GI-004 ADDENDUM 1.pdf
PDF 637 KB Posted
- Solicitation number
- 36C24226R0033
About this file
This is a set of construction documents for a renovation project at Stratton VA Medical Center, a U.S. Department of Veterans Affairs facility. The project, numbered 20-373, involves designing and renovating the Interventional Radiology-Cardiac Catheterization Lab (IR-Cardiac Cath Lab) and associated areas at the medical center located in Latham, New York. The documents are prepared at 100% construction document phase by the joint architecture/engineering team of Hyman Hayes Engineering LLP and FE LLP, with a project director approval date of July 9, 2025.
The construction documents include Infection Control Risk Assessment (ICRA) Construction Plans for multiple phases across both the first and third floors, covering Phase 3.4 through Phase 3.9. Work scope includes electrical conduit installation in the cath lab, sanitary piping, 60-pound steam systems, chilled water systems (CHW) for operating rooms in two parts, and specifications for fully sprinklered areas. The plans contain detailed notes on off-hours work requirements, keyed construction details, and coordination notes for the various mechanical, electrical, and plumbing systems required for the IR-Cardiac Catheterization Lab renovation. The document references specific building layout maps and floor plans with numbered notations indicating construction sequencing and system locations.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFF-HOURS WORK
SW3
A101
A135c
100d
100e
100b
100a
100f
100h
100f
138-1
IT
A137
A136 SW3
A101
A135c
100d
100e
100b
100a
100f
100h
100f
138-1
IT
A137 A136
SW4
SW3B101
B101
B103 B106
B104
B102
100e
100b
100a
100f
100h
100f
138-1
1 2 3 4 5
IT
100c
COFFEE
HYMAN
HAYES
ASSOCIATES
800 TROY-SCHENECTADY
ROAD, STE 103
LATHAM, NY 12110
(518) 452-3470 www.hymanhayes.com
ENGINEERING LLP
FE PROJECT NO: 20-373
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
6/
/2
:3 9:
P
M
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
528A8-18-801
Project Director
07-09-2025 CC / JDFRevisions: Date:
STRATTON VA MEDICAL CENTER
DESIGN RENOVATE FOR IR-CARDIAC CATH100% CONSTRUCTION DOCUMENTS
SRB
ICRA CONSTRUCTION PLAN3
THIRD FLOOR PHASE 3.5 -
ICRA CONSTRUCTION PLAN4
THIRD FLOOR PHASE 3.6 -
ICRA CONSTRUCTION PLAN5
THIRD FLOOR PHASE 3.7 -
PHASE 3.7 - THIRD FLOOR HHW CONNECTION NOTES:
ICRA CONSTRUCTION PLAN6
THIRD FLOOR PHASE 3.8 -
FIRST FLOOR PHASE 3.3 ICRA CONSTRUCTION PLAN1 FIRST FLOOR PHASE 3.4 ICRA CONSTRUCTION PLAN2
PHASE 3.4 - FIRST FLOOR CATH LAB ELECTRICAL CONDUIT NOTES:
KEYED NOTES:
OFF-HOURS WORK
NOTE:
PHASE 3.3 - FIRST FLOOR CATH LAB
SUPPORT STEEL & ELECTRICAL NOTES:
ICRA CONSTRUCTION PLAN7
FIRST FLOOR PHASE 3.9 -
PHASE 3.9 - FIRST FLOOR SANITARY PIPING NOTES:
PHASE 3.8 - THIRD FLOOR 60#
STEAM NOTES:
PHASE 3.6 (A&B) - THIRD FLOOR
O.R. CHW - PART 2 NOTES:
PHASE 3.5 - THIRD FLOOR
O.R. CHW - PART 1 NOTES:
AutoCAD SHX Text D320a
AutoCAD SHX Text 309c
AutoCAD SHX Text D303a
AutoCAD SHX Text D303
AutoCAD SHX Text
AutoCAD SHX Text 310a
AutoCAD SHX Text 309b
AutoCAD SHX Text 309a
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PENETRATE CHASE TO CREATE NEW ROUTE FOR OPERATING ROOM CHW TO MECHANICAL ROOM A330
AutoCAD SHX Text A333
AutoCAD SHX Text A332
AutoCAD SHX Text A328
AutoCAD SHX Text A304b
AutoCAD SHX Text A304a
AutoCAD SHX Text A303
AutoCAD SHX Text A302
AutoCAD SHX Text 310a
AutoCAD SHX Text 301a
AutoCAD SHX Text
SW3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text A330
AutoCAD SHX Text A333
AutoCAD SHX Text A332
AutoCAD SHX Text A328
AutoCAD SHX Text A304b
AutoCAD SHX Text A304a
AutoCAD SHX Text A303
AutoCAD SHX Text A302
AutoCAD SHX Text 301a
AutoCAD SHX Text
SW3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PART 1
AutoCAD SHX Text
PART 2
AutoCAD SHX Text A333
AutoCAD SHX Text A332
AutoCAD SHX Text A328
AutoCAD SHX Text A327
AutoCAD SHX Text A308
AutoCAD SHX Text A306
AutoCAD SHX Text A305
AutoCAD SHX Text A304b
AutoCAD SHX Text A304a
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ACT
AutoCAD SHX Text
GWB
AutoCAD SHX Text
PROPOSED STEAM PIPING PATH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DASHED AREA ICRA NEEDED FOR CEILING TILE REPLACEMENT. WEEKEND WORK ONLY.
