36C24226R0033 0005.docx

DOCX document 29 KB Posted

Attached to
Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR
Solicitation number
36C24226R0033
Issued by

About this file

This is Amendment 0005 to Solicitation 36C24226R0033 for construction services related to Project 528A8-18-801: Renovation for Cardiac Cath Lab and Vascular Interventional Radiology Lab at the Albany VA Medical Center in Albany, New York. The amendment, issued by the Department of Veterans Affairs Network Contracting Office (NCO) in Buffalo, New York on March 6, 2026, extends the offer receipt deadline to March 24, 2026 at 12:00 EDT and the Requests for Information (RFI) deadline to March 13, 2026 at 12:00 EST.

The amendment addresses five vendor questions and clarifies key construction responsibilities. The VA will handle removal of existing office furniture and miscellaneous items from the construction area, while the contractor is responsible for reworking existing ductwork, piping, sprinkler systems, and electrical conduit to accommodate structural steel installation in the first-floor lobby. Lead lining is not required for the concrete floor as the existing concrete is sufficiently thick; however, if flooring removal occurs during construction, the contractor must restore the impacted area to original specifications. The contractor must install construction fencing around both the laydown staging area and the exterior area of the scaffolding entrance. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

File Type Posted
36C24226R0033 0014.docx DOCX document
SUBBASEMENT soil removal path.pdf PDF
36C24226R0033 0013.docx DOCX document
36C24226R0033 0012.docx DOCX document
36C24226R0033 0011.docx DOCX document
Cath Lab Concept View.pdf PDF
Stratton VA Interior Finish Standards-250613.pdf PDF
ES-100 clarification spoils earth removal R1.pdf PDF
IR Lab Concept View.pdf PDF
VA Design Manual.pdf PDF
36C24226R0033 0010.docx DOCX document
36C24226R0033 0009.docx DOCX document
0338 VA RFI-002 03-19-26f.pdf PDF
36C24226R0033 0008.docx DOCX document
EXHIBIT C - Past Performance Questionnaire V1.docx DOCX document
36C24226R0033 0007.docx DOCX document
36C24226R0033 0006.docx DOCX document
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
36C24226R0033 0004.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
Walkthrough sign in sheet.pdf PDF
36C24226R0033 0003.docx DOCX document
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications.pdf PDF
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications.pdf PDF
36C24226R0033 0002.docx DOCX document
12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS.pdf PDF
36C24226R0033 0001.docx DOCX document
WD Albany.docx DOCX document
36C24226R0033_1.docx DOCX document
ES-100A ADDENDUM 1.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 CD Specifications.pdf PDF
ES-402 ADDENDUM 1.pdf PDF
7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2.pdf PDF
GI-004 ADDENDUM 1.pdf PDF
ES-401 ADDENDUM 1.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-06-2026 528A8-18-801 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 To all Offerors/Bidders

36C24226R0033 02-06-2026

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-24-2026 12:00 EDT X This amendment answers vendor questions and extends the close date of this solicitation . For details see attached document.

Michael Spivack A. This amendment answers the following vendor questions:

1. Is lead lining required for the concrete floor in the space? Specifications call for installation of floor lead. “See Physicists report” Please advise.

Answer: The installation of lead lining is not necessary as the existing concrete is thick enough. If flooring concrete/topcoat removal is required during construction, the contractor shall return the impacted area back to its original specifications.

1. Who is responsible to remove the office furniture that is currently in the construction space?

Answer: The VA shall be responsible for the removal of office furniture and other misc. items stored in the construction area.

1. For the above ceiling structural steel install in the 1st floor lobby: Who will be responsible to rework the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed?

Answer: Rework of the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed shall be the responsibility of the contractor

1. Will construction fence need to be installed around the contractor laydown staging area?

Answer: Yes

1. Will construction fence need to be installed around the exterior area of the scaffolding entrance

Answer: Yes

B. This amendment changes the RFI deadline date listed in block 10 of the SF1442 from 03/05/2026 at 12:00EST to 03/13/2026 at 12:00EST.

C. This amendment changes the close date of this solicitation listed in blocks 10 and 13a of the SF1442 from 03/17/2026 at 12:00EST to 03/124/2026 at 12:00EST.

All other terms and conditions remain the same.