Attachment 0011A - Pre-Bid RFI Response Sheets.pdf
PDF 933 KB Posted
- Attached to
- Y1DA--521-23-121 | SPS Renovation Phase 2
- Solicitation number
- 36C24725R0079
About this file
The documents are mechanical engineering drawings for a Sterile Processing Suite (SPS) Renovation Phase 2 project at the Birmingham VA Medical Center. The drawings include detailed mechanical system plans, schedules, and control diagrams for air handling units, exhaust fans, steam systems, and ventilation equipment. Key technical specifications include:
The mechanical systems are designed for a ground floor renovation with complex HVAC requirements, including multiple air handling units (ACGB-0 and ACGB-1) with 16,650 and 1,820 CFM capacities, respectively. The design incorporates specialized exhaust systems for wet and dry areas, with intricate control sequences for exhaust valves linked to equipment like Steris washer disinfectors and steam sterilizers. The project includes detailed specifications for steam generation, condensate management, air devices, pumps, and heat exchangers, with emphasis on precise environmental control for a sterile processing environment.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACGB-0
OA LOUVER
EA LOUVER
EA
EF-SPS-1
GE-7
H-1
GE-3
GE-5 GE-4
H-4 H-3
GE-6
GE-1
GE-2
H-2
12"x12"
12"x10"
34"x14"18"x12"
ACGB-1
K M N O P R
LJ
EG-12x12
TYP.2
EG-12x12
TYP.2
EG-12x12
"x
EG-12x12
EG-12x12
TYP.3
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
TYP.2
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
EG-12x12
TYP.5
EG-12x12
TYP.2
"x
10"x10"
10"x10"
8"x8"8"x8"
8" x8
"10 "x
8" x8
"x
8" x8
" 8" x8
6"x6"
8" x8
8"x8"
14"x10"
"x
"x
"x
EF-SPS-2
A/C FILTER WASH
STALL
G021
DECONTAM
G009
EGRESS
CORRIDOR
G013
CANTEEN STOR
G305
MENS
G007
MENS LOCKER
G006
GROUNDS MAINT
EQIUP STORAGE
G018
SOILED ANTE
G002
WOMENS
G004
WOMENS
LOCKER
G003OFFICE
G008
OFFICE
G022
PPE
G005
OFFICE
G024
DISPATCH
G029
PASSAGE
G040
CLEAN ANTE
G041
TRAINING &
MEETING
G039
LIFT 2 SOILED
LIFT 1 CLEAN
HAC / EVS
G033 PPE
G032
ELEC CLOSET
G030 CLEAN PASSAGE
G023
BULK / STERILE
STORAGE
G020
RECEIVING /
BREAKOUT /
STORAGE
G034
ELECTRO / MECH
G311
LIFT 3 CLEAN
STAIR 6
ST-6
MECH
G019
STERILE CART
ASSEMBLY
G017
PREP &
ASSEMBLY
G014
LOW TEMP
G016
CART WASH
(W/RAMPS)
G010
RO / DI
G043
"x
20"x10"
EG-12x12
"x
"x
8"x8" 10"x8"
EG-12x12
38"x14"
50"x14"
EG-12x6
EG-12x6
EG-12x6
"x
38"x14"
24"x12"
"x
" 26
"x
"x
50"x14"
"x
"x
12"x12"
10"x10"
14"x10"
EF-SPS-3
"x
L.2
EG-12x6
EG-12x6
"x
"x
"x
"x
16"x12"
"x
"x
8"
10"x8"
EG-12x6
8" x6
6"x6"
6"x6"
8"x6"
EG-12x12
EG-12x12
"x
GE-8
EG-12x12
WET
EXHAUST
DUCT
WET EXHAUST
DUCT
WET EXHAUST
DUCT
WET EXHAUST
DUCT
WET
EXHAUST
DUCT
EG-12x12
TYP.2
TYP.5
1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR(S) TO VERIFY EXISTING DUCTWORK, PIPING AND
EQUIPMENT LOCATIONS. REPORT ANY DISCREPANCIES BETWEEN PLANS
AND SITE CONDITIONS TO A/E. CONTRACTOR SHALL COORDINATE WITH ALL
OTHER TRADES AND EXISTING CONDITIONS.
2. DIFFUSERS IN CLEAN SPACES TO BE PROVIDED WITH GASKET.
KEY NOTES:
1. PROVIDE NEW EXHAUST FAN. CONNECT TO NEW EXHAUST AIR FROM
BUILDING AND EXHAUST AIR TO LOUVER OUT OF BUILDING.
2. PROVIDE NEW OUTSIDE AIR LOUVER IN THIS LOCATION. PROVIDE NEW
LOUVER AND CONNECT TO OUTSIDE AIR DUCTWORK.
3. PROVIDE NEW EXHAUST AIR LOUVER SIZED IN THIS LOCATION. PROVIDE
NEW LOUVER AND CONNECT TO EXHAUST AIR DUCTWORK.
4. CONNECT NEW WELDED STAINLESS STEEL WET EXHAUST DUCT TO CART
WASH UNIT. SLOPE TO DRAIN. PROVIDE P-TRAP, ROUTE TO NEAREST DRAIN
AND TERMINATE OVER WITH AIR GAP.
5. PROVIDE NEW FIELD FABRICATED EXHAUST HOOD ABOVE THE STERIS
EQUIPMENT. SEE DETAIL 12/M-503 FOR MORE INFORMATION.
6. COORDINATE WET EXHAUST CONNECTION WITH STERIS EQUIPMENT.
SHEET NOTES:
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
6/ 6/
2:
:4
PM
Au to de sk
D oc s:
//D
AV
V
A
AL
B irm in gh am S
PS
/5
-2
3-
1-
7-
Bi rm in gh am S
PS
-M ec ha ni ca l.r vt
521-23-121
06/06/2025
PRE-BID RFI
RESPONSESDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
ONE
M-102 J.M.M.D.
700 SOUTH 19TH STREET, BIRMINGHAM, AL 35233-1927
BIRMINGHAM SPS PHASE IIGROUND FLOOR MECHANICAL
EXHAUST DUCTWORK PLAN
Approver
BID SET 01/28/2025
PRE-BID RFI RESPONSES 06/06/2025
AIR HANDLING UNIT SCHEDULE
TAG
ACGB-0
ACGB-1
NOTES:
1. AIR HANDLING UNIT TO BE ON EMERGENCY POWER FOR 24/7 OPERATION.
2. PROVIDE FANS WITH VFD
LOCATION
MECH ROOM
MECH ROOM
AREA
SERVED
SPS
ADMIN
CFM
16,650
1,820
COOLING COIL
254.5
16.15
1, 2, 3, 5
1, 2, 4, 5
NOTES
GPM
MIN OA
CFM
460/3/60
460/3/60
V/PH/HZ
SUPPLY FAN
13.5
1.88
TOTAL BHP
1.4
1.2
E.S.P.
IN W.C.
16,650
1,820
EWT/LWT
DEG F
180 /
180 /
EAT/LAT
DEG F
20.8 /
20.8 / 65.7
GPM
29.5
8.87
MIN MBH
88.82
MAX FACE VEL.
553.3
EWT
48.59/ 48.59
55.0/ 54.9
EAT DB/WB
95.6/74.6
95.6/74.6
MIN MBH
1278.18
121.5
MAX FACE VEL
452.7 FPM
403 FPM
LWT
RPM
PROPYLENE GLYCOL HEATING COIL
LAT DB/WB
ELECTRICAL
38.5
4.2
FLA
40.4 / 45
MCA /
MOCP
3. AHU SERVING CONSTANT VOLUME SPACE
4. AHU SERVING VARIABLE AIR VOLUME SPACE
SIZE
40x24
22x12
RATING
MERV 7
MERV 7
PRESSURE
DROP
0.13"
0.74"
PRE-FILTER 1
SIZE
40x24
22x12
RATING
MERV 11
MERV 11
PRESSURE
DROP
0.23"
0.74"
PRE-FILTER 2
SIZE
40x24
22x12
RATING
MERV 14
MERV 14
PRESSURE
DROP
0.22"
0.1"
AFTER FILTER HUMIDIFIER
LB/H LEAVING AIR
RH%
330 60
26 40
TYPE
CV
VAV
5. PROVIDE NEW AIRFLOW STATIONS. SEE CONTROLS DIAGRAM FOR MORE INFORMATION.
EXHAUST FAN SCHEDULE
TAG
EF-SPS-1
EF-SPS-2
NOTES:
1. FANS TO BE PROGRAMMED TO ALTERNATE OPERATION TO FACILITATE EVEN WEAR
2. BASIS OF DESIGN: GREENHECK BSQ-360
3. BASIS OF DESIGN: GREENHECK QEI-12
4. PROVIDE FANS WITH VFD
5. EXHAUST FANS TO BE ON EMERGENCY POWER FOR 24/7 OPERATION.
LOCATION
MECH ROOM
MECH ROOM
AREA
SERVED
SPS DRY
EXHAUST
SPS DRY
EXHAUST
MAX CFM
18,100
18,100
1, 2, 4, 5
1, 2, 4, 5
NOTES
208/3/60
208/3/60
V/PH/HZ
SUPPLY FAN MOTOR
HP
1.1
1.1
E.S.P.
IN W.C.
RPM
TYPE
IN-LINE
IN-LINE
BELT
BELT
DRIVE
15.6
15.6
SONES
(RADIATED)
WEIGHT
(LBS)
EF-SPS-3 ABOVE
CEILING
SPS WET
EXHAUST 1,125 1, 3,
4, 5115/1/6017170.51.2IN-LINE BELT 8.9 662
CONDENSATE PUMP
TAG
NOTES:
1. PUMPING UNIT SHALL BE RATED FOR TEMPERATURES ABOVE 190 DEG F.
LOCATION
MOTOR
NOTES
RPM V/PH/HZ
TYPE GPM
DISCHARGE
PRESSURE
PSIG HP
MANUFACTURER
/ MODEL NUMBER FLA / MCA /
MOCP
CRP - 3 - 01 BLDG 3
B014 1, 26 15 0.5 3500SIMPLEX 208/3/60BELL & GOSSETT
/ 63CC
2.4 / 3 /
5.4
RECEIVER
CAPACITY
GAL.
LOUVER SCHEDULE
L-1
L-2
NOTES:
1. PROVIDE INCECT SCREEN ONTO THE INTERIOR SIDE OF THE LOUVER
TAG
MECH
ROOM
MECH
ROOM
CONSTRUCTION
SPECIALTIES /
BL-6089-120X84
23000
18100
120 X 84
60 X 102
19.48
24.53
0.215
0.088
LOCATION MANUFACTURER
/ MODEL NO.
MAX FLOW
RATE CFM SIZE IN FREE AREA
FT^2
VELOCITY
FT/MIN
PRES. DROP
(IN. WG.)
NOTE
CONSTRUCTION
SPECIALTIES /
BL-6089-60X102
DI STEAM TO STEAM HEAT EXCHANGER SCHEDULE
TAG
DI-STS
NOTES:
1. STEAM FROM DI STEAM GENERATOR ONLY FOR AHU HUMIDIFIER.
2. INCOMING MAKEUP WATER MUST BE LOWERED TO A TOTAL DISOLVED SOLIDS OF 80 PARTS PER
MILLION BY THE DI SYSTEM PER HVAC DESIGN MANUAL 3.2.2.14.
3. PROVIDE WITH INTEGRAL PUMP.
NOTES
1, 2, 3
DI STEAM GENERATED
SERVICE
AHU
HUMIDIFIER
FACILITY STEAM
PRESS
PSIG LB/HR
50030
PRES.
MANUFACTURE
R / MODEL
SPIRAX SARCO
/ CSG-600-DI-15
LB/HR.
15 452
ELECTRICAL
V/PH/HZ
380/3/60
RATED
POWER
0.8 kW
MANUF
RECOMMENDED
AUXILIARY CIRCUIT
PROTECTION
4 A
SPS EQUIPMENT STEAM CALCULATION
EQUIPMENT
CART WASH
AMSCO 7052HP
AMSCO 600
QTY
PRESSURE
PSI
30-80
30-80
50-80
LBS/HR
TOTAL STEAM
LBS/HR - PLANT
STEAM
AMSCO 400 1 50-80 310
SUM TOTAL
TOTAL
RO FOR
STEAM
GPH
TOTAL STEAM
LBS/HR - RO
STEAM
97.5
111.5
37.2
246.2
STEAM TO WATER HEAT EXCHANGER SCHEDULE
TAG
ACGB-HX
NOTES:
1. VERIFY HEAT EXCHANGER CONDITION AND OPERATING PARAMETERS AND REPORT CONDITION AND OPERATING PARAMETERS WITH A/E AND COR. THOROUGHLY INSPECT THE UNIT FOR SIGNS OF CORROSION, FOULING, DAMAGE, TUBE ISSUES, ETC.
2. HEAT EXCHANGER IS TO BE USED FOR SENSIBLE HEATING WITHIN THE SPS SUITE. WATER IS TO BE SUPPLIED TO THE TERMINAL UNITS
REHEAT COILS AND SPS AHU AIR HANDLING UNITS PREHEAT COILS.
3. CLEAN AND REFURBISH THE HEAT EXCHANGER FOLLOWING THE MANUFACTURERS GUIDELINES. REPLACE GASKETS AND SEALS.
TYPE
SHELL AND
TUBE
NOTES
1, 2, 3
LOW TEMPERATURE SIDE (40%
PROPYLENE GLYCOL-WATER)
SERVICE
HEATING
GLYCOL LOOP
FOULING
FACTOR
EWT
DEG F
1500.001
HIGH TEMPERATURE
SIDE (STEAM)
PRESS
PSIG LB/HR
122615
LWT
DEG F
GPM
PRESS
DROP
FT WG
77.9 5
AIR DEVICE SCHEDULE (SUPPLY)
TAG
SD-6
NOTES:
1.
TYPE
AIR FLOW MAX
APD
NC DAMPER FINISH REMARKS
MAXMIN
CFM CFM IN WG
MOUNTING
PANEL/FRAME
SIZE NECK SIZE
IN X IN IN
SD-8
SD-10
SD-12
SD-14
SG-14x6
24 x 24
24 x 24
24 x 24
24 x 24
24 x 24
6" ⌀
8" ⌀
10" ⌀
12" ⌀
14" ⌀
80 160
140 315
220 440
315 630
430 750
0.044
0.155
0.151
0.107
0.091
CEILINGLOUVERED FACE
CEILING
CEILING
CEILING
CEILING
LOUVERED FACE
LOUVERED FACE
LOUVERED FACE
LOUVERED FACE
DUCT MOUNTED 14 x 650 330 0.099SUPPLY REGISTER 24
NONE
NONE
NONE
NONE
NONE
NONE12 x 4
AIR DEVICE SCHEDULE (EXHAUST)
TAG
NOTES:
1.
TYPE
AIR FLOW MAX
APD
NC DAMPER FINISH REMARKS
MAXMIN
CFM CFM IN WG
MOUNTING
PANEL/FRAME
SIZE
NECK SIZE
IN X IN IN
EG-12x12
EG-12x6
24 x 24 12 x 12300 700 0.17 CEILING 28
DUCT MOUNTED
PERFORATED
EXHAUST
REGISTER
40 290 0.099 12 x 6 10 x 4 22 OBD
NONE
PUMP SCHEDULE
TAG
P-SPS1
NOTES:
1. PUMPS TO BE PROGRAMMED TO ALTERNATE OPERATION TO FACILITATE EVEN WEAR
2. PROVIDE PUMPS WITH VFD
3. PUMPS TO BE ON EMERGENCY POWER FOR 24/7 OPERATION.
4. PROVIDE VIBRATION ISOLATION.
MANUFACTURE
BELL &
GOSSETT
MODEL
E-1510 1.25 BC
TYPE
END
SUCTION
MAX
RPM
LOCATION SERVICE
MECHANICAL
ROOM
GLYCOL
HEATING
WATER
FLUID
TYPE
PROPYLENE
GLYCOL
WATER 40%
FLOW
[GPM]
HEAD
[FT. W.C.]
NPSHR
[FT. FLUID]
IMPELLER
DIAMETER
[IN]
PUMP
EFFENCIENCY
77 60 7.36 8.875 55.8
OPERATING
TEMPERATURE
[F]
SUCTION
CONNECTION
[IN]
1.5
DISCHARGE
CONNECTION
[IN]
1.25
BHP
2.04
SIZE [HP]
MOTOR TYPE
V/PH/HZ
208/3/60
MOTOR OPERATING
WEIGHT
[LBS]
REMARKS
1, 2, 3, 4
P-SPS2 BELL &
GOSSETT E-1510 1.25 BC END
SUCTION 1599MECHANICAL
ROOM 77 60 7.36 8.875 55.8 180 1.5 1.25 2.04 3 - 208/3/60 180
GLYCOL
HEATING
WATER
1, 2, 3, 4
PROPYLENE
GLYCOL
WATER 40%
RO STEAM TO STEAM HEAT EXCHANGER SCHEDULE
TAG
RO-STS
NOTES:
1. STEAM FROM RO STEAM GENERATOR ONLY FOR STERIS EQUIPMENT USE AND STERILIZATION IN THE
SPS AREAS.
2. PROVIDE WITH INTEGRAL PUMP.
NOTES
1.,2.
RO STEAM
GENERATED
SERVICE
STERIS
EQUIPMENT
FACILITY STEAM
PRESS
PSIG LB/HR
2300120
PRES.
V/PH/HZ
380/3/60
MANUFACTURE
R / MODEL
SPIRAX SARCO
/ CSG-HS-125
LB/HR.
ELECTRICAL
RATED
POWER
5kW
SUGGESTED
SUPPLY
PROTECTION
16A
STEAM FILTER SCHEDULE
TAG
NOTES:
1.