AutoCAD SHX Text
AutoCAD SHX Text
JOHN D. FELLENZER, P.E.
AutoCAD SHX Text
NY PROFESSIONAL ENGINEER NO. 069373-1
AutoCAD SHX Text 113 Holland Ave, Albany, NY 12208
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text
ICRA PLAN - PHASE 3.3 THRU PHASE 3.8
AutoCAD SHX Text
GI-004
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. INSTALL ZIPWALL ICRA BARRIERS AS SHOWN ON PLAN. SEE INSTALL ZIPWALL ICRA BARRIERS AS SHOWN ON PLAN. SEE 1-MH-202 FOR CHW PIPE ROUTING. 2. STAIRWELL 10 (SW10) SHALL BE BLOCKED FROM ANY EGRESS STAIRWELL 10 (SW10) SHALL BE BLOCKED FROM ANY EGRESS DURING THIS CONSTRUCTION PORTION, SEE KEYED NOTE FOR LOCATIONS. 3. AN EXHAUST FAN WITH HEPA FILTER SHALL BE USED TO EXHAUST AN EXHAUST FAN WITH HEPA FILTER SHALL BE USED TO EXHAUST CONCRETE DUST FROM THE STAIRWELL. SEE DETAIL 4 AND DISCHARGE AIR OUT THE WINDOW IN STAIRWELL 10. 4. GC TO INSTALL SCAFFOLDING WILL BE REQUIRED WITHIN THE GC TO INSTALL SCAFFOLDING WILL BE REQUIRED WITHIN THE STAIRWELL TO PENETRATE THE CHASE WITHIN THE STAIRWELL CENTER COLUMN. 5. GC TO CREATE A 24”H BY 30”W OPENING FOR CHW PIPING GC TO CREATE A 24”H BY 30”W OPENING FOR CHW PIPING H BY 30”W OPENING FOR CHW PIPING W OPENING FOR CHW PIPING ACCESS. 6. GC TO PROVIDE GATES WITH CONSTRUCTION SIGNS AT THE 2ND & GC TO PROVIDE GATES WITH CONSTRUCTION SIGNS AT THE 2ND & 4TH FLOOR STAIR WELLS DURING CHASE PENETRATION. 7. CONTRACTOR TO RUN NEW CHW PIPING AT DECK LEVEL AND ABOVE CONTRACTOR TO RUN NEW CHW PIPING AT DECK LEVEL AND ABOVE THE CEILING, TO THE END OF THE ICRA BARRIER IN A-WING, PIPING SHALL HAVE NEW BALL VALVES INSTALLED, AND THE END CAPPED. 8. CONTRACTOR TO CLOSE CHASE OPENING, AND FOLLOW CONTRACTOR TO CLOSE CHASE OPENING, AND FOLLOW ARCHITECTURE NOTES ON 1-HA-103 FOR PATCHING THE CHASE.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. CONTRACTOR TO INSTALL ICRA BARRIERS 1/GI-005 AS CONTRACTOR TO INSTALL ICRA BARRIERS 1/GI-005 AS SHOWN ON PLAN. FOLLOW PIPING ROUTING SHOWN ON 1-MH-202. 2. INSTALL AN EXHAUST FAN WITH HEPA FILTER IN THE NEW INSTALL AN EXHAUST FAN WITH HEPA FILTER IN THE NEW MECHANICAL ROOM, A330. 3. CONTINUE THE CHW PIPING FROM THE ELEVATOR TO THE CONTINUE THE CHW PIPING FROM THE ELEVATOR TO THE ENTRANCE OF A330. INSTALL NEW BALL VALVES AT THAT ENTRACE. 4. CONTRACTOR TO FOLLOW 1-MD-102, AND 1-MH-102 FOR CONTRACTOR TO FOLLOW 1-MD-102, AND 1-MH-102 FOR PIPING PLAN.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. GC TO INFORM COR A MINIMUM OF 2 WEEKS PRIOR TO GC TO INFORM COR A MINIMUM OF 2 WEEKS PRIOR TO BEGINNING THIS PHASE. 2. GC TO INSTALL ZIP WALL ICRA BARRIERS AS SHOWN WITH GC TO INSTALL ZIP WALL ICRA BARRIERS AS SHOWN WITH ZIPPER ENTRANCES, AND PROVIDE HEPA FILTERED EXHAUST, WITH MANOMETER AS SHOWN ON PLANS. 3. GC TO CLOSE OFF STAIRWELL 3 (SW3), ROOM A333, STORAGE GC TO CLOSE OFF STAIRWELL 3 (SW3), ROOM A333, STORAGE ROOM A332, WITH TEMPORARY ICRA BARRIERS-DETAIL 1 ON GI-004. 4. FOLLOWING THE PIPING PLAN ON 1-MH-202, THE MECHANICAL FOLLOWING THE PIPING PLAN ON 1-MH-202, THE MECHANICAL CONTRACTOR SHALL CONNECT TO EXISTING HHW FROM THE A-WING UTILITY CHASE AT DECK LEVEL, TO THE ENTRANCE OF NEW MECHANICAL ROOM, FOR FUTURE CONNECTION TO EQUIPMENT LOCATED WITHIN.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. GC TO INFORM COR A MINIMUM OF 2 GC TO INFORM COR A MINIMUM OF 2 WEEKS PRIOR TO BEGINNING THIS PHASE. ALL WORK SHALL BE OFF HOURS AND WEEKENDS. 2. GC TO INSTALL TEMPORARY ICRA GC TO INSTALL TEMPORARY ICRA BARRIERS WHEN THE EXPOSED CEILING WILL BE LEFT OPEN DURING NORMAL BUSINESS HOURS, AND PROVIDE HEPA FILTERED EXHAUST, WITH MANOMETER AS SHOWN ON PLANS. 3. REMOVE THE HARD CEILINGS REMOVE THE HARD CEILINGS FOLLOWING THE PROPOSED STEAM PIPE RUN AS SEEN ON 1-MH-202 WITHIN A327, AND A328, FOR THE STEAM PIPING ROUTE TO A330. 4. LOCATE AND PENETRATE THE STEAM LOCATE AND PENETRATE THE STEAM CHASE AND CONNECT PIPING AS SHOWN ON 1-MH-202. 5. REPAIR/REPLACE HARD CEILING REPAIR/REPLACE HARD CEILING WHERE REMOVED. RETURN SPACE BACK TO ORIGINAL CONDITION. 6. SEAL STEAM CHASE OPENING WITH SEAL STEAM CHASE OPENING WITH FIRE PROOFING CAULK & CONCRETE.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. COORDINATE ICRA BARRIERS AND POLICE COORDINATE ICRA BARRIERS AND POLICE STATION ROOM CLOSURES WITH POLICE DEPARTMENT. 2. REMOVE ALL ACT WITHIN THE ICRA SPACE AND REMOVE ALL ACT WITHIN THE ICRA SPACE AND REINSTALL AT END OF SHIFT. 3. HALLWAY TO 100D, ROOMS 100A, 100E, 100H, HALLWAY TO 100D, ROOMS 100A, 100E, 100H, AND 100F SHALL BE INCLUDED IN THE CONSTRUCTION AREAS FOR THE INSTALLATION OF THE ELECTRICAL CONDUITS FOR THE CATH TABLE, TO THE COMPONENT ROOM. TEMPORARY ICRA BARRIERS, DETAIL 1 ON GI-004, SHALL BE USED. 4. INSTALL THE CATH LAB TABLE SUPPORT BEAM INSTALL THE CATH LAB TABLE SUPPORT BEAM AS DETAILED ON 1-S-100, AND FOLLOW THE FRAMING DETAILS ON 1-S-500. 5. WHEN HOT-WORK IS REQUIRED, A HOT WORK WHEN HOT-WORK IS REQUIRED, A HOT WORK PERMIT SHALL BE USED, WITH A SAFETY FIRE WATCH ON-STANDBY. 6. ELECTRICAL CONTRACTOR TO DRILL CORE HOLES ELECTRICAL CONTRACTOR TO DRILL CORE HOLES REQUIRED FOR ROUTING FROM THE CATH TABLE TO THE CATH COMPONENT ROOM. 7. INSTALL CONDUIT FROM THE COMPONENT ROOM INSTALL CONDUIT FROM THE COMPONENT ROOM TO THE CATH TABLE FOR PHASE 3.4 CONTINUATION ELECTRICAL.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. ICRA BARRIERS SHALL BE INSTALLED AS SHOWN. ICRA BARRIERS SHALL BE INSTALLED AS SHOWN. 2. ELECTRICAL CONTRACTOR TO INSTALL CONDUIT WITHIN THE LOBBY CEILING FOR ELECTRICAL CONTRACTOR TO INSTALL CONDUIT WITHIN THE LOBBY CEILING FOR CONNECTIONS TO/FROM THE CONTROL ROOM, COMPONENT ROOM, AND TO THE CATH TABLE. FOLLOW THE CONDUIT ROUTING AND WIRING REQUIRED ON ELECTRICAL PLANS.
AutoCAD SHX Text USE EDGE GUARD, STARC OR EQUIVALENT, TEMPORARY ICRA BARRIER WALL, SEE DETAILS ON GI-005. ICRA WALLS TO BE INSTALLED AT THE BEGINNING OF EACH WORK DAY AND REMOVED AT THE END OF THE WORK DAY. PROVIDE CONSTRUCTION STICKY MATS PROVIDE AIR SCRUBBER WITH HEPA FILTER UTILIZING THE EXISTING WINDOW TO EXHAUST TO THE EXTERIOR MANOMETER LOCATION ENSURE A 5' HALLWAY EGRESS, U.O.N. ICRA BARRIER, SEE DETAILS 2 AND 3 ON GI-005 SELF CLOSING DOORS WITH VA BEST 7-PIN KEYED LOCKSET PROVIDE AIR SCRUBBER WITH HEPA FILTER AND CONNECT TO EXHAUST DUCT (24”x13”) IN A-WING CHASE. x13”) IN A-WING CHASE. ) IN A-WING CHASE. ON THE 2nd FLOOR, THE 2" CONCRETE TOPPING SHALL BE REMOVED WITHIN nd FLOOR, THE 2" CONCRETE TOPPING SHALL BE REMOVED WITHIN FLOOR, THE 2" CONCRETE TOPPING SHALL BE REMOVED WITHIN THE ENCLOSED ICRA SPACE, STEM-B HALLWAY, B-WING HALLWAY, AND THE TEMPORARY CLEAN STORAGE ROOM ON THE SECOND FLOOR. CONTRACTOR SHALL COVER ONCE FINISHED TO PROTECT FOR FUTURE PHASING. CONTRACTOR TO INSTALL SCAFFOLDING AND INSTALL ICRA ACCESS DOOR TO REMOVE DEMOLITION MATERIALS. THE FINISH FLOORING OF A328 MUST BE FLUSH WITH 3A STEM'S CORRIDOR FLOORING. NO FLOORING DEMOLITION OF 3A STEM CORRIDOR IS TO OCCUR. CONTRACTOR SHALL PROVIDE A CALIBRATED PARTICULATE MATTER (PM) METER AT THE DISCHARGE OF ALL PORTABLE HEPA AIR SCRUBBERS USED DURING CONSTRUCTION ACTIVITIES. THE METER SHALL MEASURE PM0.3, PM0.5 AND PM1.0 CONCENTRATIONS IN REAL-TIME AND VERIFY DISCHARGE AIR CLEANLINESS IN ACCORDANCE WITH HEPA FILTRATION STANDARDS. READINGS SHALL BE LOGGED AND MADE AVAILABLE UPON REQUEST BY THE VA COR OR INFECTION CONTROL REPRESENTATIVE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(NOT ALL KEYNOTES APPEAR ON SAME SHEET)
AutoCAD SHX Text ALL WORK PERFORMED IN THE LOBBY SHALL BE CONDUCTED OFF-HOURS ON WEEKDAYS, WITH ICRA BARRIERS INSTALLED AT THE START OF EACH SHIFT. WEEKDAYS: BARRIERS SHALL BE FULLY REMOVED BY 4:00 AM EACH MORNING. WEEKENDS: BARRIERS MAY REMAIN IN PLACE BUT MUST BE REMOVED BY 4:00 AM ON MONDAY TO RESUME NORMAL OPERATIONS.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
1. ALL WORK TO BE COMPLETED OFF-HOURS AND ALL WORK TO BE COMPLETED OFF-HOURS AND WEEKEND ONLY. 2. PLUMBING CONTRACTOR TO INSTALL INCRA PLUMBING CONTRACTOR TO INSTALL INCRA BARRIER AS SHOWN ON PLAN, SEE DETAIL 1/GI-005. 3. SANITARY PIPING TO BE CONNECTED FOLLOWING SANITARY PIPING TO BE CONNECTED FOLLOWING PLAN ON 1-PL-201. 4. CARE SHOULD BE TAKEN TO NOT DAMAGE ANY CARE SHOULD BE TAKEN TO NOT DAMAGE ANY ACT TILES REMOVED AND REINSTALLED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PATIENT MONITORING SYSTEM
AutoCAD SHX Text 8/5/25
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| GI-004 |
File details come from the government source that posted it. Updated .