Attachment_08a_REDACTED_Construction_Estimate_Breakdown.xls

XLS spreadsheet 39 KB Posted

Attached to
WPAFB 2020-2025 Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA860119RA043
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document contains details of a Multiple Award Construction Contract (MACC) opportunity and related file. The MACC is an Indefinite-Delivery Indefinite-Quantity contract issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base. Up to twelve contractors will be selected to form an awardee pool eligible to compete for individual task orders. Work will consist of maintenance, repair, alteration, and new construction projects specific to Wright Patterson Air Force Base across a broad range of construction types. The attached file provides a template for contractors to break down line item estimates by material and labor costs for task order proposals. The MACC has a performance period from 2020 through 2025.

Attachment 8A (11 Oct 19)

View the file

Other files for this federal contract opportunity

Other files attached to WPAFB 2020-2025 Multiple Award Construction Contract, newest first.
File Type Posted
Attachment_02_Section_M_30_October_2019_Revised.docx DOCX document
QA_LOG_30_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430005_SF_30.pdf PDF
Attachment_01_Section_L_21_October_2019_Revised.docx DOCX document
Attachment_02_Section_M_21_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430004_SF_30.pdf PDF
QA_LOG_21_OCT_2019.xlsx XLSX spreadsheet
Attachment_01_Section_L_11_October_2019_Revised.docx DOCX document
Example_Cost_Estimate.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_11_October_2019.xls XLS spreadsheet
Solicitation_Amendment_FA860119RA0430003_SF_30.pdf PDF
QA_LOG_11_OCT_2019.xlsx XLSX spreadsheet
Attachment_05_Experience_Information_Sheet_11_October_2019.pdf PDF
Attachment_12_Revised_Room_Finish_Schedule.pdf PDF
Attachment_02_Section_M_01_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430002_SF_30.pdf PDF
QA_LOG_01_OCT_2019.xlsx XLSX spreadsheet
Summary_of_Package_Changes_01_October_2019.docx DOCX document
Attachment_01_Section_L_01_October_2019_Revised.docx DOCX document
Summary_of_Package_Changes_25_Sept_19.docx DOCX document
Solicitation_Amendment_FA860119RA0430001_SF_30.pdf PDF
Attachment_11_Wage_Determination_OH20190081_083019.pdf PDF
Attachment_01_Section_L_25_September_2019_Revised.docx DOCX document
Atch_08_Sample_Project_19_September_2019_19-94_Update_34x22.pdf PDF
Attachment_01_Section_L_19_September_2019_Revised.docx DOCX document
Summary_of_Package_Changes_19_Sept_19.docx DOCX document
Wage_Determination_OH20190081_083019.pdf PDF
Attachment_9_Section_L_and_M_Cross_Reference_Matrix_18_September_2019.xlsx XLSX spreadsheet
Attachment_02_Section_M_18_September_2019.docx DOCX document
Attachment_08_Sample_Project_18_September_2019_1253-1581.pdf PDF
Attachment_08a_REDACTED_Construction_Estimate_Breakdown_for_Sample_project_18_September_2019.xls XLS spreadsheet
Attachment_08_Sample_Project_18_September_2019_1002-1252.pdf PDF
Attachment_04_Experience_Overview_Sheet_18_September_2019.pdf PDF
Attachment_06_Bonding_18_September_2019.pdf PDF
Attachment_05_Experience_Information_Sheet_18_September_2019.pdf PDF
Attachment_03_Statement_of_Work_18_September_2019.docx DOCX document
Attachment_10_Bid_Schedule_18_September_2019.pdf PDF
Attachment_08_Sample_Project_18_September_2019_752-1001.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_18_September_2019.xls XLS spreadsheet
Atch_08_Sample_Project_18_September_2019_1-250.pdf PDF
Attachment_01_Section_L_18_September_2019.docx DOCX document
Solicitation_-_FA860119RA043.pdf PDF
Attachment_08_Sample_Project_18_September_2019_501-751.pdf PDF
Atch_08_Sample_Project_18_September_2019_251-500.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3052 Line Item

WAPFB MACC
CONSTRUCTION ESTIMATE BREAKDOWN (Copy Additional Sheets as Necessary)UFGS Sections
Division 01 —

General Requirements

CONTRACTORADDRESSDivision 02 — Existing Conditions
Division 03 — Concrete
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICEDivision 04 — Masonry
Division 05 — Metals
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATIONDivision 06 — Wood, Plastics, and Composites
Division 07 — Thermal and Moisture Protection
MATERIAL COSTLABOR COSTSDivision 08 — Openings
UNITOTHERDivision 09 — Finishes
LINEUFGSITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINEDivision 10 — Specialties
NODivisionMEASUREMANDAYSRATECOSTSTOTALDivision 11 — Equipment
Division 12 — Furnishings
(Dropdown Menu)(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)Division 13 — Special Construction
1Division 14 — Conveying Equipment
2Division 21 — Fire Suppression
3Division 22 — Plumbing
4Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
5Division 25 — Integrated Automation
6Division 26 — Electrical
7Division 27 — Communications
8Division 28 — Electronic Safety and Security
9Division 31 – Earthwork
10Division 32 – Exterior Improvements
11Division 33 – Utilities
12Division 34 – Transportation
13Division 35 – Waterway and Marine Construction (will be rarely used)
14Division 40 - Process Interconnections
15Division 41 - Material Processing and Handling Equipment
16Division 42 - Process Heating, Cooling, and Drying Equipment
17Division 43 - Process Gas and Liquid Handling, Purification, and Storage
18Division 44 - Pollution and Waste Control Equipment
19Division 46 - Water and Wastewater Equipment
20Division 48 - Electrical Power Generation
21
0.000.000.000.00

File details come from the government source that posted it. Updated .