the removal of office furniture and other misc. items stored in the construction area.

For the above ceiling structural steel install in the 1st floor lobby: Who will be responsible to rework the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed?

Answers: Rework of the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed shall be the responsibility of the contractor

Will construction fence need to be installed around the contractor laydown staging area?

Answer: Yes

Will construction fence need to be installed around the exterior area of the scaffolding entrance

Answer: Yes

This amendment changes the RFI deadline date listed in block 10 of the SF1442 from 03/05/2026 at 12:00EST to 03/13/2026 at 12:00EST.

This amendment changes the close date of this solicitation listed in blocks 10 and 13a of the SF1442 from 03/17/2026 at 12:00EST to 03/124/2026 at 12:00EST.

All other terms and conditions remain the same.

Update #5 ·

This amendment answers the following vendor questions:

As part of the proposal for this project, the solicitation mentions Exhibits B & C on page 12. Can you please provide copies of any Exhibits that are required for this solicitation?

Answer: Both documents are attached to amendment.

FAR Clause 52.228-1 is included in the solicitation by reference, part (c) has inserts that are required to be filled out by the Contracting Officer. Can you provide that information.

Answer:

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $2,000,000.00, whichever is less.

What is the expected date that the contract for this project will be executed? The new NYS Prevailing wage laws take effect June 16th, 2026, and will affect pricing and contracts for this project. Please advise.

Answer: The intent is to have this procurement awarded before June 16th, 2026. Offerors shall prepare their proposal in accordance with the current wage determination. If this contract is awarded after June 16th, 2026, this will be addressed through a contract modification after award.

What is the Bid Bond percentage required for this project?

Answer: See response to question 2.

Responses to additional questions received shall be addressed in a future amendment.

This amendment removes the following clauses from the solicitation:

52.211-12 Liquidated Damages Construction (SEPT 2000)

52.211-13 Time Extensions (SEPT 2000)

All other terms and conditions remain the same.

Update #4 ·

This amendment posts the sign in sheet for the walkthrough that occurred on Tuesday, February 24th, 2026. See attached document.

This amendment answers the following questions stated at the walkthrough:

Can the Offeror change sub-contractors listed in the Offeror s proposal without Government approval?

Answer: Government consent is required to change subcontractors that are provided in the Offeror's proposal in response to Evaluation Factor 1, Sub-factor 1: Management Approach.

If an Offeror s proposal receives an unacceptable rating in Evaluation Factor 4: Integrated infrastructure and ceiling support(airframe) system, but is otherwise found technically acceptable, is the proposal still considered technically acceptable?

Anwer: No, if an Offeror s proposal receives an unacceptable rating in Evaluation Factor 4: Integrated infrastructure and ceiling support(airframe) system it is automatically considered not technically acceptable.

This amendment adds the following information to the solicitation: Offeror s shall be allowed to arrange escorted individual site visits to the project site for further site investigation. Escorts are available with at least one day s written notice via email, Monday to Friday between 13:00EST and 14:00EST until Friday, March 6th, 2026. To arrange a site visit, contact John Hogan at John.Hogan3@va.gov.

All other terms and conditions remain the same.

Update #3 ·

This amendment removes the following attached files from solicitation 36C24226R0033:

7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2

Stratton VAMC Cath Lab 528A8-18-801- Volume One 100 CD Specifications

Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications

GI-004 ADDENDUM 1

ES-100A ADDENDUM 1

ES-401 ADDENDUM 1

ES-402 ADDENDUM 1

This amendment adds updated drawings issued 12/05/2025 and specifications dated 02/11/2026. The following files are added to solicitation 36C24226R0033:

2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications

2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications

12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS

All other terms and conditions remain the same.

Update #2 ·

This amendment changes the walkthrough date listed in block 10 of the SF1442 from 02/18/2026 at 12:00EST to 02/24/2026 at 12:00EST. The meeting location does not change.

2. This amendment changes the RFI deadline date listed in block 10 of the SF1442 from 02/27/2026 at 12:00EST to 03/05/2026 at 12:00EST.