MANUFACTURER MODEL LOCATION
STF-1 PARKER
HANNIFIN
CORPORATION
G054
STF-2
STF-3
STF-4
BALSTON
23/75SR
BALSTON
23/75SR
BALSTON
23/75SR
BALSTON
23/75SR
G054
G054
G054
PARKER
HANNIFIN
CORPORATION
PARKER
HANNIFIN
CORPORATION
PARKER
HANNIFIN
CORPORATION
EXHAUST VALVE SCHEDULE
TAG
GE-1
UNIT SIZE
AIR FLOW
REMARKSMAXMIN
CFM CFM
PRESSURE
CLASSIFICATION
GE-2
GE-3
GE-4
GE-5
GE-6
850 1515
400 805
3250 3510
0 670
0 670
MEDIUM
3955 4955
GE-7 0 330
GE-8 0 260
12 IN 2
NECK
SIZE ARRAY
12 IN 1
12 IN 4
12 IN 1
12 IN 1
12 IN 6
8 IN 1
8 IN 1
MANUFACTURER /
MODEL
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
TITUS / VENTURI
AIR VALVE VAV
MEDIUM
MEDIUM
MEDIUM
MEDIUM
MEDIUM
MEDIUM
MEDIUM
NOTES:
1. FAST ACTING
2. FULL SHUTOFF
3. PARTIALLY CLOSED
4. HORIZONTAL AIR FLOW
1, 3, 4
1, 3, 4
1, 3, 4
1, 2, 4
1, 2, 4
1, 3, 4
1, 2, 4
1, 2, 4
AREA SERVED
G014
G016, G014
G017
H-3, G014
H-4, G009
G009
H-1, G017
H-2, G009
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
6/ 6/
2:
:4
PM
Au to de sk
D oc s:
//D
AV
V
A
AL
B irm in gh am S
PS
/5
-2
3-
1-
7-
Bi rm in gh am S
PS
-M ec ha ni ca l.r vt
521-23-121
06/06/2025
PRE-BID RFI
RESPONSESDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
ONE
M-501 J.M.M.D.
700 SOUTH 19TH STREET, BIRMINGHAM, AL 35233-1927
BIRMINGHAM SPS PHASE IISCHEDULES
Approver
BID SET 01/28/2025
PRE-BID RFI RESPONSES 06/06/2025
DRAW
THRU
BLOW
THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN
PAN
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN PAN
NOTE:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS
INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
[2 5m m
DIELECTRIC FITTING
A B1"
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN. PIPING SHALL BE RIGID
COPPER TYPE L OR TYPE M UNLESS NOTE BELOW IS
MET.
m m
1" M
AX
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43
SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[1 1/4]
[7]
[7]
[1 1/2]
[9]
[8]
[2]
[10]
[8]
[2 1/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
DESIGNER'S NOTE:
SHOW ON THE DRAWINGS OTHER SPECIFIED AND
SPECIAL PIPE SUPPORTS WHERE REQUIRED.
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION
SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION
SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECIFER FOR DETAILED HANGER
REQUIREMENTS
A
A
BB
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR
BOLT NUT &
WASHER
SECTION B-B
EQUIPMENT BASE
PLATE
PROVIDE #3 BARS 12"
[300mm] O.C. EACH WAY IN
THE BASE & DOWEL BASE TO
FLOOR
EQUIPMENT BASE
PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3"
[75mm] MIN.)
ANCHOR
BOLT (TYP)
CONCRETE BASE
NOTE:
L & W DIMENSIONS
SHALL BE 6" [150mm]
GREATER THAN THE
EQUIPMENT BASE PLATE.
[400mm]
5" M
IN
[1 m m
5"
M
IN
[1 m m
TYPICAL ANCHOR
BOLT NUT &
WASHER
[2 5m m
L/
L/
5D
1"
16"
2D
L
W
D
5D
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
ELEVATION
THREADED
PIPING
ELEVATION
WELDED
PIPING
TYPICAL WATER PIPING
REDUCER, IF
REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE
POCKET.
AIR
VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER
PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO
DRAIN.
MV
OR
AV
A SIZE, TRAP DISCHARGE LINE 15mm [1/2"] 20mm [3/4"] 32mm [1-1/4"]25mm [1"]SIZE, 45° WELDING NIPPLEB
C LENGTH OF EXPANDED MAIN AHEAD OF
TRAP DISCHARGE PIPE
175mm [7"] 175mm [7"]
415mm [16-1/2"]
50mm [2"]LENGTH OF EXPANDED MAIN FOLLOWING
PERFORATED PIPE
LENGTH OF PERFORATED PIPED
E
RETURN MAIN
SIZE
UP TO 40mm [1-1/2"] 75mm [3"] & OVER
SAME SIZE65mm [2-1/2"]EXPANDED RETURN MAIN SIZE
WELD CAP
EXPANDED RETURN MAIN
CAP
REDUCER
INCREASER A
B A
A
RETURN MAIN
FLOW
SECTION-EXPANDED RETURN MAIN
PERFORATED TUBE
415mm [16-1/2"]
50mm [2"]
50mm [2"]
EXPANDED
RETURN
MAIN
PERFORATED TUBE 1"x1/8" [25x6mm] THICK GUIDE FINS
WELDED TO PERFORATED TUBE
SECTION A-A
EDC
NOTES:
1. 15mm [1/2"] PERFORATED TUBE SHALL HAVE 40 - 16mm [1/8"] DIAMETER HOLES SPACED 40mm [1-1/2"] O.C. IN 4 ROWS.
2. 20mm [3/4"] PERFORATED TUBE SHALL HAVE 78 - 6mm [1/8"] DIAMETER HOLES SPACED 40mm [1-1/2"] O.C. IN 6 ROWS.
3. HOLES IN TUBE SHALL BE SPACED EQUALLY AROUND
PERIMETER.
FLEX DUCT IS ONLY PREMISSABLE ON ACGB-1 DUCT SYSTEM.
[6 "M
IN
(T
YP
2m m
D
NOTES:
1.
2.
PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED TO FACILITATE GRAVITY
RETURN OF STEAM CONDENSATE.
3.
MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.
CONTROL VALVES SHALL BE IN A 1/3 AND 2/3 SIZE ARRANGEMENT.
TEST PLUG
(TYP.)
THERMOMETER & PRESSURE (TYP.)
STS
HEAT
EXCHANGER
(TYP.)
RO SUPPLY
RO STEAM SUPPLY
STCR TO FLASH
TANK OR TO STCR MAIN LINE
(TYP.)
15mm [1/2"] CHECK
VALVE VACUUM
BREAKER (TYP.)
SCALE
(TYP.)
DDC TEMPERATURE AND
PRESSURE
SENSORS (TYP.)
TT
PI
THERMOSTATIC AIR
VENT
(TYP.)
CONTROL VALVES IN 2/3 & 1/3
SIZE ARRANGEMENT,
TYP.
BYPASS
IF INSTALLED
LOWER THAN
MAIN HPS LINE,
PROVIDE ANOTHER
SCALE
POCKET/TRAP
HERE.
NC
PROVIDE AN ISOLATION VALVE HERE.
DDC PRESSURE
SENSORS (TYP.)
PI
ROOM
TEMPERATURE/HUMIDITY
SENSOR
WALL MOUNTED
48" [1200mm] AFF.
WITH SUPPLEMENTAL HEATING
TU
RHCHWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
T
ATU
CONTROLLERPC
TT
AI
R
F
LO
W (C
FM
ROOM TEMPERATURE (°F)
CV
CFM
CV BOX CONTROL SEQUENCE
NO DEADBAND
SP
FE
SUPP FLOW
REHEAT FLOW
A. UPON FALL IN SPACE
TEMPERATURE BELOW SET POINT VALVE V-1
WILL MODULATE TO MAINTAIN SET POINT +
.5°, THE ADJUSTABLE TOLERANCE OF + .5°
HAS BEEN SELECTED TO PREVENT VALVE
HUNTING
B. THE REVERSE SHALL OCCUR ON RISE IN
SPACE TEMPERATURE.
ROOM
TEMPERATURE/HUMIDTY
SENSOR
WALL MOUNTED
48" [1200mm] AFF.
WITH SUPPLEMENTAL HEATING
TU
RHCHWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
T
ATU
CONTROLLERPC
TT
AI
R
F
LO
W (C
FM
ROOM TEMPERATURE (°F)
CV
CFM
CV BOX CONTROL SEQUENCE
NO DEADBAND
SP
FE
SUPP FLOW
REHEAT FLOW
A. UPON FALL IN SPACE
TEMPERATURE BELOW SET POINT VALVE V-1
WILL MODULATE TO MAINTAIN SET POINT +
.5°, THE ADJUSTABLE TOLERANCE OF + .5°
HAS BEEN SELECTED TO PREVENT VALVE
HUNTING
B. THE REVERSE SHALL OCCUR ON RISE IN
SPACE TEMPERATURE.
NOTE:
1. ALL PIPING AND PIPE FITTINGS ARE TO BE
STAINLESS STEEL. CAST IRON OR MALLEABLE
FITTINGS AND COMPONENTS ARE PROHIBITED IN
HIGH AND MEDIUM PRESSURE STEAM SYSTEMS
PER VHA 003C2B-DA-151.
2. THE USE OF ASTM A307 BOLTS IS PROHIBITED ON
THIS PROJECT. CONTRACTOR IS TO UTILIZE
ALLOY-STEEL OR STAINLESS STEEL, ASTM A193
METHODS FOR ALL FLANGE BOLTING. IF THE
CONTRACTOR IDENTIFIES OR OBSERVES
POTENTIAL ASTM A307 BOLTS ON ANY EXISTING
STEAM OR HYDRONIC PIPING WITHIN THE
PROJECT AREA THEY ARE TO NOTIFY THE VA COR
IMMEDIATELY AND DOCUMENT THE LOCATION AND
QUANTITY IN WRITING.
3. FOR FLASH STEAM RECOVERY, FLASH TANK TO BE
VERTICAL TYPE. PROVIDE BACK PRESSURE VALVE
AND SAFETY RELIEF VALVE AT FLASH STEAM LINE.
PROVIDE TRAP AT BOTTOM CONDENSATE
DISCHARGE LINE. NO VENT INTERCONNECTION
BETWEEN CONDENSATEDISCHARGE AND THE
FLASH STEAM LINE.
102mm [4"]
FLASH TANK SCHEDULE
CONDENSATE PUMP
CAPACITY- L/S [GPM]
APPROX. CAPACITY OF
FLASH TANK- L [GALLONS]
SIZE OF FLASH TANK-
mm [in]
0 THRU 237
[0 THRU 15] 61[16] 356mm DIA X 610mm LONG
[14 DIA. X 24 LONG]
253 THRU 349
[16 THRU 22] 91[24]
365mm DIA X 914mm LONG
[14 DIA. X 36 LONG]
364 THRU 475
[23 THRU 30] 117[31]
406mm DIA X 914mm LONG
[16 DIA. X 36 LONG]
491 THRU 586
[31 THRU 37] 140[37]
406mm DIA X 1067mm LONG
[16 DIA. X 42LONG]
602 THRU 713
[38 THRU 45] 159[42]
406mm DIA X 1219mm LONG
[16 DIA. X 48 LONG]
729 THRU 951
[46 THRU 60] 231[61]
457mm DIA X 1372mm LONG
[18 DIA. X 54 LONG]
967 THRU 1189
[61 THRU 75] 284[75]
457mm DIA X 1676mm LONG
[18 DIA. X 66 LONG]
1205 THRU 1537
[76 THRU 97] 360[95]
610mm DIA X 1372mm LONG
[24 DIA. X 54 LONG]
1553 THRU 2377
[98 THRU 150] 587[155]
610mm DIA X 1981mm LONG
[24 DIA. X 78 LONG]
HEIGHT DEPENDING ON
INLET OR PUMP TO BE
INSTALLED.
PROVIDE PIPE
SUPPORT AND
SADDLES.
0-2000kPa [30°-300°F]
FLASH TANK DIELECTRIC FITTING
(WHEN RETURN IS COPPER)
RETURN
H.P. DRIP RETURNS.
