Y1DA--521-23-121 | SPS Renovation Phase 2
Closed Solicitation Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- 36C24725R0079
- Agency
-
Veterans Integrated Service Network 7
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Birmingham, Alabama 35294, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7 is seeking contractors to complete the SPS (Sterile Processing Service) Renovation Phase 2 project at the Birmingham VA Medical Center in Alabama. This comprehensive renovation involves demolishing and replacing the existing sterile processing space on the ground floor, including the complete replacement of three cart lifts serving locations T-1 Clean, T-2 Soiled, and T-3 Clean. The project requires specialized medical facility construction expertise, asbestos abatement capabilities, and installation of complex mechanical systems including HVAC, plumbing, electrical, and sophisticated cart lift systems with microprocessor controls. Evaluation will be based on a best value tradeoff process, with past performance being significantly more important than price, focusing on the contractor's ability to meet technical requirements and complete work within the specified timeframe. The proposal submission deadline has been extended multiple times and is currently set for June 17, 2025, at 1:00 PM EDT, with a site visit having been conducted on April 8, 2025.
This procurement is designated as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under NAICS code 236220 with a project magnitude estimated between $5-10 million. The contract includes a 365-day performance period and strict subcontracting limitations requiring that no more than 85% of the work be subcontracted to non-certified firms. The project involves extensive infection control requirements with an ICRA Category D Level 4 rating and takes place at the Birmingham VA Medical Center located at 700 South 19th Street, Birmingham, Alabama 35294. Contractors must maintain specific Experience Modification Rates, comply with Davis-Bacon wage determinations with minimum wages of $17.75 per hour, and demonstrate capability in complex medical facility renovations involving specialized equipment like traction cartlifts with 1000 lb rated loads and 300 fpm contract speeds. The project permit is valid from June 1, 2025, to December 31, 2025, indicating the expected construction timeline for this critical medical facility infrastructure upgrade.
Notice text
12 versions
Update #12 · Latest ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
_________________________________________
5/19/2025 - RFP Amendment 0007 posted to answer RFIs, extend out the proposal due date, and post Attachments 0007A and 0007B
_________________________________________
5/20/2025 - RFP Amendment 0008 posted to update clauses and provisions.
_________________________________________
5/30/2025 - RFP Amendment 0009 posted to extend the due date for proposals.
_________________________________________
6/5/2025 - RFP Amendment 0010 posted to extend the due date for proposals.
_________________________________________
6/9/2025 - RFP Amendment 0011 posted to answer final RFIs and provide Attachments 0011A, 0011B, 0011C, and 0011D.
Update #11 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
_________________________________________
5/19/2025 - RFP Amendment 0007 posted to answer RFIs, extend out the proposal due date, and post Attachments 0007A and 0007B
_________________________________________
5/20/2025 - RFP Amendment 0008 posted to update clauses and provisions.
_________________________________________
5/30/2025 - RFP Amendment 0009 posted to extend the due date for proposals.
_________________________________________
6/5/2025 - RFP Amendment 0010 posted to extend the due date for proposals.
Update #10 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
_________________________________________
5/19/2025 - RFP Amendment 0007 posted to answer RFIs, extend out the proposal due date, and post Attachments 0007A and 0007B
_________________________________________
5/20/2025 - RFP Amendment 0008 posted to update clauses and provisions.
_________________________________________
5/30/2025 - RFP Amendment 0009 posted to extend the due date for proposals.
Update #9 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
_________________________________________
5/19/2025 - RFP Amendment 0007 posted to answer RFIs, extend out the proposal due date, and post Attachments 0007A and 0007B
_________________________________________
5/20/2025 - RFP Amendment 0008 posted to updated clauses and provisions.
Update #8 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
_________________________________________
5/19/2025 - RFP Amendment 0007 posted to answer RFIs, extend out the proposal due date, and post Attachments 0007A and 0007B
Update #7 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
_________________________________________
5/13/2025 - RFP Amendment 0006 posted to extend out the proposal due date.
Update #6 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
_________________________________________
5/5/2025 - RFP Amendment 0005 posted to answer RFIs and to post Attachments 0005A, 0005B, & 0005C
Update #5 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
_________________________________________
5/1/2025 - RFP Amendment 0004 posted to extend out the proposal due date.
Update #4 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
________________________________________
4/24/2025 - RFP Amendment 0003 posted to extend out the proposal due date.
Update #3 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment 0001 posted to update Provisions & Clauses
________________________________________
4/10/2025 - RFP Amendment 0002 posted to provide Site Visit attendance sheet.
Update #2 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
________________________________________
4/3/2025 - RFP Amendment posted to update Provisions & Clauses
Update #1 ·
Project No. 521-23-121 | SPS Renovation Phase 2 | Birmingham, AL VAMC
*See attached RFP and accompanying documents.
________________________________________
3/26/2025 - RFP 36C24725R0079 posted
Files
Show all 34
Notice history
| Notice | Type | Posted |
|---|---|---|
| Y1DA--521-23-121 | SPS Renovation Phase 2 | Special Notice | |
| This notice | Solicitation | |
| Y1DA--521-23-121 | SPS Renovation Phase 2 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--Renovate Space for Patient Care Improvements | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Modernize 6N Inpatient Restrooms (Swing for 3N) | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Sources sought notice - VISN 7 construction MATOC 36C24726R0026 | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity