About this file

This document contains a construction estimate breakdown template and instructions for a multiple award construction contract opportunity. The template is to be used by offerors to provide a summary of estimated costs for various construction divisions. It includes columns for material, labor, other direct costs and total costs. The federal contract opportunity is for an indefinite-delivery indefinite-quantity multiple award construction contract at Wright Patterson Air Force Base from 2020 to 2025. The broad scope of work includes maintenance, repair, alteration, new construction and specialty construction for buildings, structures, utilities and other real property assets. The Air Force intends to award up to twelve contracts from this solicitation and contractors will compete for individual task orders which will be evaluated separately.

Attachment 07 (11 Oct 19)

View the file

Other files for this federal contract opportunity

Other files attached to WPAFB 2020-2025 Multiple Award Construction Contract, newest first.
File Type Posted
Attachment_02_Section_M_30_October_2019_Revised.docx DOCX document
QA_LOG_30_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430005_SF_30.pdf PDF
Attachment_01_Section_L_21_October_2019_Revised.docx DOCX document
Attachment_02_Section_M_21_October_2019_Revised.docx DOCX document
QA_LOG_21_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430004_SF_30.pdf PDF
Attachment_01_Section_L_11_October_2019_Revised.docx DOCX document
Example_Cost_Estimate.pdf PDF
Solicitation_Amendment_FA860119RA0430003_SF_30.pdf PDF
QA_LOG_11_OCT_2019.xlsx XLSX spreadsheet
Attachment_05_Experience_Information_Sheet_11_October_2019.pdf PDF
Attachment_12_Revised_Room_Finish_Schedule.pdf PDF
Attachment_08a_REDACTED_Construction_Estimate_Breakdown.xls XLS spreadsheet
Attachment_02_Section_M_01_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430002_SF_30.pdf PDF
QA_LOG_01_OCT_2019.xlsx XLSX spreadsheet
Summary_of_Package_Changes_01_October_2019.docx DOCX document
Attachment_01_Section_L_01_October_2019_Revised.docx DOCX document
Summary_of_Package_Changes_25_Sept_19.docx DOCX document
Solicitation_Amendment_FA860119RA0430001_SF_30.pdf PDF
Attachment_11_Wage_Determination_OH20190081_083019.pdf PDF
Attachment_01_Section_L_25_September_2019_Revised.docx DOCX document
Atch_08_Sample_Project_19_September_2019_19-94_Update_34x22.pdf PDF
Attachment_01_Section_L_19_September_2019_Revised.docx DOCX document
Summary_of_Package_Changes_19_Sept_19.docx DOCX document
Wage_Determination_OH20190081_083019.pdf PDF
Attachment_9_Section_L_and_M_Cross_Reference_Matrix_18_September_2019.xlsx XLSX spreadsheet
Attachment_02_Section_M_18_September_2019.docx DOCX document
Attachment_08_Sample_Project_18_September_2019_1253-1581.pdf PDF
Attachment_08a_REDACTED_Construction_Estimate_Breakdown_for_Sample_project_18_September_2019.xls XLS spreadsheet
Attachment_08_Sample_Project_18_September_2019_1002-1252.pdf PDF
Attachment_04_Experience_Overview_Sheet_18_September_2019.pdf PDF
Attachment_06_Bonding_18_September_2019.pdf PDF
Attachment_05_Experience_Information_Sheet_18_September_2019.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_18_September_2019.xls XLS spreadsheet
Atch_08_Sample_Project_18_September_2019_1-250.pdf PDF
Attachment_01_Section_L_18_September_2019.docx DOCX document
Solicitation_-_FA860119RA043.pdf PDF
Attachment_08_Sample_Project_18_September_2019_501-751.pdf PDF
Atch_08_Sample_Project_18_September_2019_251-500.pdf PDF
Attachment_03_Statement_of_Work_18_September_2019.docx DOCX document
Attachment_10_Bid_Schedule_18_September_2019.pdf PDF
Attachment_08_Sample_Project_18_September_2019_752-1001.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

WAPFB MACC

CONSTRUCTION ESTIMATE BREAKDOWN SUMMARY

CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
DIVISION NOUFGS SectionMATERIAL COST (1)LABOR COST (2)OTHER DIRECT COSTS (3)LINE TOTAL (4)
1General Requirements$ - 0
2Existing Concrete$ - 0
3Concrete$ - 0
4Masonry$ - 0
5Metals$ - 0
6Wood, Plastics, and Composites$ - 0
7Thermal and Moisture Protection$ - 0
8Openings$ - 0
9Finishes$ - 0
10Specialties$ - 0
11Equipment$ - 0
12Furnishings$ - 0
13Special Construction$ - 0
14Conveying Equipment$ - 0
21Fire Suppression$ - 0
22Plumbing$ - 0
23Heating, Ventilating, and Air Conditioning (HVAC)$ - 0
25Integrated Automation$ - 0
26Electrical$ - 0
27Communications$ - 0
28Electronic Safety and Security$ - 0
31Earthwork$ - 0
32Exterior Improvements$ - 0
33Utilities$ - 0
34Transportation$ - 0
35Waterway and Marine Construction (rarely used)$ - 0
40Process Interconnections$ - 0
41Material Processing and Handling Equipment$ - 0
42Process Heating, Cooling, and Drying Equipment$ - 0
43Process Gas and Liquid Handling, Purification, and Storage$ - 0
44Pollution and Waste Control Equipment$ - 0
46Water and Wastewater Equipment$ - 0
48Electrical Power Generation$ - 0

Summary Instructions

INSTRUCTIONS FOR COMPLETING CONSTRUCTION ESTIMATE BREAKDOWN SUMMARY
Col 1 Material Costs. Enter total price of the material to be supplied per division
Col 2 Labor Costs. Enter in col 2 the total estimated Labor Price to be supplied per division
Col 3 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 4 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOTAL DIRECT COSTS$
OVERHEAD%$
SUBTOTAL$
PROFIT%$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

3052 Line Item

WAPFB MACC
CONSTRUCTION ESTIMATE BREAKDOWN (Copy Additional Sheets as Necessary)UFGS Sections
Division 01 —

General Requirements

CONTRACTORADDRESSDivision 02 — Existing Conditions
Division 03 — Concrete
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICEDivision 04 — Masonry
Division 05 — Metals
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATIONDivision 06 — Wood, Plastics, and Composites
Division 07 — Thermal and Moisture Protection
MATERIAL COSTLABOR COSTSDivision 08 — Openings
UNITOTHERDivision 09 — Finishes
LINEUFGSITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINEDivision 10 — Specialties
NODivisionMEASUREMANDAYSRATECOSTSTOTALDivision 11 — Equipment
Division 12 — Furnishings
(Dropdown Menu)(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)Division 13 — Special Construction
1Division 14 — Conveying Equipment
2Division 21 — Fire Suppression
3Division 22 — Plumbing
4Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
5Division 25 — Integrated Automation
6Division 26 — Electrical
7Division 27 — Communications
8Division 28 — Electronic Safety and Security
9Division 31 – Earthwork
10Division 32 – Exterior Improvements
11Division 33 – Utilities
12Division 34 – Transportation
13Division 35 – Waterway and Marine Construction (will be rarely used)
14Division 40 - Process Interconnections
15Division 41 - Material Processing and Handling Equipment
16Division 42 - Process Heating, Cooling, and Drying Equipment
17Division 43 - Process Gas and Liquid Handling, Purification, and Storage
18Division 44 - Pollution and Waste Control Equipment
19Division 46 - Water and Wastewater Equipment
20Division 48 - Electrical Power Generation
21
0.000.000.000.00

File details come from the government source that posted it. Updated .