(SEE FLOOR PLANS)
51mm [2"] VENT TO OUTSIDE OF BUILDING
FLOOR
GRAVITY RETURN TO
CONDENSATE PUMP
PIPE WITH 6mm [1/4"] PERFORATIONS SHALL
EXTEND FULL LENGTH OF TANK AND SHALL
BE SAME DIAMETER OF CONDENSATE RETURN
CONNECTION TO TANK. TOTAL AREA OF ALL
6mm [1/4"] PERFORATIONS SHALL BE EQUIVALENT
TO THE TRANSVERSE AREA OF THE PIPE.
0-2000kPa [30°-300°F]
DUCTWORK TO BE CONTINUOUSLY SEALED (SEAMS AND JOINTS) WITH APPROVED DUCT
SEALANT. AFTER DUCT SEALANT APPLICATION, COVER IT WITH ALUMINUM TAPE.
1/2" CONDENSATE COLLECTION DRAIN PIPE. ROUTE PIPE TO NEAREST FLOOR DRAIN OR FLOOR SINK AND TERMINATE WITH AIR GAP OVER THE DRAIN. PROVIDE CLEANOUT AT 90 DEGREE CHANGE IN DIRECTION. SLOPE PIPE TOWARDS DRAIN AT 1/8" PER FOOT. IF PIPE IS ROUTED THROUGH THE
WALL, PROVIDE P-TRAP TO ENSURE THERE IS NO AIR INFILTRATION BETWEEN SPACES.
CONDENSATE COLLECTION TO BE SLOPED TO CONDENSATE COLLECTION DRAIN PIPE AT 1/8" PER FOOT.
1 -
EQUIPMENT DOOR
EQUIPMENT
FIELD FABRICATED
STEAM CAPTURE HOOD
EXHAUST VALVECEILING
NOTES:
APPROX. 2' MINIMUM
CONDENSATE COLLECTION 1
2 -
3 -
EXHAUST DUCT 3
DUCT CONNECTION TO BE CENTERED OVER EQUIPMENT. IF HOOD SERVES MORE THAN ONE, DUCT TO BE SPLIT TO BE CONNECTED CENTERED ABOVE EACH UNIT AND AIRFLOW TO BE BALANCED EVENLY
BETWEEN EACH DUCT CONNECTION.
4 -
HOOD TO BE CONSTRUCTED OF SEAM WELDED 14 GAUGE OR 16 GAUGE 316 SS SHEET.5 -
5 6
SLOPE TOP OF HOOD AT 1/4" PER FOOT TOWARDS CONDENSATE COLLECTION. WIDTH OF THE
HOOD TO BE THE FULL WIDTH OF ALL EQUIPMENT SERVING, AND TO BE MINIMUM 8" DEEP.
6 -
AIR HANDLING UNIT DRAIN TRAP
DETAIL
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
6/ 6/
2:
:5
PM
Au to de sk
D oc s:
//D
AV
V
A
AL
B irm in gh am S
PS
/5
-2
3-
1-
7-
Bi rm in gh am S
PS
-M ec ha ni ca l.r vt
521-23-121
06/06/2025
PRE-BID RFI
RESPONSESDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
ONE
M-503 J.M.M.D.
700 SOUTH 19TH STREET, BIRMINGHAM, AL 35233-1927
BIRMINGHAM SPS PHASE IIDETAILS
Approver
2 PIPE HANGERS
3 CONCRETE EQUIPMENT BASES 4
DRAIN VALVE AND AIR VENT
CONNECTIONS 7
STEAM TRAP DISCHARGE INTO
PUMPED CONDENSATE RETURN LINE
8 FLEX DUCT CONNECTOR
HEAT EXCHANGER STEAM TO HOT
WATER
CONSTANT AIR VOLUME TERMINAL
UNIT CONTROL DIAGRAM 6
VARIABLE AIR VOLUME TERMINAL UNIT
CONTROL DIAGRAM
SINGLE SUCTION FLOOR-MOUNTED
PUMPS - CONNECTIONS WITH FLEXIBLE
COUPLINGS
TYPICAL CONNECTIONS TO FLASH
TANK
BID SET 01/28/2025
PRE-BID RFI RESPONSES 06/06/2025
FIELD FABRICATED STEAM CAPTURE
HOOD
AIR
EXHAUST EXHAUST FROM
BUILDING
EF
-D
P
EA FAN
VFD
EF
-D
1 EA FAN
VFD
AF
M
D
EX
H
AU
ST
A
IR
FL
O W
AF-1
IS
O
LA
TI
O N
D
AM
PE
R
S
D-1
IS
O
LA
TI
O N
D
AM
PE
R S
D-2
SU
PP
LY
F
AN
SU
PP
LY
F
AN
SP
EE
D
ST
AR
T/
ST
O P
SU
PP
LY
F
AN
ST
AT
U
S
STS-1SST-1SPD-1
SU
PP
LY
F
AN
SU
PP
LY
F
AN
SP
EE
D
ST
AR
T/
ST
O P
SU
PP
LY
F
AN
ST
AT
U
S
STS-2SST-2SPD-2
EX
H
AU
ST
D U
C T
ST
AT
IC
P
R
ES
SU
R
E
LO
W
S
TA
TI
C
PR
ES
SU
R
E
SW
IT
C
H
PSL
D-2P-1
D
D
AIR
EXHAUST EXHAUST FROM
BUILDING
P
EF
-D
1 EA FAN
VFD
AF
M
D
EX
H
AU
ST
A
IR
FL
O W
AF-1
IS
O
LA
TI
O N
D
AM
PE
R
S
D-1
SU
PP
LY
F
AN
SU
PP
LY
F
AN
SP
EE
D
ST
AR
T/
ST
O P
SU
PP
LY
F
AN
ST
AT
U
S
STS-1SST-1SPD-1
EX
H
AU
ST
D U
C T
ST
AT
IC
P
R
ES
SU
R
E
P-1
LO
W
S
TA
TI
C
PR
ES
SU
R
E
SW
IT
C
H
PSL
D-2
ZS
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
6/ 6/
2:
:5
PM
Au to de sk
D oc s:
//D
AV
V
A
AL
B irm in gh am S
PS
/5
-2
3-
1-
7-
Bi rm in gh am S
PS
-M ec ha ni ca l.r vt
521-23-121
06/06/2025
PRE-BID RFI
RESPONSESDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
ONE
M-604 J.M.M.D.
700 SOUTH 19TH STREET, BIRMINGHAM, AL 35233-1927
BIRMINGHAM SPS PHASE IIWET AND DRY EXHAUST SYSTEMS
CONTROL DIAGRAMS
Approver
WET EXHAUST SEQUENCE:
NORMAL OPERATION
1. EXHAUST FAN SHALL BE INTERLOCKED WITH THE OPERATION OF THE CART WASHER
AND HAS TO BE PROVEN ON PRIOR TO THE CART WASHER BEING OPERATED.
2. EXHAUST FAN SHALL BE INTERLOCKED WITH THE OPERATION OF THE CART WASHER
AND HAS TO BE PROVEN ON PRIOR TO THE CART WASHER BEING OPERATED.
3. DURING NORMAL STARTUP THE EXHAUST FAN ISOLATION FAN SHALL OPEN AND BE
PROVEN OPEN WITH AN ENDSWITCH PRIOR TO THE STARTUP OF THE ASSOCIATED
EXHAUST FAN. THE EXHAUST FAN SHALL BE ENABLED AND SLOWLY RAMP UP TO
MAINTAIN THE EXHAUST STATIC PRESSURE SETPOINT AS DEFINED BY THE TEST AND
BALANCE AGENT. THE EXHAUST FAN SHALL SLOWLY RAMP UP OVER A 60 SECOND
PERIOD AND CONTROL TO THE LOWER SIGNAL OF THE RAMP OR STATIC PRESSURE
CONTROL OUTPUT.
4. IF AN EXHAUST FAN FAILURE IS DETECTED BY A VFD ALARM, EXHAUST FAN CURRENT
SENSOR, ISOLATION DAMPER END SWITCH, OR EXHAUST STATIC PRESSURE BEING
LOWER THAN SETPOINT BY MORE THAN 10% (ADJUSTABLE) FOR MORE THAN 5
MINUTES (ADJUSTABLE) THE FOLLOWING SHALL OCCUR:
a. THE EXHAUST FAN SHALL BE DE-ENERGIZED AND THE ASSOCIATED ISOLATION
DAMPER BE CLOSED.
b. AN EXHAUST FAN FAILURE ALARM SHALL BE GENERATED AT THE BAS
MAINTENANCE SHUTDOWN OPERATION
1. WHEN COORDINATED WITH THE SPS DEPARTMENT THE UNIT SHALL BE ABLE TO BE
PLACED INTO AN OFFLINE MAINTENANCE MODE FOR GENERAL SERVICE OR REPAIR
RESPONSES.
2. WHEN PLACED INTO MAINTENANCE SHUTDOWN MODE THE EXHAUST FAN SHALL RAMP
DOWN AND DE-ENERGIZE, AND THE ISOLATION DAMPER SHALL FULLY CLOSE.
SAFETIES AND ALARMS
1. IF THE ASSOCIATED AHU IS SHUTDOWN DUE TO MAINTENANCE MODE OR SAFETY
SHUTDOWN THE EXHAUST FANS SHALL SHUT DOWN AS DESCRIBED IN MAINTENANCE
SHUTDOWN OPERATION.
2. IF THE EXHAUST AIR STATIC PRESSURE 5% (ADJUSTABLE) FROM THE SETPOINT AN
ALARM SHALL BE GENERATED AT THE BAS.
3. IF THE EXHAUST AIR DAMPER COMMAND DOES NOT MATCH THE POSITION FROM THE
END SWITCH, AN ALARM SHALL BE GENERATED AT THE BAS.
DRY / GENERAL EXHAUST SEQUENCE:
NORMAL OPERATION
1. RUN HOURS FOR EACH OF THE EXHAUST FANS SHALL BE MONITORED AND TOTALIZED
FOR BOTH THE CURRENT PERIOD AND LIFETIME OF THE FAN.
2. THE LEAD FAN SHALL BE DEFINED ON THE FIRST OF THE MONTH TO BE THE FAN WITH
THE LOWEST TOTALIZED RUN HOURS.
3. DURING NORMAL STARTUP THE EXHAUST FAN ISOLATION FAN SHALL OPEN AND BE
PROVEN OPEN WITH AN ENDSWITCH PRIOR TO THE STARTUP OF THE ASSOCIATED
EXHAUST FAN. THE LEAD EXHAUST FAN SHALL BE ENABLED AND SLOWLY RAMP UP TO
MAINTAIN THE EXHAUST STATIC PRESSURE SETPOINT AS DEFINED BY THE TEST AND
BALANCE AGENT. THE EXHAUST FAN SHALL SLOWLY RAMP UP OVER A 60 SECOND
PERIOD AND CONTROL TO THE LOWER SIGNAL OF THE RAMP OR STATIC PRESSURE
CONTROL OUTPUT.
4. IF AN EXHAUST FAN FAILURE IS DETECTED BY A VFD ALARM, EXHAUST FAN CURRENT
SENSOR, ISOLATION DAMPER END SWITCH, OR EXHAUST STATIC PRESSURE BEING
LOWER THAN SETPOINT BY MORE THAN 10% (ADJUSTABLE) FOR MORE THAN 5
MINUTES (ADJUSTABLE) THE FOLLOWING SHALL OCCUR:
a. THE LEAD EXHAUST FAN SHALL BE DE-ENERGIZED AND THE ASSOCIATED
ISOLATION DAMPER BE CLOSED.
b. THE STANDBY EXHAUST FAN ISOLATION DAMPER SHALL BE OPEN AND BE PROVEN
OPEN WITH AN ENDSWITCH PRIOR TO THE STARTUP OF THE STANDBY EXHAUST
FAN.
c. THE STANDBY EXHAUST FAN SHALL BE ENABLED AND SLOWLY RAMP UP TO
MAINTAIN THE EXHAUST STATIC PRESSURE SETPOINT AS DEFINED BY THE TEST
AND BALANCE AGENT. THE EXHAUST FAN SHALL SLOWLY RAMP UP OVER A 60
SECOND PERIOD AND CONTROL TO THE LOWER SIGNAL OF THE RAMP OR STATIC
PRESSURE CONTROL OUTPUT.
d. AN EXHAUST FAN FAILURE ALARM SHALL BE GENERATED AT THE BAS
MAINTENANCE SHUTDOWN OPERATION
1. WHEN COORDINATED WITH THE SPS DEPARTMENT THE UNIT SHALL BE ABLE TO BE
PLACED INTO AN OFFLINE MAINTENANCE MODE FOR GENERAL SERVICE OR REPAIR
RESPONSES.
2. WHEN PLACED INTO MAINTENANCE SHUTDOWN MODE THE EXHAUST FAN SHALL RAMP
DOWN AND DE-ENERGIZE, AND THE ISOLATION DAMPER SHALL FULLY CLOSE.
SAFETIES AND ALARMS
1. IF THE ASSOCIATED AHU IS SHUTDOWN DUE TO MAINTENANCE MODE OR SAFETY
SHUTDOWN THE EXHAUST FANS SHALL SHUT DOWN AS DESCRIBED IN MAINTENANCE
SHUTDOWN OPERATION.
2. IF THE EXHAUST AIR STATIC PRESSURE 5% (ADJUSTABLE) FROM THE SETPOINT AN
ALARM SHALL BE GENERATED AT THE BAS.
3. IF THE EXHAUST AIR DAMPER COMMAND DOES NOT MATCH THE POSITION FROM THE
END SWITCH, AN ALARM SHALL BE GENERATED AT THE BAS.
NTS NTS
BID SET 01/28/2025
PRE-BID RFI RESPONSES 06/06/2025
EXHAUST VALVE SEQUENCE:
NORMAL OPERATION GE-5, GE-6, AND GE-8:
1. EXHAUST VALVE GE-6 SHALL BE INTERLOCKED WITH ROOM
PRESSURE. EXHAUST VALVES GE-5 AND GE-6 SHALL BE
INTERLOCKED WITH STERIS 7052 WASHER DISINFECTOR DIRTY SIDE
DOORS. EXHAUST VALVES GE-8 AND GE-6 SHALL BE INTERLOCKED
WITH STERIS CART WASH DIRTY SIDE DOOR.
2. EXHAUST VALVE GE-6 SHALL MODULATE TO MAINTAIN ROOM
PRESSURE BALANCE.
3. WHEN A STERIS 7052 DIRTY SIDE DOOR IS OPEN, GE-5 SHALL OPEN.
GE-6 SHALL MODULATE DOWN WHEN GE-5 OPENS TO MAINTAIN
PRESSURE BALANCE OF ROOM G009.
4. WHEN A STERIS CART WASH DIRTY SIDE DOOR IS OPEN, GE-8 SHALL
OPEN. GE-6 SHALL MODULATE DOWN WHEN GE-8 OPENS TO
MAINTAIN PRESSURE BALANCE OF ROOM G009.
5. WHEN ALL STERIS 7052 DIRTY SIDE DOORS ARE CLOSED, GE-5
SHALL MODULATE TO FULLY CLOSED AFTER A DELAY OF 15 SEONDS.
GE-6 SHALL MODULATE OPEN TO MAINTAIN PRESSURE BALANCE OF
ROOM G009.
6. WHEN ALL STERIS CART WASH DIRTY SIDE DOOR IS CLOSED, GE-8
SHALL MODULATE TO FULLY CLOSED AFTER A DELAY OF 15 SEONDS.
GE-6 SHALL MODULATE OPEN TO MAINTAIN PRESSURE BALANCE OF
ROOM G009.
NORMAL OPERATION GE-1, GE-2, AND GE-4:
1. EXHAUST VALVES GE-1 AND GE-2 SHALL BE INTERLOCKED WITH
ROOM PRESSURE. EXHAUST VALVES GE-1 AND GE-4 SHALL BE
INTERLOCKED WITH STERIS 7052 WASHER DISINFECTOR CLEAN
SIDE DOORS.
2. EXHAUST VALVES GE-1 AND GE-2 SHALL MODULATE TO MAINTAIN
ROOM PRESSURE BALANCE.
3. WHEN A STERIS 7052 CLEAN SIDE DOOR IS OPEN, GE-4 SHALL OPEN.
GE-1 SHALL MODULATE DOWN WHEN GE-4 OPENS TO MAINTAIN
PRESSURE BALANCE OF ROOM G014.
4. WHEN ALL STERIS 7052 CLEAN SIDE DOORS ARE CLOSED, GE-4
SHALL MODULATE TO FULLY CLOSED AFTER A DELAY OF 15 SEONDS.
GE-1 SHALL MODULATE OPEN TO MAINTAIN PRESSURE BALANCE OF
ROOM G014.
NORMAL OPERATION GE-3, AND GE-7:
1. EXHAUST VALVES GE-3 AND GE-7 SHALL BE INTERLOCKED WITH
ROOM PRESSURE AND STERIS STEAM STERILIZER CLEAN SIDE
DOORS.
2. EXHAUST VALVE GE-3 SHALL MODULATE TO MAINTAIN ROOM
PRESSURE BALANCE.
3. WHEN A STERIS STEAM STERILIZER CLEAN SIDE DOOR IS OPEN,
GE-7 SHALL OPEN. GE-3 SHALL MODULATE DOWN WHEN GE-7
OPENS TO MAINTAIN PRESSURE BALANCE OF ROOM G017.
4. WHEN ALL STERIS STEAM STERILIZER CLEAN SIDE DOORS ARE
CLOSED, GE-7 SHALL MODULATE TO FULLY CLOSED AFTER A DELAY
OF 15 SEONDS. GE-3 SHALL MODULATE TO OPEN TO MAINTAIN
PRESSURE BALANCE OF ROOM G017.
File details come from the government source that posted it. Updated .