WPAFB 2020-2025 Multiple Award Construction Contract

Closed Solicitation Posted

A later notice was posted. The latest for this opportunity is the Limited / Sole Source Justification from . See the latest notice

Solicitation number
FA860119RA043
Agency
AFLCMC Wright Patterson AFB Lifecycle Management Center, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
56 Construction And Building Material
Place of performance
1940 Allbrook Drive Building 1, Room 111 Wpafb Oh 45433 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is for a Multiple Award Construction Contract to provide design-build and design-bid-build construction services at Wright-Patterson Air Force Base from 2020 through 2025. The Department of the Air Force Materiel Command Lifecycle Management Center seeks to award up to twelve indefinite-delivery, indefinite-quantity contracts for maintenance, repair, alteration, and new construction projects. Evaluation will be based on technical factors of management approach, prior experience, sample project execution, and bonding capacity, with price being the determining factor among technically acceptable offers. The response deadline is November 1, 2019.

The solicitation is set aside for small businesses with NAICS code 238210. Up to four of the twelve awards are reserved for 8(a) small businesses. The potential value of the contract is $247 million over five years. Work will be performed at Wright-Patterson Air Force Base and includes new construction, repair, alteration, utilities, and specialty construction of buildings, structures, roads, airfields, and other facilities. Task order values may range from $1 million to $10 million.

Notice text

6 versions

Update #6 · Latest ·

NOTE 4: Solicitation Amended 21 Oct 19. Uploaded current QA Log & Amended Section L & M. Solicitation response date unchanged. Package shown is Amendment 5 to the FBO posting, Solicitation Amendment 04.

Update #5 ·

NOTE 3: Solicitation Amended 11 Oct 19.  Uploaded current QA Log & example Cost Estimate breakdown. Extended Solicitation response date to 1 Nov 19. 

Update #4 ·

NOTE: Revised SF30 is forthcoming to incorporate 19 September 2019 Section L, the Wage Determination as Attachment 11, and update regarding special restrictions and/or geographic limitations information. We are currently experiencing IT issues that prevent the issuance of the SF30. Proposal due date of 18 October 2019 is not impacted. 19 September 2019. 

NOTE 2: Updated to reflect 19 September 2019 note. Also, Section L is modified to reflect "no later than 25 September 2019" instead of "prior to 25 Sept 19" in Paragraph 2.1.6. 25 September 2019.

Update #3 ·

NOTE: Revised SF30 is forthcoming to incorporate 19 September 2019 Section L, the Wage Determination as Attachment 11, and update regarding special restrictions and/or geographic limitations information. We are currently experiencing IT issues that prevent the issuance of the SF30. Proposal due date of 18 October 2019 is not impacted. 19 September 2019. 

Update #2 ·

NOTE: Revised SF30 is forthcoming to incorporate 19 September 2019 Section L and the Wage Determination as Attachment 11. We are currently experiencing IT issues that prevent the issuance of the SF30. Proposal due date of 18 October 2019 is not impacted. 19 September 2019. 

Update #1 ·

The MACC is an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for design-build and design­bid-build construction projects, which are specific to WPAFB, and applicable to individual task orders. Work will consist of a broad range of maintenance, repair, alteration and/or new construction work on various real property. Type of work the contractor can expect (not inclusive): new construction of buildings and structures; alteration and repair of buildings, structures, roads, airfields, ground, roofs; specialty construction; utilities; and miscellaneous services including remediation/hazardous waste removal (i.e. asbestos, lead paint etc.). Contractor efforts may also include design/build from concept to 100% design. The Air Force intends to award up to twelve (12) contracts on this effort. Contractors selected for award will form the pool of contractors eligible to compete for individual Task Orders. Each Task Order will be evaluated based on the terms and conditions of the corresponding solicitation. The contractor shall provide all material, equipment, labor and general conditions to accomplish the work required for each individual Task Order.

The assigned SBA Requirement Number is YY1558113300E.

Presolicitation Notice: https://www.fbo.gov/index?s=procurement&mode=form&id=d440208014d38092af3ab45eb08cbcd4&tab=ntype


Attachments

Files attached to this notice, newest first
File Type Posted
Attachment_02_Section_M_30_October_2019_Revised.docx DOCX document
QA_LOG_30_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430005_SF_30.pdf PDF
Attachment_01_Section_L_21_October_2019_Revised.docx DOCX document
Attachment_02_Section_M_21_October_2019_Revised.docx DOCX document
QA_LOG_21_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430004_SF_30.pdf PDF
Attachment_01_Section_L_11_October_2019_Revised.docx DOCX document
Example_Cost_Estimate.pdf PDF
Solicitation_Amendment_FA860119RA0430003_SF_30.pdf PDF
QA_LOG_11_OCT_2019.xlsx XLSX spreadsheet
Attachment_05_Experience_Information_Sheet_11_October_2019.pdf PDF
Attachment_12_Revised_Room_Finish_Schedule.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_11_October_2019.xls XLS spreadsheet
Attachment_08a_REDACTED_Construction_Estimate_Breakdown.xls XLS spreadsheet
Attachment_02_Section_M_01_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430002_SF_30.pdf PDF
QA_LOG_01_OCT_2019.xlsx XLSX spreadsheet
Summary_of_Package_Changes_01_October_2019.docx DOCX document
Attachment_01_Section_L_01_October_2019_Revised.docx DOCX document
Summary_of_Package_Changes_25_Sept_19.docx DOCX document
Solicitation_Amendment_FA860119RA0430001_SF_30.pdf PDF
Attachment_11_Wage_Determination_OH20190081_083019.pdf PDF
Attachment_01_Section_L_25_September_2019_Revised.docx DOCX document
Atch_08_Sample_Project_19_September_2019_19-94_Update_34x22.pdf PDF
Attachment_01_Section_L_19_September_2019_Revised.docx DOCX document
Summary_of_Package_Changes_19_Sept_19.docx DOCX document
Wage_Determination_OH20190081_083019.pdf PDF
Attachment_9_Section_L_and_M_Cross_Reference_Matrix_18_September_2019.xlsx XLSX spreadsheet
Attachment_02_Section_M_18_September_2019.docx DOCX document
Attachment_08_Sample_Project_18_September_2019_1253-1581.pdf PDF
Attachment_08a_REDACTED_Construction_Estimate_Breakdown_for_Sample_project_18_September_2019.xls XLS spreadsheet
Attachment_08_Sample_Project_18_September_2019_1002-1252.pdf PDF
Attachment_04_Experience_Overview_Sheet_18_September_2019.pdf PDF
Attachment_06_Bonding_18_September_2019.pdf PDF
Attachment_05_Experience_Information_Sheet_18_September_2019.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_18_September_2019.xls XLS spreadsheet
Atch_08_Sample_Project_18_September_2019_1-250.pdf PDF
Attachment_01_Section_L_18_September_2019.docx DOCX document
Solicitation_-_FA860119RA043.pdf PDF
Attachment_08_Sample_Project_18_September_2019_501-751.pdf PDF
Atch_08_Sample_Project_18_September_2019_251-500.pdf PDF
Attachment_03_Statement_of_Work_18_September_2019.docx DOCX document
Attachment_10_Bid_Schedule_18_September_2019.pdf PDF
Attachment_08_Sample_Project_18_September_2019_752-1001.pdf PDF
Show all 45

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
MACC PoP Extension and Ceiling Increase J&A Latest Limited / Sole Source Justification
WPAFB 2020-2025 Multiple Award Construction Contract This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity