This is Amendment 0004 to Solicitation 36C24226R0033 for construction services related to VA Project 528A8-18-801, a renovation project for the Cardiac Catheterization Lab and Vascular Interventional Radiology Lab at Albany VA Medical Center in Albany, New York. The amendment, issued March 5, 2026, by the Department of Veterans Affairs Network Contracting Office in Buffalo, New York, answers vendor questions and removes certain contract clauses. Key responses include: the bid guarantee requirement is 20 percent of the bid price or $2,000,000.00, whichever is less; procurement award is intended before June 16, 2026, with offerors preparing proposals under current wage determinations; and Exhibits B and C (Sample Transmittal Letter for Past Performance Evaluation Questionnaire and Past Performance Questionnaire) are attached to the amendment. The amendment removes FAR Clauses 52.211-12 (Liquidated Damages - Construction) and 52.211-13 (Time Extensions) from the solicitation.

All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment prior to the deadline specified in the solicitation or submit acknowledgment with their offer submission. The construction project involves general, mechanical, plumbing, fire protection, and electrical work to be completed within 790 calendar days from issuance of the Notice to Proceed.

View the file

Other files

File Type Posted
36C24226R0033 0014.docx DOCX document
SUBBASEMENT soil removal path.pdf PDF
36C24226R0033 0013.docx DOCX document
36C24226R0033 0012.docx DOCX document
36C24226R0033 0011.docx DOCX document
VA Design Manual.pdf PDF
36C24226R0033 0010.docx DOCX document
Cath Lab Concept View.pdf PDF
Stratton VA Interior Finish Standards-250613.pdf PDF
ES-100 clarification spoils earth removal R1.pdf PDF
IR Lab Concept View.pdf PDF
36C24226R0033 0009.docx DOCX document
0338 VA RFI-002 03-19-26f.pdf PDF
36C24226R0033 0008.docx DOCX document
36C24226R0033 0007.docx DOCX document
EXHIBIT C - Past Performance Questionnaire V1.docx DOCX document
36C24226R0033 0006.docx DOCX document
36C24226R0033 0005.docx DOCX document
EXHIBIT C - Past Performance Questionnaire.docx DOCX document
EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
36C24226R0033 0003.docx DOCX document
Walkthrough sign in sheet.pdf PDF
12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS.pdf PDF
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications.pdf PDF
2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications.pdf PDF
36C24226R0033 0002.docx DOCX document
36C24226R0033 0001.docx DOCX document
ES-402 ADDENDUM 1.pdf PDF
7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2.pdf PDF
GI-004 ADDENDUM 1.pdf PDF
ES-401 ADDENDUM 1.pdf PDF
WD Albany.docx DOCX document
36C24226R0033_1.docx DOCX document
ES-100A ADDENDUM 1.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications.pdf PDF
Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 CD Specifications.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-05-2026 528A8-18-801 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 36C528 Department of Veterans Affairs Network Contracting Office (NCO) 2 3495 Bailey Avenue Building 3, 2nd floor Buffalo NY 14215 To all Offerors/Bidders

36C24226R0033 02-06-2026

X X X X This amendment answers the following vendor questions below.

Michael Spivack A) This amendment answers the following vendor questions:

1. As part of the proposal for this project, the solicitation mentions Exhibits B & C on page 12. Can you please provide copies of any Exhibits that are required for this solicitation?

Answer: Both documents are attached to amendment.

2. FAR Clause 52.228-1 is included in the solicitation by reference, part (c) has inserts that are required to be filled out by the Contracting Officer. Can you provide that information.

Answer:

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $2,000,000.00, whichever is less.

3. What is the expected date that the contract for this project will be executed? The new NYS Prevailing wage laws take effect June 16th, 2026, and will affect pricing and contracts for this project. Please advise.

Answer: The intent is to have this procurement awarded before June 16th, 2026. Offerors shall prepare their proposal in accordance with the current wage determination. If this contract is awarded after June 16th, 2026, this will be addressed through a contract modification after award.

4. What is the Bid Bond percentage required for this project?

Answer: See response to question 2.

Responses to additional questions received shall be addressed in a future amendment.

B) This amendment removes the following clauses from the solicitation:

52.211-12Liquidated Damages – Construction (SEPT 2000)
52.211-13Time Extensions (SEPT 2000)

All other terms and conditions remain the same.

See attached document: EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.

See attached document: EXHIBIT C - Past Performance Questionnaire.