Attachment_08a_REDACTED_Construction_Estimate_Breakdown_for_Sample_project_18_September_2019.xls
XLS spreadsheet 39 KB Posted
- Attached to
- WPAFB 2020-2025 Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA860119RA043
About this file
This solicitation is for a Multiple Award Construction Contract (MACC) to be awarded by the Department of the Air Force Materiel Command Lifecycle Management Center located at Wright Patterson Air Force Base. Up to twelve contractors will be selected to form an indefinite-delivery indefinite-quantity (IDIQ) contract pool eligible to compete for individual task orders between 2020-2025. Task orders will consist of a broad range of construction, maintenance, repair, alteration, and new building projects specific to Wright Patterson Air Force Base. Work may include design-build and design-bid-build contracting and will cover areas such as buildings, structures, roads, airfields, utilities, remediation, and specialty construction. The Air Force intends for the MACC to streamline the process of fulfilling various real property construction needs through the issuance of discrete task orders to pre-qualified contractors over the five year period.
Attachment 08a REDACTED Construction Estimate Breakdown for Sample Project
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| WAPFB MACC | |||
| REDACTED CONSTRUCTION ESTIMATE BREAKDOWN | UFGS Sections | ||
| Division 01 — |
General Requirements
| CONTRACTOR | ADDRESS | Division 02 — Existing Conditions | ||||||||||
| Division 03 — Concrete | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | Division 04 — Masonry | ||||||||||
| Division 05 — Metals | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | Division 06 — Wood, Plastics, and Composites | |||||||||
| Division 07 — Thermal and Moisture Protection | ||||||||||||
| MATERIAL COST | LABOR COSTS | Division 08 — Openings | ||||||||||
| UNIT | OTHER | Division 09 — Finishes | ||||||||||
| LINE | UFGS | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE | Division 10 — Specialties |
| NO | Division | MEASURE | MANDAYS | RATE | COSTS | TOTAL | Division 11 — Equipment | |||||
| Division 12 — Furnishings | ||||||||||||
| (Dropdown Menu) | (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | Division 13 — Special Construction | |
| 1 | Division 14 — Conveying Equipment | |||||||||||
| 2 | Division 21 — Fire Suppression | |||||||||||
| 3 | Division 22 — Plumbing | |||||||||||
| 4 | Division 23 — Heating, Ventilating, and Air Conditioning (HVAC) | |||||||||||
| 5 | Division 25 — Integrated Automation | |||||||||||
| 6 | Division 26 — Electrical | |||||||||||
| 7 | Division 27 — Communications | |||||||||||
| 8 | Division 28 — Electronic Safety and Security | |||||||||||
| 9 | Division 31 – Earthwork | |||||||||||
| 10 | Division 32 – Exterior Improvements | |||||||||||
| 11 | Division 33 – Utilities | |||||||||||
| 12 | Division 34 – Transportation | |||||||||||
| 13 | Division 35 – Waterway and Marine Construction (will be rarely used) | |||||||||||
| 14 | Division 40 - Process Interconnections | |||||||||||
| 15 | Division 41 - Material Processing and Handling Equipment | |||||||||||
| 16 | Division 42 - Process Heating, Cooling, and Drying Equipment | |||||||||||
| 17 | Division 43 - Process Gas and Liquid Handling, Purification, and Storage | |||||||||||
| 18 | Division 44 - Pollution and Waste Control Equipment | |||||||||||
| 19 | Division 46 - Water and Wastewater Equipment | |||||||||||
| 20 | Division 48 - Electrical Power Generation | |||||||||||
| 21 | ||||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 |
File details come from the government source that posted it. Updated .