This document package includes a sample project file related to a federal construction contract opportunity at Wright-Patterson Air Force Base. The contract opportunity is a multiple award construction contract (MACC) solicitation to establish a pool of contractors eligible to compete for individual task orders from 2020 through 2025. Task orders will be for a broad range of construction and facility maintenance services, including new building construction, building alterations and repairs, utilities work, and specialty construction. Contractors may also provide design-build services from initial concept through final design. The Air Force intends to award up to twelve contracts under this solicitation. Task order evaluations will be based on individual solicitation terms and conditions. Selected contractors must have an active System for Award Management registration and be assigned the applicable Small Business Administration size standard number.

Attachment 08 Sample Project Pages 1002-1252

View the file

Other files for this federal contract opportunity

Other files attached to WPAFB 2020-2025 Multiple Award Construction Contract, newest first.
File Type Posted
Attachment_02_Section_M_30_October_2019_Revised.docx DOCX document
QA_LOG_30_OCT_2019.xlsx XLSX spreadsheet
Solicitation_Amendment_FA860119RA0430005_SF_30.pdf PDF
Attachment_01_Section_L_21_October_2019_Revised.docx DOCX document
Attachment_02_Section_M_21_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430004_SF_30.pdf PDF
QA_LOG_21_OCT_2019.xlsx XLSX spreadsheet
Attachment_01_Section_L_11_October_2019_Revised.docx DOCX document
Example_Cost_Estimate.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_11_October_2019.xls XLS spreadsheet
Attachment_08a_REDACTED_Construction_Estimate_Breakdown.xls XLS spreadsheet
Solicitation_Amendment_FA860119RA0430003_SF_30.pdf PDF
QA_LOG_11_OCT_2019.xlsx XLSX spreadsheet
Attachment_05_Experience_Information_Sheet_11_October_2019.pdf PDF
Attachment_12_Revised_Room_Finish_Schedule.pdf PDF
Attachment_02_Section_M_01_October_2019_Revised.docx DOCX document
Solicitation_Amendment_FA860119RA0430002_SF_30.pdf PDF
QA_LOG_01_OCT_2019.xlsx XLSX spreadsheet
Summary_of_Package_Changes_01_October_2019.docx DOCX document
Attachment_01_Section_L_01_October_2019_Revised.docx DOCX document
Summary_of_Package_Changes_25_Sept_19.docx DOCX document
Solicitation_Amendment_FA860119RA0430001_SF_30.pdf PDF
Attachment_11_Wage_Determination_OH20190081_083019.pdf PDF
Attachment_01_Section_L_25_September_2019_Revised.docx DOCX document
Atch_08_Sample_Project_19_September_2019_19-94_Update_34x22.pdf PDF
Attachment_01_Section_L_19_September_2019_Revised.docx DOCX document
Summary_of_Package_Changes_19_Sept_19.docx DOCX document
Wage_Determination_OH20190081_083019.pdf PDF
Attachment_9_Section_L_and_M_Cross_Reference_Matrix_18_September_2019.xlsx XLSX spreadsheet
Attachment_02_Section_M_18_September_2019.docx DOCX document
Attachment_08_Sample_Project_18_September_2019_1253-1581.pdf PDF
Attachment_08a_REDACTED_Construction_Estimate_Breakdown_for_Sample_project_18_September_2019.xls XLS spreadsheet
Attachment_04_Experience_Overview_Sheet_18_September_2019.pdf PDF
Attachment_06_Bonding_18_September_2019.pdf PDF
Attachment_05_Experience_Information_Sheet_18_September_2019.pdf PDF
Attachment_03_Statement_of_Work_18_September_2019.docx DOCX document
Attachment_10_Bid_Schedule_18_September_2019.pdf PDF
Attachment_08_Sample_Project_18_September_2019_752-1001.pdf PDF
Attachment_07_Construction_Estimate_Breakdown_18_September_2019.xls XLS spreadsheet
Atch_08_Sample_Project_18_September_2019_1-250.pdf PDF
Attachment_01_Section_L_18_September_2019.docx DOCX document
Solicitation_-_FA860119RA043.pdf PDF
Attachment_08_Sample_Project_18_September_2019_501-751.pdf PDF
Atch_08_Sample_Project_18_September_2019_251-500.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATE PFD TO F/30257 ZHTV150050

WRIGHT-PATTERSON AFB, OH

3.2.2.2.1 Pull-Through Device

This device shall be a spherical, spheroidal, or elliptical ball, a cylinder, or circular sections fused to a common shaft. Circular sections shall be so spaced on the shaft that distance from external faces of front and back sections will equal or exceed diameter of the circular section.

Pull-through device may also be of a design promulgated by the Uni-Bell Plastic Pipe Association, provided the device meets the applicable requirements specified in this paragraph, including those for diameter of the device, and that the mandrel has a minimum of 9 arms. Ball, cylinder, or circular sections shall conform to the following:

a. A diameter, or minor diameter as applicable, of 95 percent of the average inside diameter of the pipe; tolerance of plus 0.5 percent will be permitted.

b. Homogeneous material throughout, shall have a density greater than 1.0 as related to water at 39.2 degrees F, and shall have a surface Brinell hardness of not less than 150.

c. Center bored and through-bolted with a 1/4 inch minimum diameter steel shaft having a yield strength of not less than 70,000 psi, with eyes or loops at each end for attaching pulling cables.

d. Each eye or loop shall be suitably backed with a flange or heavy washer such that a pull exerted on opposite end of shaft will produce compression throughout remote end.

3.2.2.2.2 Deflection Measuring Device

Sensitive to 1.0 percent of the diameter of the pipe being tested and shall be accurate to 1.0 percent of the indicated dimension. Deflection measuring device shall be approved prior to use.

3.2.2.2.3 Pull-Through Device Procedure

Pass the pull-through device through each run of pipe, either by pulling it through or flushing it through with water. If the device fails to pass freely through a pipe run, replace pipe which has the excessive deflection and completely retest in same manner and under same conditions.

3.2.2.2.4 Deflection measuring device procedure

Measure deflections through each run of installed pipe. If deflection readings in excess of 4.5 percent of average inside diameter of pipe are obtained, retest pipe by a run from the opposite direction. If retest continues to show a deflection in excess of 4.5 percent of average inside diameter of pipe, replace pipe which has excessive deflection and completely retest in same manner and under same conditions.

-- End of Section --

SECTION 33 30 00 Page 7

FINAL DESIGN SUBMITTAL

ZHTV150050

Consolidate PDF to F/30257

Wright-Patterson AFB

FA8601-15-D-0007

DESIGN ANALYSIS

FINAL DESIGN-SUBMITTAL

ARCHITECTURE / STRUCTURAL / MECHANICAL / ELECTRICAL / PLUMBING

BARGE DESIGN SOLUTIONS

1370 VANGUARD BLVD.

MIAMISBURG, OH 4534

INTERIOR DESIGN

EMERSION DESIGN

310 CULVERT STREET, SUITE 100

CINCINNATI, OHIO 45202

FIRE PROTECTION / LIFE SAFETY

FIRELOGIX ENGINEERING, LTD

215 NORTH BROADWAY

LEBANON, OH 45036

ENVIRONMENTAL

STANTEC CONSULTING SERVICES INC.

10509 TIMBERWOOD CIRCLE SUITE 100

LOUISVILLE, KY 40223

31-JAN-2019

EXECUTIVE SUMMARY

Final Design-Submittal

The following codes, standards and design guides are referenced in part or in whole for this project.

AMERICAN NATIONAL STANDARD INSTITUTE (ANSI)

ANSI-C2 (2017) – National Electrical Safety Code

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE-7 (2010; Errata 2011; supp 1 2013) – Minimum Design Loads for Buildings and Other Structures

AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE)

ASHRAE 55 (2013) – Thermal Environmental Conditions for Human Occupancy ASHRAE 62.1 (2013) – Ventilation for Acceptable Indoor Air Quality ASHRAE 90.1 (2013) – Energy Standard for Buildings Except Low-Rise Residential

Buildings. (as referenced in UFC 1-200-02) ASHRAE 189.1 (2014) – Standard for the Design of High-Performance Green Buildings

(as referenced in UFC 1-200-02) ASHRAE 202 (2013) – Commissioning Process for Buildings and Systems

ASHRAE Handbook (2017) – Handbook, Fundamentals (2018) – Handbook, Refrigeration (2015) – Handbook, HVAC Applications (2016) – Handbook, HVAC Systems and Equipment

ASHRAE Guideline 0 (2013) – The Commissioning Process ASHRAE Guideline 1.1 (2007) – HVAC&R Technical Requirements for The Commissioning

Process

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B31.9 (2014) – Building Services Piping

BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL (BICSI)

ANSI/NECA/BICSI 607 (2011) - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings

CODE OF FEDERAL REGULATIONS (CFR)

CFR Title 40, Part 261 Identification and Listing of Hazardous Waste CFR Title 40, Part 262 Standards Applicable to Generators of Hazardous Waste

CFR Title 40, Part 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage and Disposal Facilities

CFR Title 40, Part 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

CFR Title 40, Part 268 Land Disposal Restrictions CFR Title 40, Part 761 Polychlorinated Biphenyls Manufacturing, Processing, Distribution in

Commerce, and Use Prohibitions

COMMITTEE ON NATIONAL SECURITY SYSTEMS (CNSS)

CNSSAM TEMPEST/1-13 (2014) – (U) RED/BLACK Installation Guidance

ENGINEERING TECHNICAL LETTERS (ETL)

ETL 07-4 (2007) - Carpet Standards

ENERGY INDEPENDENCE AND SECURITY ACT (EISA)

EISA 2007 (2007) Energy Independence and Security Act

ENERGY POLICY ACT (EPACT)

EPACT 2005 (2005) Energy Policy Act of 2005

FEDERAL GUIDING PRINCIPLES

HPSB MOU (2008) – HPSE Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings (HPSB Guiding Principles; High Performance and Sustainable Building Guidance” (2016) – Guiding Principles for Sustainable Federal Buildings and Associated Instructions (2016) – Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

ILLUMINATING ENGINEERING SOCIETY (IES)

IESNA Handbook (10th edition) – Lighting Handbook

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) - International Building Code ICC IFC (2015) – International Fire Code ICC IMC (2015) - International Mechanical Code ICC IPC (2015) – International Plumbing Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 1 (2015) - Fire Code NFPA 10 (2013) - Standard for Portable Fire Extinguishers NFPA 13 (2016) - Standard for the Installation of Sprinkler Systems NFPA 20 (2016) - Standard for the Installation of Stationary Pumps for Fire

Protection NFPA 45 (2015) - Standard on Fire Protection for Laboratories Using Chemicals NFPA 70 (2017) - National Electric Code (NEC) NFPA 70E (2015; Errata 1 2015) - Standard for Electrical Safety in the Workplace NFPA 72 (2016) - National Fire Alarm and Signaling Code NFPA 90A (2015) - Standard for the Installation of Air-Conditioning and Ventilating

Systems NFPA 101 (2015) - Life Safety Code NFPA 241 (2013) - Standard for Safeguarding Construction, Alteration, and

Demolition Operations NFPA 291 (2016) - Recommended Practice for Fire Flow Testing and Marking of

Hydrants

SHEET METAL AND AIR CONDITIONING CONTRACTORS ASSOCIATION (SMACNA)

SMACNA 016 (2012) – HVAC Air Duct Leakage Test Manual. 2nd Edition SMACNA 1429 (1994) – HVAC Systems Commissioning Manual, 1st Edition SMACNA 1966 (2005) HVAC Duct Construction Standards Metal and Flexible, 3rd Edition SMACNA 1981 (2008) – Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition

TELECOMMUNICATIONS INDUSTRY ASSOCIATION / ELECTRONICS INDUSTRIES ALLIANCE (TIA/EIA)

TIA/EIA-492AAAA-B (2009) - Detail specification for 62.5- m core diameter/125- m cladding diameter class Ia graded-index multimode optical fibers

TIA/EIA-568.1-D (2015) – Commercial Building Telecommunications Cabling Standard TIA/EIA-569-B (2004) –Commercial Building Standard for Telecommunications

Pathways and Spaces ANSI/TIA-606-B (2012) – Administration Standard for Telecommunications

Infrastructure ANSI/TIA-607-C (2015) – Generic Telecommunications Bonding and Grounding

(Earthing) for Customer Premises TIA-758-B (2012) – Customer-Owned Outside Plant Telecommunications

Infrastructure Standard TSB-36 (1991) – Additional Cable Specifications for Unshielded Twisted Pair

Cables

UNITED FACILITIES CRITERIA (UFC)

UFC 1-200-01 (2018; with Change 1) – General Building Requirements UFC 1-200-02 (2018; with Change 2) – High Performance and Sustainable Building

Requirements UFC 1-300-02 (2017; with Change 1) – Unified Facilities Guide Specifications (UFGS)

Format Standard UFC 1-300-08 (2011; with Change 2) – Criteria for Transfer and Acceptance of DoD

Real Property UFC 3-101-01 (2016, with Change 3) – Architecture UFC 3-120-01 (2014; with Change 3) – Design: Sign Standards UFC 3-120-10 (2018) – Interior Design UFC 3-190-06 (2004) – Protective Coatings and Paints UFC 3-301-01 (2016; with Change3) – Structural Engineering UFC 3-310-04 (2016; with Change 1) – Seismic Design For Buildings UFC 3-401-01 (2015; with Change 1) – Mechanical Engineering UFC 3-410-01 (2017; with Change 4) – Heating, Ventilating and Air-Conditioning

Systems UFC 3-420-01 (2015; with Change 10) – Plumbing Systems UFC 3-501-01 (2015) – Electrical Engineering UFC 3-520-01 (2015) – Interior Electrical Systems UFC 3-530-01 (2016; with Change 3) – Interior and Exterior Lighting Systems and

Controls UFC 3-560-01 (2018; with Change 1) – Electrical Safety, O&M UFC 3-580-01 (2016; with Change 1) – Telecommunications Interior Infrastructure

Planning and Design UFC 3-600-01 (2018; with Change 2) – Fire Protection Engineering for Facilities UFC 4-010-01 (2013; with Change 1) – DoD Minimum Antiterrorism Standards for

Buildings UFC 4-021-01 (2010; with Change 1) – Design and O&M: Mass Notification Systems UFC 4-021-02 (2013) – Electronic Security Systems UFC 4-610-01 (2014; with Change 2) – Administrative Facilities

U.S. AIR FORCE

(2002) - U.S. Air Force Interior Design Standards AFMAN 32-1084 (2016) - Facility Requirements

WRIGHT-PATTERSON AIR FORCE BASE (WPAFB) STANDARDS

BFS (2016, Mar) – Wright-Patterson AFB, Base Facility Standard

High Performance and Sustainable Building Requirements

Wright-Patterson AFB

Opening Protection

Wright-Patterson AFB

Final Design-Submittal

Penetration Protection (Dampers)

Business Occupancy (protected with sprinklers)

Storage Occupancy (ordinary hazard - protected with sprinklers)

Wright-Patterson AFB

Final Design-Submittal

Category Density (gpm/sf)

Area (sf)*

Hose (gpm)

Duration (min)

Examples

Light Hazard

.10 1,500 250 Circulation areas, offices, restrooms, toilets, waiting area, conference rooms.

Ordinary Hazard

.20 2,500 250 Mechanical rooms, electrical rooms, light storage, communications rooms.

Storage of Class IV Commodi ties on Racks to 20 feet

NA NA 250 12 heads (K=25.2) @ 20 psi

*Adjust areas as required in NFPA 13. Areas shown are base areas. Larger design areas may be required to account for sloped decks, dry systems and other conditions found in NFPA 13.

Quick response sprinkler area reductions are not permitted.

CONSOLIDATE PDF TO F/30257

WRIGHT-PATTERSON AIR FORCE BASE

DAYTON, OHIO

310 Culvert Street, Suite 100 | Cincinnati, OH 45202 | P 513 841 9100 | emersiondesign.com

SID 1

TYPICAL BUILDING FINISHES

P1 - TYPICAL PAINT

MANF: SHERWIN WILLIAMS

COLOR: OYSTER WHITE SW7637

P2 - CEILING PAINT

MANF: SHERWIN WILLIAMS

COLOR: ORIGAMI WHITE SW7636

PL1

MANF: WILSONART

COLOR: FLAX LINEN 4990-38

PL2

MANF: WILSONART

COLOR: ALMOND LEATHER 2932-60

DAYTON, OHIO

310 Culvert Street, Suite 100 | Cincinnati, OH 45202 | P 513 841 9100 | emersiondesign.com

CT1/CTB1

MANF: DALTILE

STYLE: VOLUME 1.0

COLOR: INTENSITY PEBBLE VL72

VCT1

MANF: ARMSTRONG

STYLE: EXCELON

COLOR: MEZZOTINT 54806

SID 2

TYPICAL BUILDING FINISHES

ACT1

MANF: ARMSTRONG

STYLE: DUNE

COLOR: WHITE

RB1

MANF: JOHNSONITE

COLOR: 48 GREY

DAYTON, OHIO

310 Culvert Street, Suite 100 | Cincinnati, OH 45202 | P 513 841 9100 | emersiondesign.com

RSH1

MANF: DRAPER

STYLE: SHEERWEAVE BASIC, 3% OPENNESS

COLOR: P05 WHITE/PLATINUM

SID 3

TYPICAL BUILDING FINISHES