Attachment 0011D - RODI ROOM ISO REVISED.pdf
PDF 402 KB Posted
- Attached to
- Y1DA--521-23-121 | SPS Renovation Phase 2
- Solicitation number
- 36C24725R0079
About this file
This document is a pre-bid RFI (Request for Information) response drawing for a Reverse Osmosis Deionized (RODI) Plumbing Riser Diagram for the Birmingham SPS Phase II project at the VA Medical Center located at 700 South 19th Street, Birmingham, AL. The technical diagram, prepared by DavEnergy Solutions, details a complex water treatment system with multiple components including water softeners, carbon filters, RO filters, UV sterilizer, endo toxin filter, in-line transfer pumps, critical water test ports, and a buffer/storage tank. The drawing is part of VA project number 521-23-121, labeled as fully sprinklered, and was issued on 06/06/2025, with the drawing number PW-102, indicating a detailed mechanical systems design for water purification infrastructure.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD STAMPCONSULTANT
Revisions: Date:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A/E:
321 4 5 6 7 8 9 10
DAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
6/ 6/
:1
5:
P M
Au to de sk
D oc s:
//D
AV
V
A
AL
B irm in gh am S
PS
/5
-2
3-
1-
7-
Bi rm in gh am S
PS
-M ec ha ni ca l.r vt
521-23-121
06/06/2025
PRE-BID RFI
RESPONSESDAVENERGY SOLUTIONS
2207 GARNET AVE, SUITE I
SAN DIEGO, CA 92109
619-770-8552
ONE
PW-102
J.M.MD
700 SOUTH 19TH STREET, BIRMINGHAM, AL 35233-1927
BIRMINGHAM SPS PHASE IIRO/DI PLUMBING RISER
DIAGRAMS
Approver
PRE-BID RFI RESPONSES 06/06/2025
CRITICAL WATER TEST PORT
UV STERILIZER
ENDO TOXIN FILTER
PRE-FILTER
IN-LINE TRANSFER PUMPS
PLUMBED IN PARALLEL
RO BUFFER / STORAGE TANK
RO RETURN PIPE
RO SUPPLY PIPE
WATER SOFTENERS
RO FILTERS
CARBON FILTER / DECHLORINATOR
CARBON FILTER / DECHLORINATOR N+1
CONTINUOUS CONDUCTIVITY
MONITOR LOCATION
CRITIAL WATER TEST PORT LOCATION
PHIGENICS WATER QUALITY PANEL WITH SHUTOFF VALVE LOCATION
DHW PIPING
DCW PIPING
TMV
DCW PIPING
DHW PIPING
File details come from the government source that posted it. Updated .