This amendment changes the close date of this solicitation listed in blocks 10 and 13a of the SF1442 from 03/10/2026 at 12:00EST to 03/17/2026 at 12:00EST.

All other terms and conditions remain the same.

Update #1 ·

SCOPE OF WORK

VA PROJECT NO. 528A8-18-801

RENOVATION FOR CARDIAC CATH AND VIR

This Scope of work is for construction services for the completion of project 528A8-18-801: Renovation for Cardiac Cath Lab and Vascular Interventional Radiology Lab located at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. All work shall be completed within 790 calendar days from issuance of the Notice To Proceed.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION:

Work includes all labor, material, equipment and supervision to perform:

1. The required general construction work on this project including, but not limited to, demolition of existing architectural items, new walls, new floor, new ceilings, new finishes, temporary facilities and any other addition/demolition alterations necessary for a complete and operable system.

2. The required mechanical construction work on this project including, but not limited to, demolition of existing HVAC and hydronic systems, new constant volume air terminal units, new ductwork, new hydronic piping, new controls, new pressure monitoring equipment and any other addition/demolition alterations necessary for a complete and operable system.

3. The required plumbing construction work on this project including, but not limited to, demolition of existing plumbing fixtures, demolition of domestic/sanitary/venting/medical gas/RO piping, new plumbing fixtures and any other addition/demolition alterations necessary for a complete and operable system.

4. The required fire protection construction work on this project, including but not limited to, demolition or relocation of existing sprinkler heads, new sprinkler heads, new fire protection piping and any other addition/demolition alterations necessary for a complete and operable system.

5. The required electrical and fire alarm construction work on this project including, but not limited to, demolition of existing power and lighting systems, new power circuits, new lighting fixtures, relocation of existing fire alarm equipment, new fire alarm devices, installation/removal of temporary heat detectors in the working areas, and any other addition/demolition alterations necessary for a complete and operable system.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Detailed Drawings and Specifications have been attached to this solicitation.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

Files

File Type Posted
36C24226R0033 0014.docx DOCX document
36C24226R0033 0013.docx DOCX document
SUBBASEMENT soil removal path.pdf PDF
36C24226R0033 0012.docx DOCX document
36C24226R0033 0011.docx DOCX document
36C24226R0033 0010.docx DOCX document
Cath Lab Concept View.pdf PDF
Stratton VA Interior Finish Standards-250613.pdf PDF
ES-100 clarification spoils earth removal R1.pdf PDF
VA Design Manual.pdf PDF
IR Lab Concept View.pdf PDF
0338 VA RFI-002 03-19-26f.pdf PDF
36C24226R0033 0009.docx DOCX document
36C24226R0033 0008.docx DOCX document
36C24226R0033 0007.docx DOCX document
EXHIBIT C - Past Performance Questionnaire V1.docx DOCX document
36C24226R0033 0006.docx DOCX document
36C24226R0033 0005.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
36C24226R0033 0004.docx DOCX document
36C24226R0033 0003.docx DOCX document
Walkthrough sign in sheet.pdf PDF
12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS.pdf PDF
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications.pdf PDF
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications.pdf PDF
36C24226R0033 0002.docx DOCX document
36C24226R0033 0001.docx DOCX document
GI-004 ADDENDUM 1.pdf PDF
ES-401 ADDENDUM 1.pdf PDF
WD Albany.docx DOCX document
36C24226R0033_1.docx DOCX document
ES-402 ADDENDUM 1.pdf PDF
7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2.pdf PDF
ES-100A ADDENDUM 1.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 CD Specifications.pdf PDF
Show all 37

Notice history

Notice Type Posted
Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR Award Award Notice
This notice Latest solicitation Solicitation
Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DA--528A8-22-814 Consolidate Primary Care Reception Albany VA Medical Center Albany, New York 12208, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC NAICS 236220 Veterans Integrated Service Network 2 No set-aside
J065--Medical Gas Prevenative Maintenance and Service Albany VAMC Department of Veteran Affairs Albany Vamc Albany, New York 12208, United States · NAICS 811210 Veterans Integrated Service Network 2 No set-aside
Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Montrose, New York 10548, United States · NAICS 238210 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM Buffalo, New York 14215, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors