Atch_08_Sample_Project_19_September_2019_19-94_Update_34x22.pdf
PDF 19 MB Posted
- Attached to
- WPAFB 2020-2025 Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA860119RA043
About this file
This solicitation is for a Multiple Award Construction Contract (MACC) to provide design-build and design-bid-build construction services at Wright-Patterson Air Force Base from 2020 to 2025. Work will include new construction, alteration, repair, and specialty construction of buildings, structures, roads, airfields, utilities, and miscellaneous services such as hazardous waste removal. The Air Force intends to award up to twelve contracts for contractors to compete for individual task orders, which will be evaluated based on each solicitation's terms. Contractors shall provide all materials, equipment, labor, and general conditions for each task order. The assigned SBA size standard is $36.5 million. Presolicitation notice was published on February 14, 2019.
Attachment 08 Sample Project Update 34x22
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L
ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
G-001
COVER SHEET
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
CONSOLIDATE PDF TO F/30257
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: 10100620
CONTRACT NUMBER:
FA8601-15-D-0007
FINAL DESIGN SUBMITTAL
31 JAN 2019
FIRE PROTECTION
FIRE LOGIX ENGINEERING, LTD
215 NORTH BROADWAY
LEBANON, OH 45036
ENVIRONMENTAL
STANTEC CONSULTING SERVICES, INC.
10509 TIMBERWOOD CIRCLE, SUITE 100
LOUISVILLE, KY 40233
ARCHITECTURAL/INTERIORS
STRUCTURAL ENGINEERING
MEP ENGINEERING
BARGE WAGGONER SUMNER & CANNON, INC.
1370 VANGUARD BLVD.
MIAMISBURG, OH 45342
EMERSION DESIGN
310 CULVERT STREET, SUITE 100
CINCINNATI, OH 45202
ZHTV150050
Sheet Reference Number
Sheet Number
Sheet Description (Title)
1 OF 76 G-001 COVER SHEET
2 OF 76 G-002 SHEET INDEX
3 OF 76 G-003 GENERAL NOTES & SYMBOLS - VICINITY MAP
4 OF 76 V-101 EXISTING CONDITIONS
5 OF 76 C-001 CIVIL GENERAL NOTES AND LEGEND
6 OF 76 C-101 CIVIL SITE PLAN
7 OF 76 C-501 CIVIL DETAILS
8 OF 76 H-100 HAZARDOUS MATERIALS SURVEY SAMPLE LOCATION MAP
9 OF 76 A-001 GENERAL NOTES AND ABBREVIATIONS
10 OF 76 AD101 OVERALL DEMOLITION PLAN - AREA 'A'
11 OF 76 AD102 OVERALL DEMOLITION PLAN - AREA 'B'
12 OF 76 A-101 OVERALL FLOOR PLAN - AREA 'A'
13 OF 76 A-102 OVERALL FLOOR PLAN - AREA 'B'
14 OF 76 A-111 AREA 'A' - PARTIAL FLOOR PLANS
15 OF 76 A-121 PARTIAL REFLECTED CEILING PLANS
16 OF 76 A-201 EXTERIOR BUILDING ELEVATIONS
17 OF 76 A-202 EXTERIOR BUILDING ELEVATIONS
18 OF 76 A-203 EXTERIOR BUILDING ELEVATIONS
19 OF 76 A-204 EXTERIOR BUILDING ELEVATIONS
20 OF 76 A-301 BUILDING CROSS SECTIONS
21 OF 76 A-302 BUILDING CROSS SECTIONS AND DETAILS
22 OF 76 A-401 ENLARGED PLANS
23 OF 76 A-402 CASEWORK DETAILS
24 OF 76 A-501 PARTITION TYPES
25 OF 76 A-601 DOOR AND WINDOW SCHEDULE AND DETAILS
26 OF 76 A-602 DOOR AND WINDOW DETAILS
27 OF 76 I-101 AREA 'A' - FINISH PLAN
28 OF 76 I-102 FINISH SCHEDULE & DETAILS
29 OF 76 I-121 AREA 'A' - SIGNAGE PLAN
30 OF 76 I-122 SIGNAGE SCHEDULE & DETAILS
31 OF 76 F-001 GENERAL NOTES, ABBREVIATIONS
32 OF 76 F-002 CODE SUMMARY
33 OF 76 FL100 LIFE SAFETY PLAN - OVERALL
34 OF 76 FL101 LIFE SAFETY PLAN - AREA 'A'
35 OF 76 FL102 LIFE SAFETY PLAN - AREA 'B'
36 OF 76 FD100 FIRE ALARM DEMOLITION
37 OF 76 FD101 FIRE SPRINKLER DEMOLITION
38 OF 76 FD501 FIRE SPRINKLER DEMO DETAILS
39 OF 76 FA100 FIRE ALARM PLAN - OVERALL
40 OF 76 FA101 FIRE ALARM PLAN - AREA 'A'
41 OF 76 FA102 FIRE ALARM PLAN - AREA 'B'
42 OF 76 FA500 FIRE ALARM DETAILS
43 OF 76 FA501 FIRE ALARM INPUT/OUTPUT MATRIX
44 OF 76 FX100 FIRE SPRINKLER PLAN - OVERALL
45 OF 76 FX101 FIRE SPRINKLER PLAN - AREA 'A'
46 OF 76 FX102 FIRE SPRINKLER PLAN - AREA 'B'
47 OF 76 FX401 ENLARGED FIRE PUMP ROOM
48 OF 76 FX501 SPRINKLER DETAILS
49 OF 76 M-001 MECHANICAL GENERAL NOTES AND LEGEND
50 OF 76 M-101 OVERALL HVAC PLAN - AREA 'A'
51 OF 76 M-111 AREA 'A' - PARTIAL MECHANICAL PLANS
52 OF 76 M-501 MECHANICAL DETAILS
53 OF 76 M-601 MECHANICAL SCHEDULES
54 OF 76 M-801 MECHANICAL CONTROLS
55 OF 76 M-802 MECHANICAL CONTROLS
56 OF 76 P-001 PLUMBING SCHEDULES, GENERAL NOTES, AND LEGEND
57 OF 76 P-101 OVERALL PLUMBING PLAN
58 OF 76 P-111 PARTIAL PLUMBING PLANS
59 OF 76 P-501 PLUMBING DETAILS
60 OF 76 P-901 PLUMBING RISER DIAGRAM
61 OF 76 E-001 LEGEND, ABBREVIATIONS, AND GENERAL NOTES
62 OF 76 ES101 ELECTRICAL SITE PLAN
63 OF 76 ED101 OVERALL DEMO PLAN - AREA 'A'
64 OF 76 ED102 OVERALL DEMO PLAN - AREA 'B'
65 OF 76 E-101 OVERALL FLOOR PLAN - AREA 'A' - ELECTRICAL
66 OF 76 E-102 OVERALL FLOOR PLAN - AREA 'B' - ELECTRICAL
67 OF 76 E-103 ENLARGED PLANS
68 OF 76 EL111 AREA 'A' - PARTIAL LIGHTING PLANS
69 OF 76 EP111 AREA 'A' - PARTIAL POWER PLANS
70 OF 76 ET111 AREA 'A' - PARTIAL SYSTEMS PLANS
71 OF 76 E-501 ELECTRICAL DETAILS
72 OF 76 E-502 ELECTRICAL DETAILS
73 OF 76 E-503 ELECTRICAL DETAILS
74 OF 76 E-601 PARTIAL SINGLE LINE DIAGRAM AND ELECTRICAL SCHEDULES
75 OF 76 E-602 ELECTRICAL SCHEDULES
76 OF 76 E-603 ELECTRICAL SCHEDULES
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L
ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
G-002
SHEET INDEX
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
01-28-19
A1/
SECONDARY DISICPLINE DESIGNATOR (DISCIPLINE)
- - NONE
A - FIRE DETECTION & ALARM (FIRE PROTECTION)
- AUDIO/VISUAL (TELECOMMUNICATIONS)
D - DEMOLITION
I - INFORMATION (GENERAL)
- INTERIORS (ARCHITECTURAL)
G - GRADING (CIVIL)
P - PAVING (CIVIL)
S - SITE (CIVIL AND ELECTRICAL)
U - UTILITIES (CIVIL)
X - FIRE SUPRESSION (FIRE PROTECTION)
LOCATION OF PLAN,
DETAIL, SECTION,
ETC. ON SHEET.
LETTER = ROW, # =
COLUMN
DISCIPLINE
G - GENERAL
V - SURVEY
B - GEOTECHNICAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
I - INTERIORS
F - FIRE PROTECTION
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOMMUNICATIONS
X - OTHER DISCIPLINES
SHEET TYPE DESIGNATOR
0 - GENERAL
1 - PLANS
2 - SECTIONS
3 - ELEVATIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES AND DIAGRAMS
7 - USER DEFINED
8 - USER DEFINED
9 - 3D/ISOMETRIC
SHEET NUMBER WITHIN SERIES
(NOTE: SHEETS MAY NOT BE
SEQUENTIALLY NUMBERED)
PLAN NORTH
X
XXX
EXTERIOR
ELEVATION
INDICATES ADDITIONAL
NOTE SIM, MIR, TYP
INDICATES ELEVATION
NO.
INDICATES SHEET NO.
ELEVATION LOCATION
INTERIOR
ELEVATION
XX-XXX
XX
INDICATES ELEVATION NO.
ELEVATION LOCATION IF ON
DIFFERENT SHEET
XX
XX-XXX
XX
XX-XXX
XX
XX-XXX
XXX XXX
BUILDING
SECTION
XX
XX-XXX
XXX
INDICATES ADDITIONAL NOTE SIM,
MIR, TYP
INDICATES SECTION NO.
INDICATES SHEET NO.
XX
XX-XXX
XXX
INDICATES ADDITIONAL
NOTE SIM, MIR, TYP
INDICATES DETAIL NO.
INDICATES SHEET NO.
DETAIL LOCATION
SECTION
DETAIL
DETAIL
NORTH ARROW W/
TRUE NORTH
INDICATION
RM NAME
538 SF
ROOM NAME
ROOM NUMBER
SQUARE FT ACTUAL
XX
XX
XX
WINDOW
TYPE
WALL TYPE
KEYNOTE
GRID / COLUMN LINE
DESIGNATOR
X
EQUIPMENT NUMBER
DOOR NUMBER
FINISH FLOOR
100'-0"
ELEVATION REF.
SYMBOL
SPOT ELEVATION
REVISION
TAG1
NUMBERING SYSTEM ANNOTATION CALLOUTS/DRAWING SYMBOLS
1. THESE NOTES APPLY TO THE WORK OF ALL TRADES, CONTRACTORS AND SUBCONTRACTORS
SHOWN ON THE DRAWINGS.
2. THE TERM CONTRACTOR SHALL BE CONSIDERED TO REFER TO THE GENERAL CONTRACTOR AND
ALL SUBCONTRACTORS.
3. CONTRACTORS SHALL COMPLY WITH THE REQUIREMENTS OF THE SPECIFICATIONS, AMENDMENTS, ADDENDA, RFI'S AND OTHER CONTRACT MODIFICATIONS. IN THE EVENT OF A CONTRADICTION
BETWEEN THE DRAWINGS AND SPECIFICATIONS THE REQUIREMENTS OF THE SPECIFICATIONS,
AMENDMENTS, ADDENDA, RFI'S AND OTHER CONTRACT REQUIREMENTS SHALL TAKE PRECEDENCE.
4. ALL WORK IS NEW AND TO BE PROVIDED BY THE CONTRACTOR, UNLESS OTHERWISE NOTED.
5. CONTRACTOR SHALL COORDINATE ALL TRADES AND WORK INCLUDING BUT NOT LIMITED TO
STRUCTURAL MEMBERS, MECHANICAL PIPING, DUCTWORK, SPRINKLER PIPING, CONDUITS, ROOF
DRAINS, LIGHTING AND EQUIPMENT.
6. DETAILS SHOWN ON THE DRAWINGS ARE TO BE CONSIDERED TYPICAL FOR ALL SIMILAR
CONDITIONS.
7. DRAWING NOTES, DIMENSIONS AND SPECIFICATIONS ARE INSTRUCTIONS THAT GENERALLY APPLY
TO ALL WORK UNLESS MORE SPECIFIC INFORMATION IS SHOWN ELSEWHERE ON THE DRAWINGS
OR IN THE SPECIFICATIONS. IN THE EVENT OF CONFLICTING INSTRUCTIONS THE DOR SHALL
DETERMINE WHAT CONTROLS.
8. FIRE RATED, ACOUSTICALLY RATED OR SECURITY RATED ASSEMBLIES SHALL NOT BE
INTERRUPTED BY LESSER RATED OR NON-RATED WALLS. CONTRACTOR TO MAINTAIN CONTINUITY
OF HIGHER RATED WALL AND CEILING ASSEMBLIES.
9. COORDINATE DIMENSIONS SHOWN ON THE DRAWINGS WITH FABRICATION AND FIELD CONDITIONS
AND REPORT ANY INCONSISTENCIES TO THE ARCHITECT BEFORE PROCEEDING WITH WORK.
10. SUSPENDED CEILING SYSTEMS, MECHANICAL EQUIPMENT, DUCTWORK, PIPING, ELECTRICAL FIXTURES, AND OTHER EQUIPMENT SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE ABOVE.
X
X-XXX
ELEVATION NUMBER
REFERRING SHEET NUMBER
DIRECTION LOOKING
XXX
A - 101
A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 2 20.
B. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
C. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL REQUIRE
EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE OHIO EPA PRIOR TO ANY
SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM KAREN BEASON BY EMAIL
AT KAREN.BEASON@US.AF.MILKAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR
ADDITIONAL INFORMATION.
D. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED DUST
SUPPRESSING METHODS SUCH AS WATER SPRAYS ON AREA OF HIGH DUST GENERATION. FOR
ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH. CHRIS
CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL
E. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 02 09 10
F. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY HAZARDOUS
WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE PROPERLY CHARACTERIZED,
LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE CONTRACTOR WITH KNOWLEDGE OF THE
ACTIVITY / PROCESS WHERE THE WASTE WAS GENERATED. ALL HAZARDOUS WASTE WILL BE TURNED OVER TO THE GOV’T FOR DISPOSAL. IN ADDITION PROPER COORDINATION IS NEEDED WITH 88
CEG/CEIEC. QUESTIONS CONCERNING THE REQUIREMENTS FOR STORAGE AND DISPOSAL OF ANY
HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88 CEG/CEIEC HAZARDOUS MATERIALS PM, MIKE VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) OR 88 CEG/CEIEC HAZARDOUS WASTE PM, EMILY ERDEI (937-257-0023 OR GARY.SELBY@US.AF.MIL).
G. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 01 02 20.
H. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER. THE WPAFB
RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL. ALL
RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING CENTER. ALL RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20. CONTACT
WPAFB RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM WHAT MATERIALS ARE
RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A QUARTERLY
SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB SPECIFICATION
SECTION 01 02 20 STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO MULCH AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED, (4) THE COST FOR
WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS
CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7) EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE THREE MONTHS PRIOR. THE
QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB DIVERSION FORM. FOR ADDITIONAL
INFORMATION CONTACT THE RECYCLING PM, DAVE DALTON, AT 937-257-5060 OR DAVID.DALTON.2
@US.AF.MILDAVID.DALTON.2@US.AF.MIL.
I. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR RECYCLING.
J. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
K. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20
L. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
M. 30 DAYS PRIOR TO START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE SAMPLE OF
THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY INTO THE
SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH OF THE
FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY, MOLYBDENUM, NICKEL, SILVER, ZINC AND SULFIDE. THE LAB PERFORMING THE ANALYSES MUST BE CERTIFIED BY OHIO EPA
TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF THE LAB’S REPORT TO THE
CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88 CEG/CEIEA FOR A DETERMINATION ON
THE WASTEWATER DISPOSAL METHOD.
N. COORDINATE DISPOSITION OF EXCESS RADIOACTIVE COMMODITIES, E.G. IONIZATION TYPE SMOKE
DETECTORS, RADIOLUMINESCENT EMERGENCY EXIT SIGNS, OR ANY OTHER RADIOACTIVE
COMMODITY AND/OR RADIOACTIVE CONTAMINANT THROUGH THE INSTALLATION RADIATION SAFETY
OFFICER, 88 AMDS/SGPB
O. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING ASBESTOS
UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
G-003
GENERAL NOTES & SYMBOLS - VICINITY MAP
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
GENERAL NOTES:
ENVIRONMENTAL NOTES:
CONSTRUCTION ACCESS HAUL ROUTE AND LAYDOWN AREAVICINITY MAP
PROJECT SITE
BUILDING 30257
PROJECT SITE
BUILDING 30257
LAYDOWN AREA
CONSTRUCTION
ACCESS HAUL ROUTE
GATE 1A
CB
C I
C I
CB
S
CBCB
CB
CB
C
FH
S
C
CB
CB
D
CB
C
D
CB
S
CB
FH
D
CI
E
S
D
D
FH
CB
CB
S
CI
D
FH
C
I
CB
C
E
CB
C
FH
CB
MAGNAIL
C
O
C
O
D
E
MAGNAIL
FFE
832.02
CB
FFE
831.85
C
U x
C U x
C U x
CU
x
CU
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
SS
x
SS
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
S D x
S D x x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
SD
x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
S S x
S
SSS
S S
S
SSS
S S
S S
S S
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
E x
E x
E x
E x
SD
x
SD
x
S S x
SD
xSD x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S S x
S
D x
BUILDING 257
BUILDING 258
STM MH RIM 828.69
INV. 12" RCP (N&E) 826.04
STM CB TOP 826.04
INV. 15" RCP 823.04
SAN MH RIM 828.20
INV. 8" VCP (SW&NE) 816.0
6" CIP (NW) ABANDONED
INV. 6" CIP (N) 825.97
STM CB TOP 828.26
INV. 18" CMP (SW&NE) 822.61
INV. 6" CIP (N) 823.46
INV. 6" CIP (SE) 823.41
SAN MH RIM 828.22
INV. 12" VCP (NE&SW) 814.52
INV. 6" VCP (NE) 822.97
INV. 6" VCP (SE) 814.92
STM CB TOP 828.23
INV. 24" VCP (NW) 822.13
INV. 18" VCP (NE,W,SE) 822.13
STM CB TOP 827.57
INV. 24" VCP (NW&SE) 821.47
INV. 18" VCP (NE) 821.47
8" WL
SAN MH RIM 828.79
INV. 12" VCP (SW) 814.74
INV. 12" VCP (NE) 814.78
INV. 8" VCP (NW) 824.17
6" WL
SAN MH RIM 829.45
INV. 12" VCP (SW) 815.6
INV. 12" VCP (NE) 815.62
INV. 8" VCP (NW) 823.53
STM CB TOP 829.28
INV. 6" PVC 828.51
STM CB BTM 827.98
8" WL
STM MH RIM 828.95
INV. 15" RCP (NW) 821.55
INV. 10" VCP (N) 821.73
INV. 24" VCP (NE) 822.03
INV. 10" VCP (SE) 822.45
INV. 30" VCP (SW) 821.54
INV. 10" VCP (NW) 822.2
STM CB TOP 828.79
INV. 30" VCP (SW&NE) 821.24
STM MH RIM 828.44
INV. 36" VCP (SW) 820.34
INV. 36" VCP (NE) 820.39
INV. 6" VCP (SE) 822.54
INV. 6" VCP (S) 820.64
SAN MH RIM 829.24
(COULD NOT OPEN)
6" WL
STM CB TOP 828.06
INV. 18" CMP (SW) 823.31
INV. 15" CMP (NE) 823.36
INV. 6" CIP (N) 824.16
INV. 6" CIP (SE) 824.16
STM CB TOP 828.03
INV. 15" CMP (SW&NE) 823.83
INV. 6" CIP (N) 824.66
INV. 6" CIP (SE) 824.66
BUILDING 208
BUILDING 247
CHASE STREET
A L
B R
O O
K
D
R I V
E
EXISTING CONDITIONS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BY
NO.
DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C
I
V
I
L
EN
G
I
N
E
E
R
US AF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
CONSOLIDATE PDF TO F/30257
31 JAN 19
FINAL DESIGN SUBMITTAL
ZHTV10100629
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'
A. REFER TO C-001 FOR GENERAL NOTES AND LEGEND
GENERAL NOTES:
V-101
EXISTING CONDITIONS
V-101
A. METZLER N. PERCEL S. SCHULTZ
DATE REVISION BY
NO.
DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C
I
V
I
L
EN
G
I
N
E
E
R
US AF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
CONSOLIDATE PDF TO F/30257
31 JAN 19
FINAL DESIGN SUBMITTAL
ZHTV10100629
XXX
XXX
T
E
C
C
E
MW
G
E
G x
X
LEGEND
NEWEXISTING
POST/BOLLARD
SIGN
BUMPER BLOCK
SATELLITE DISH
TRAFFIC CONTROL BOX
UNKNOWN MANHOLE
STORM SEWER
STORM SEWER MANHOLE
CATCH BASIN
CATCH BASIN WITH DOME GRATE
TRENCH DRAIN
SANITARY SEWER
SANITARY SEWER MANHOLE
WATER LINE
WATER MANHOLE
WATER VALVE
WATER LINE MARKER
FIRE HYDRANT
MONITORING WELL
STEAM LINE
STEAM PIT
GAS LINE
GAS METER
GAS VENT
GAS MARKER
COMMUNICATIONS/TELEPHONE LINE
TELEPHONE MANHOLE
COMMUNICATIONS MANHOLE
TELEPHONE PEDESTAL
COMMUNICATIONS VAULT
ELECTRIC LINE
ELECTRIC MANHOLE
ELECTRIC PULLBOX
ELECTRIC METER
UTILITY POLE
DECIDUOUS TREE
CONIFEROUS TREE
BUSH
GUARDRAIL
FENCE
MAJOR CONTOUR
MINOR CONTOUR
SOIL BORING
SURVEY CONTROL MONUMENT
SURVEY CONTROL POINT
ABANDONED UTILITY
SECONDARY ELECTRIC LINE
WATER
FIRE WATER
GAS
STORM
SANITARY
ELECTRIC DUCT BANK
CATCH BASIN
STORM MANHOLE
HEADWALL
SANITARY MANHOLE
FIRE HYDRANT
CLEAN OUT
METER
SETBACK - AT/FP STANDOFF
WATER VALVE
GAS VALVE
POST INDICATOR VALVE
CASING PIPE
BOLLARDS
WORK LIMITS
MAJOR CONTOUR
MINOR CONTOUR
GRADE BREAKLINE
TEMPORARY FENCE
DEMOLISH UTILITY
SILT FENCE
CATCH BASIN INLET PROTECTION
SURFACE DRAINAGE PATTERN
UNDERDRAIN
XXX
XXX
CU
x
E x
ABBREVIATIONS
EX
TYP
FFE
STM
CB
MH
UD
INV
GRT
TC
SAN
WM
WS
FH
UG
ELEC
COMM
UNK
CP
R
HP
LP
EOP
CIP
EXISTING
TYPICAL
FINISHED FLOOR ELEVATION
STORM SEWER
CATCH BASIN
MANHOLE
UNDERDRAIN
INVERT
GRATE
TOP OF CASTING
SANITARY SEWER
WATER MAIN
WATER SERVICE
FIRE HYDRANT
UNDERGROUND
ELECTRIC
COMMUNICATION
UNKNOWN
CONTROL POINT
RADIUS
HIGH POINT
LOW POINT
EDGE OF PAVEMENT
CAST IRON PIPE
X X X XX X X XX X X X
SF
ES
x
UD
UM
D
W
S
SS
x
W x
SD
x
W
G
S
E
SD
CO
M
SS
F
HORIZONTAL AND VERTICAL CONTROL POINTS FOR THIS PROJECT ARE SHOWN IN THE PLANS. ALL ELEVATIONS ARE FOR PROJECT USE ONLY AND ARE BASED ON
VERTICAL DATUM NAVD 88 AND OHIO STATE PLANE SOUTH ZONE HORIZONTAL DATUM NAD 83 (SURVEY FEET).
CONTRACTOR SHALL FIELD VERIFY DEPTH AND LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION AND SHALL PROTECT ALL EXISTING UTILITIES
DURING CONSTRUCTION. UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION AND MAY NOT REFLECT THE ACTUAL FIELD
CONDITIONS OR LOCATIONS OF UNDERGROUND STRUCTURES OR EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING
UTILITIES AS IT PERTAINS TO WORK ON THIS CONTRACT. CONTRACTOR SHALL PROCESS AN AF FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST, TWO WEEKS IN ADVANCE OF REQUIRED ON-SITE CLEARANCE DATE.
THE CONTRACTOR IS RESPONSIBLE FOR IMMEDIATE REPAIR OF EXISTING PROJECT SITE UTILITY LINES DAMAGED DURING CONSTRUCTION. REPAIRS SHALL BE
MADE TO THE SATISFACTION OF THE APPROPRIATE AFFECTED GOVERNMENT ENTITY OR UTILITY OWNER.
ITEMS MARKED "ODOT" SHALL CONFORM TO OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIALS SPECIFICATIONS 2016 AND CURRENT
STANDARD DRAWINGS. COPIES OF THE ODOT SPECIFICATIONS BOOK AND STANDARD DRAWINGS MAY BE PURCHASED FROM:
OHIO DEPARTMENT OF TRANSPORTATION
OFFICE OF CONTRACTS
P.O. BOX 899
COLUMBUS, OHIO 43216-0899
THE ODOT SPECIFICATIONS AND STANDARD DRAWINGS MAY ALSO BE DOWNLOADED FROM THE FOLLOWING INTERNET SITE, WWW.DOT.STATE.OH.US
THE UNIT PRICE CLAUSES OF THE ODOT SPECIFICATIONS WILL NOT APPLY FOR THIS PROJECT.
THE CONTRACTOR SHALL REPAIR ANY DISTURBED AREAS TO PRE-CONSTRUCTION CONDITION. THESE AREAS INCLUDE LANDSCAPED AREAS, NORMAL GRASS
AREAS, CURBS, ROADS, ETC. THESE AREAS SHALL BE REPAIRED USING SIMILAR TO EXISTING MATERIALS AND AS APPROVED BY WPAFB.
THE SITE SHALL BE KEPT CLEAN AND NEAT AT ALL TIMES. THE CONTRACTOR SHALL TAKE STEPS TO PROHIBIT ANY DIRT/MUD FROM BEING TRACKED ONTO THE
ROADWAYS.
THE CONTRACTOR SHALL MAINTAIN, RELOCATE OR REPLACE EXISTING BASE MONUMENTS, WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO
PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER AND AT THE CONTRACTOR'S EXPENSE.
CONTRACTOR MUST NOTIFY COMMUNICATION SQUADRON (CS/SCMO) PRIOR TO REMOVING ANY COMMUNICATIONS EQUIPMENT (FIBER OPTIC, COPPER CABLE, ETC.)
OR IF ANY TYPE OF COMMUNICATIONS EQUIPMENT SHOULD NEED TO BE RELOCATED BECAUSE OF CONSTRUCTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE NORMAL OPERATING FUNCTIONS OF ALL UTILITY SYSTEMS SERVING OTHER FACILITIES
THROUGH THE CONSTRUCTION SITE DURING THE ENTIRE DURATION OF THE PROJECT.
SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB
LESS THAN AN ACRE OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A
NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM KAREN BEASON BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT
937-257-5899 FOR ADDITIONAL INFORMATION.
NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
GENERAL NOTES:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
S
C-001
CIVIL GENERAL NOTES & LEGEND
CB
C I
C I
CB
S
CBCB
CB
CB
C
FH
S
C
CB
CB
D
CB
C
D
CB
S
CB
FH
D
CI
E
S
D
D
FH
CB
CB
S
CI
D
FH
C
I
CB
C
E
CB
C
FH
CB
MAGNAIL
C
O
C
O
D
E
MAGNAIL
FFE
832.02
CB
FFE
831.85
C
U x
C U x
C U x
CU
x
CU
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
SS
x
SS
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
S D x
S D x x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
SD
x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x S
S x
S
SSS
S S
S
SSS
S S
S S
S S
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
E x
E x
E x
E x
SD
x
SD
x
S S x
SD
xSD x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S S x
S
D x
BUILDING 257
BUILDING 258
STM MH RIM 828.69
INV. 12" RCP (N&E) 826.04
STM CB TOP 826.04
INV. 15" RCP 823.04
SAN MH RIM 828.20
INV. 8" VCP (SW&NE) 816.0
6" CIP (NW) ABANDONED
INV. 6" CIP (N) 825.97
STM CB TOP 828.26
INV. 18" CMP (SW&NE) 822.61
INV. 6" CIP (N) 823.46
INV. 6" CIP (SE) 823.41
SAN MH RIM 828.22
INV. 12" VCP (NE&SW) 814.52
INV. 6" VCP (NE) 822.97
INV. 6" VCP (SE) 814.92
STM CB TOP 828.23
INV. 24" VCP (NW) 822.13
INV. 18" VCP (NE,W,SE) 822.13
STM CB TOP 827.57
INV. 24" VCP (NW&SE) 821.47
INV. 18" VCP (NE) 821.47
8" WL
SAN MH RIM 828.79
INV. 12" VCP (SW) 814.74
INV. 12" VCP (NE) 814.78
INV. 8" VCP (NW) 824.17
6" WL
SAN MH RIM 829.45
INV. 12" VCP (SW) 815.6
INV. 12" VCP (NE) 815.62
INV. 8" VCP (NW) 823.53
STM CB TOP 829.28
INV. 6" PVC 828.51
STM CB BTM 827.98
8" WL
STM MH RIM 828.95
INV. 15" RCP (NW) 821.55
INV. 10" VCP (N) 821.73
INV. 24" VCP (NE) 822.03
INV. 10" VCP (SE) 822.45
INV. 30" VCP (SW) 821.54
INV. 10" VCP (NW) 822.2
STM CB TOP 828.79
INV. 30" VCP (SW&NE) 821.24
STM MH RIM 828.44
INV. 36" VCP (SW) 820.34
INV. 36" VCP (NE) 820.39
INV. 6" VCP (SE) 822.54
INV. 6" VCP (S) 820.64
SAN MH RIM 829.24
(COULD NOT OPEN)
6" WL
STM CB TOP 828.06
INV. 18" CMP (SW) 823.31
INV. 15" CMP (NE) 823.36
INV. 6" CIP (N) 824.16
INV. 6" CIP (SE) 824.16
STM CB TOP 828.03
INV. 15" CMP (SW&NE) 823.83
INV. 6" CIP (N) 824.66
INV. 6" CIP (SE) 824.66
BUILDING 208
BUILDING 247
CHASE STREET
A L
B R
O O
K
D
R I V
E
CIVIL SITE PLAN
COORDINATOR ENGINEERING CHIEF
DATE REVISION BY
NO.
DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C
I
V
I
L
EN
G
I
N
E
E
R
US AF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
CONSOLIDATE PDF TO F/30257
31 JAN 19
FINAL DESIGN SUBMITTAL
ZHTV10100629
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'
A. SEE C-001 FOR GENERAL NOTES AND LEGEND
B. WATER LINES MUST HAVE 4' MINIMUM COVER
C. THE ELEVATIONS OF THE EXISTING STORM SEWER, ELECTRIC, AND
ABANDONED STEAM TRENCH ALONG THE SANITARY SEWER SERVICE ARE
UNKNOWN. SANITARY SEWER SERVICE SHALL BE ADJUSTED AS NECESSARY
TO AVOID THESE UTILITIES BUT SHALL BE LAID WITH A MINIMUM SLOPE OF 0.5%
AND A MINIMUM OF 4' OF COVER.
D. BOLLARDS SHALL BE ADJUSTED TO AVOID UNDERGROUND UTILITIES.
CONTRACTOR SHALL VERIFY THE LOCATION OF THE UNDERGROUND UTILITIES
PRIOR TO DIGGING.
GENERAL NOTES:
2" DOMESTIC
WATER
33' - 6" SANITARY
SERVICE @ 1.5%
SEE GENERAL NOTE C.
8" FIRE WATER
SERVICE
PIV
SEE DETAIL 05/C-501
SANITARY CLEANOUT
INV. 6" = 825.4
SEE DETAIL 04/C-501
2" GATE VALVE
SEE DETAIL 06/C-501
3 - 4" BOLLARDS
SEE DETAIL
03/C-501 &
07/C-501
CONCRETE
TRANSFORMER PAD
SEE DETAIL 02/C-501
C-101
CIVIL SITE PLAN
CONCRETE
GENERATOR PAD
SEE DETAIL 02/C-501
4 - 4" BOLLARDS
SEE DETAIL 03/C-501 & 07/C-501
C-101
5'
20'
25' 10'
DATE REVISION BY
NO.
DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C
I
V
I
L
EN
G
I
N
E
E
R
US AF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
CONSOLIDATE PDF TO F/30257
31 JAN 19
FINAL DESIGN SUBMITTAL
ZHTV10100629
U.L. LISTED
RESILIENT WEDGE
GATE VALVE
POURED
CONCRETE
THRUST
BLOCKING OR
MECHANICAL
RESTRAINED
JOINTS (TYP.).
V A
R I E
S
FINISHED GRADE
POST INDICATOR
CONCRETE FILL
FINISH GRADE
ROUND OFF TOP
4" DIA. SCHEDULE 80,
STEEL PIPE,
FILL SOLID W/CONC.
PAINT YELLOW AT
EXTERIOR APPLICATIONS
6" (TYP)
18"
FINISH GRADE
COUNTERSUNK PLUG
15" SQUARE CONC.
SLAB 6" THICK
6"x6" WYE (PVC)
6" PLUG
OMIT PLUG WHERE
SEWER JOINS BUILDING
CONNECTION
6" PVC PIPE
6" - 1/8 BEND (PVC)
IF NOT IN PAVEMENT
CAST 10" THICK MINIMUM 3000 PSI
CONCRETE AROUND THE TOP OF
EACH VALVE BOX IN A 1'-6"
SQUARE DISK OR 1'-6" DIA.
CIRCLE.
3 PIECE ADJUSTABLE
VALVE BOX
POURED CONCRETE
THRUST BLOCKING OR
MECHANICAL
RESTRAINED JOINTS
(TYP.).
VALVE
NON-PERFORM CONCRETE RING FOR VALVES WITHIN HARDSTAND OR
ASPHALT PAVEMENTS.
VALVES WITHIN PAVED AREAS SUBJECT TO TRAFFIC LOADS SHALL BE
TRAFFIC RATED.
A.
B.
NOTES:
GROUND
VERTICAL BENDS
STANDARD CONCRETE
BLOCKING AS SHOWN
FOR HORIZONTAL
BENDS BELOW
" THREADED ROD
W/ HEX NUTS
AND 4"x4"x
PLATE WASHER
H SQUARE
2"x
" GALVANIZED
STEEL STRAP
M
I N
D
H
HORIZONTAL BENDS
CONCRETE BLOCKING
H
TRENCH
EDGE OF
H
EDGE OF
TRENCH
UNDISTURBED
EARTH
MINIMUM BEARING AGAINST
TRENCH WALL
TABLE OF DIMENSIONS FOR CONCRETE BLOCKING
NOTE: THRUST BLOCKS NOT REQUIRED WHEN USING RESTRAINED JOINTS
8"
6"
4" & SMALLER 24" 12"
16"24"
48" 24" 18"
18"
12" 18"
18"
24" 7.2
3.5
2.3 24"
30"
54" 32"
16"
12" 12"
18"
24" 18"
18"
18" 2.3
4.1
10.3 24"
24"
18"
18"
10"
8" 12"
16"
21" 18"
18"
18" 1.6
3.2
4.6 24"
24"
18" 8"
10"
18" 21"
16"
12" 18"
18"
18" 4.6
3.2
1.6 18"
24"
24" 18"
10"
8" 12"
16"
21" 18"
18"
18" 1.6
3.2
4.6 8"
6"
PIPE
CU.
FT.
DV
HH
FT.
CU.
DV
H
H
FT.
CU.
DVH
H
FT.
CU.
DV
H
H
FT.
CU.
DV
45° BENDS90° BENDS
° BENDS
° BENDS SIZE
& CROSSES
TEES,PLUGS
SIZE
PIPE H
H
4" & SMALLER
PAVED AREA (CONCRETE OR ASPHALT)
M
I N
3' (TYP) 3' (TYP)
HYDRANT OR
PIV VALVE
4" BOLLARD
(TYP)
M
A X
NOTE:
ADJUST BOLLARDS AS REQUIRED TO AVOID UTILITIES,
OBSTRUCTIONS, ETC.
OUTLINE OF EQUIPMENT
6" TYPICAL 4 SIDES
45 CHAMFER
GRADE
6 x 6 W2.1 x W2.1
WELDED WIRE FABRIC
#4 CONT.
NOTES:
1. FINAL OVERALL DIMENSIONS
SHALL BE DETERMINED BY THE
SIZE OF EQUIPMENT TO BE
INSTALLED.
2. PROVIDE CONTRACTION JOINTS
AT 10' INTERVALS.
3. PROVIDE EXPANSION JOINTS
WHERE PADS ABUT BUILDING OR
OTHER CONCRETE.
4. SEE SPECIFICATION 03 30 53 FOR
CONCRETE.
6"
MIN.
M I N
8"
4"
8" SUBGRADE
CONSTRUCTION
4" AGGREGATE BASE - ODOT 304
8" CONCRETE
C-501
CIVIL DETAILS
BOLLARD PLACEMENT03
C-501
NTS
CONCRETE PAD02
C-501
NTS
THRUST BLOCKING01
C-501
NTS
CLEANOUT04
C-501
NTS
POST INDICATOR VALVE05
C-501
NTS
VALVE BOX SETTING06
C-501
NTS
BOLLARD - 4"07
C-501
NTS
A. METZLER T. BARDEN S. SCHULTZ
LBP-03
LBP-02
LBP-05
LBP-06
LBP-04
LBP-01
LBP-07
PCB-02
PCB-01
01A
10C
10B 01C 10A
01B
11A 11B 11C
09B
06C
05B
09C 02C 03C
04A 04B 04C
06B 03B 02B
05A
06A09A
05C 08A 07A
08B 07B
08C 07C
03A 02A
12B 12A 12C
13B 13A 13C
14A 14B 14C
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C
I
V
I
L
EN
G
I
N
E
E
R
US AF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
H100
F/30257
S. KELLEY J. MCKINNEY J. WATROUS
PROJECT ZHTV10100629
LEGEND:
NON-ACM SAMPLE LOCATION
LEGEND:
NON-ACM SAMPLE LOCATION
SAMPLE CONTAINING ANY
CONCENTRATION OF ASBESTOS
NON-PCB SAMPLE LOCATION
NON-LBP SAMPLE LOCATION
LBP SAMPLE LOCATION
AREA NOT INCLUDED IN SCOPE
23B
PCB-05
LBP-05
12C
LBP-06
HAZARDOUS MATERIALS SURVEY
SAMPLE LOCATION MAP
NOTES
1. ALL WORK SHALL BE PERFORMED IN
ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 01 02 20.
2. NO ASBESTOS-CONTAINING MATERIAL SHALL
BE INSTALLED DURING THIS PROJECT.
3. SOIL DISTURBANCE DURING THIS PROJECT,
INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR
PROJECTS THAT DISTURB LESS THAN AN ACRE
OF SOIL, AN EROSION CONTROL PLAN IS
REQUIRED PRIOR TO SOIL DISTURBANCE. FOR
PROJECTS THAT DISTURB MORE THAN AN
ACRE, A NOTICE OF INTENT (NOI) MUST BE
APPROVED BY THE OHIO EPA PRIOR TO ANY
SOIL BEING DISTURBED AS WELL AS A STORM
WATER POLLUTION PREVENTION PLAN (SWPPP)
APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT
THE 88 CEG/CEIEA WATER PM KAREN BEASON
BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY
PHONE AT 937-257-5899 FOR ADDITIONAL
INFORMATION.
4. THE GENERATION OF FUGITIVE EMISSIONS
MUST BE KEPT TO A MINIMUM USING APPROVED
DUST SUPPRESSING METHODS SUCH AS
WATER SPRAYS ON AREA OF HIGH DUST
GENERATION. FOR ADDITIONAL INFORMATION
PLEASE CONTACT THE 88 CEG/CEIEA AIR PM
CHRIS TUMBUSCH. CHRIS CAN BE REACHED AT
937-257-2455 OR BY EMAIL AT
CHRISTOPHER.TUMBUSCH@US.AF.MIL.
5. RECOVER AND RECLAIM ANY REFRIGERANT IN
ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 02 09 10.
6. ALL HAZARDOUS MATERIALS MUST BE
PROPERLY MANAGED, LABELED AND STORED.
ANY HAZARDOUS WASTE GENERATED FROM
THIS CONSTRUCTION ACTIVITY MUST BE
PROPERLY CHARACTERIZED, LABELED AND
MANAGED BY TRAINED EMPLOYEE OF THE
CONTRACTOR WITH KNOWLEDGE OF THE
ACTIVITY / PROCESS WHERE THE WASTE WAS
GENERATED. ALL HAZARDOUS WASTE WILL BE
TURNED OVER TO THE GOV'T FOR DISPOSAL. IN
ADDITION PROPER COORDINATION IS NEEDED
WITH 88 CEG/CEIEC. QUESTIONS CONCERNING
THE REQUIREMENTS FOR STORAGE AND
DISPOSAL OF ANY HAZARDOUS MATERIALS CAN
BE ADDRESSED BY THE 88 CEG/CEIEC
HAZARDOUS MATERIALS PM, MIKE VAUGHN,
(937-257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL) OR 88
CEG/CEIEC HAZARDOUS WASTE PM, EMILY
ERDEI (937-257-0023 OR
GARY.SELBY@US.AF.MIL).
7. ANY LEAD CONTAINING PAINT CONTROL
MEASURES SHALL BE PERFORMED IN
ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 01 02 20.
8. ALL METAL AND WIRING SHALL BE RECYCLED
AT THE WPAFB BASE RECYCLING CENTER. THE
WPAFB RECYCLING CENTER IS AVAILABLE FOR
CONTRACTOR USE TO REDUCE WASTE
DISPOSAL. ALL RECYCLABLE METAL IS TO BE
RECYCLED THROUGH THE BASE RECYCLING
CENTER. ALL RECYCLING MUST BE
ACCOMPLISHED IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20. CONTACT
WPAFB RECYCLING PROGRAM MANAGER AT
937-257-5060 TO CONFIRM WHAT MATERIALS
ARE RECYCLABLE AND TO COORDINATE
TURN-IN. THE CONTRACTOR SHALL SUBMIT A
QUARTERLY SUMMARY REPORT TO THE
GOVERNMENT CONTRACT REPRESENTATIVE
IAW WPAFB SPECIFICATION SECTION 01 02 20
STATING (1) THE COST TO RECYCLE AND THE
TONNAGE OF CONSTRUCTION AND DEMOLITION
MATERIALS RECYCLED, (2) THE COST TO
DIVERT/REUSE THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS
DIVERTED/REUSE, (3) THE COST TO MULCH AND
THE TONNAGE AND COST OF CONSTRUCTION
AND DEMOLITION MATERIALS MULCHED, (4) THE
COST FOR WASTE-TO-ENERGY AND THE
TONNAGE OF CONSTRUCTION AND DEMOLITION
MATERIALS CONVERTED FROM
WASTE-TO-ENERGY, (5) THE COST TO LANDFILL
AND THE TONNAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS LAND-FILLED, (6) THE
COST TO INCINERATE AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS
INCINERATED, AND (7) EXPLANATION OF THE
DIVERSION RATE IF LESS THAN 60%. THE
QUARTERLY SUMMARY REPORTS SHALL BE
RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND
JANUARY 7 COVERING THE THREE MONTHS
PRIOR. THE QUARTERLY SUMMARY REPORTS
SHALL BE ON THE WPAFB DIVERSION FORM.
FOR ADDITIONAL INFORMATION CONTACT THE
RECYCLING PM, DAVE DALTON, AT 937-257-5060
OR DAVID.DALTON.2@US.AF.MIL.
9. TURN-IN ALL MERCURY CONTAINING DEVICES,
SWITCHES AND THERMOSTATS TO 88 CEG/CEIE
IN ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 01 02 20 FOR RECYCLING.
10. TURN-IN ALL MERCURY CONTAINING LAMPS TO
88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
11. TURN-IN ALL PCB CONTAINING LIGHT BALLAST
TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
12. REMOVE AND DISPOSE OF ANY ASBESTOS
CONTAINING MATERIAL IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 01 02 20.
13. 30 DAYS PRIOR TO START OF WORK, THE
CONTRACTOR SHALL TAKE A REPRESENTATIVE
SAMPLE OF THE HVAC SYSTEM WATER TO
DETERMINE WHETHER IT CAN BE DRAINED
DIRECTLY INTO THE SANITARY SEWER.
ANALYZE THE WATER TO DETERMINE THE
TOTAL LEVEL OF EACH OF THE FOLLOWING:
CADMIUM, CHROMIUM, COPPER, CYANIDE,
LEAD, MERCURY, MOLYBDENUM, NICKEL,
SILVER, ZINC AND SULFIDE. THE LAB
PERFORMING THE ANALYSES MUST BE
CERTIFIED BY OHIO EPA TO ANALYZE FOR
THESE PARAMETERS. PROVIDE A COPY OF THE
LAB'S REPORT TO THE CONTRACTING OFFICER,
WHO WILL IN TURN FORWARD IT TO 88
CEG/CEIEA FOR A DETERMINATION ON THE
WASTEWATER DISPOSAL METHOD.
14. COORDINATE DISPOSITION OF EXCESS
RADIOACTIVE COMMODITIES, E.G. IONIZATION
TYPE SMOKE DETECTORS, RADIOLUMINESCENT
EMERGENCY EXIT SIGNS, OR ANY OTHER
RADIOACTIVE COMMODITY AND/OR
RADIOACTIVE CONTAMINANT THROUGH THE
INSTALLATION RADIATION SAFETY OFFICER, 88
AMDS/SGPB.
15. ALL WINDOW AND DOOR FRAME CAULKING AND
GLAZING WILL BE TREATED AS CONTAINING
ASBESTOS UNLESS TESTING PROVES IT TO BE
ASBESTOS FREE.
31 JAN 19
FINAL DESIGN SUBMITTAL
P
L
A
N
N
O
R
T
H
NTS
H100
SITE PLAN
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED
INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GWB GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASHSHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
A. ALL MATERIALS AND SHAPES INDICATED ARE CONTINUOUS UNLESS SPECIFICALLY NOTED
OTHERWISE.
B. DETAILS, NOTES, AND/OR SCHEDULES MAY SHOW SELECTED REQUIRED FASTENER TYPES,
SIZES, AND LOCATIONS. WHERE FASTENERS ARE SO DETAILED OR SCHEDULED, SUCH
FASTENING SHALL NOT BE CONSIDERED A COMPLETE REPRESENTATION OF ALL FASTENING
REQUIRED.
C. SECURE ALL NEW CONSTRUCTION WITH FASTENERS OF ADEQUATE SIZE, TYPE, AND PROPER
SPACING TO ENSURE THAT ALL MATERIALS WILL REMAIN SECURELY FIXED IN POSITION AS
SHOWN.
D. WHERE ACCESSORY MATERIALS ARE DETAILED, NOTED, OR SPECIFIED AND NO EXTENT OF USE
IS INDICATED, PROVIDE ACCESSORY MATERIALS WHEREVER USE IS POSSIBLE.
E. INSTALL NEW CONSTRUCTION USING MATERIALS, TYPE, AND METHOD OF ANCHORAGE IN SUCH A
WAY AS TO PROVIDE FOR EXPANSION AND CONTRACTION.
F. REFER TO ABBREVIATION LIST FOR DEFINITION OF ABBREVIATIONS. WHEN AN ABBREVIATION IS
USED BUT NOT LISTED IN THE ABBREVIATION LIST OR FOUND IN THE SPECIFICATIONS, THE
INDUSTRY STANDARD DEFINITION APPLICABLE TO THE CONTEXT SHOULD BE USED.
G. DETAILS MAY BE EXPLODED (I.E. MATERIALS SEPARATED FOR CLARITY) TO SHOW DESIGN INTENT.
H. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT, IN A TIMELY MANNER TO
AVOID DELAYS, BEFORE CONTINUING WITH CONSTRUCTION.
I. DIMENSIONS SHOWN ARE FINISH FACE TO FINISH FACE, UNLESS NOTED OTHERWISE.
J. ALL SPOT ELEVATIONS ARE ABOVE FINISHED FLOOR.
K. ALL TYPICAL INTERIOR STUDS TO BE MIN 20 GA BY WIDTH INDICATED ON PARTITION TYPES
DRAWINGS . GAUGE, FLANGE SIZE, AND SPACING TO BE PER MANUFACTURER'S SPECIFIC LOAD
TABLE, BASED ON 5 PSF LATERAL LOAD (UNO), FOR MAXIMUM VERTICAL SPAN.
L. INSTALL CONTROL JOINTS IN GYPSUM BOARD WALLS AND CEILINGS PER SPECIFICATION SECTION 09 29 00 AND WHERE INDICATED IN GA-216, PARAGRAPHS 4.7.3.1-4.7.4 OR ASTM C840, SYSTEM XIII, PARAGRAPHS 20.3.1-20.3.7.
M. EXTEND ALL SMOKE AND FIRE RATED PARTITIONS TO DECK ABOVE. FILL ALL VOIDS WITH SEALANT
AS REQUIRED AND CAULK CONTINUOUS FOR A SMOKETIGHT SEAL.
N. ALL DOORS TO BE INSTALLED 4" FROM HINGE SIDE OF WALL TO EDGE OF DOOR FRAME, UNLESS
NOTED OTHERWISE.
O. CEILING HEIGHTS IDENTIFIED ARE MINIMUM AND SHALL BE MAINTAINED, UNLESS OTHERWISE
NOTED.
P. CONTRACTOR SHALL PREPARE ALL WALLS AND PARTITIONS TO RECEIVE THE FINISHES SPECIFIED
AS RECOMMENDED BY THE FINISH MANUFACTURER.
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-001
GENERAL NOTES AND ABBREVIATIONS
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
GENERAL NOTES:DRAWING ABBREVIATIONS
DN
EXIST WALL TO REMAIN, UNO
EXIST WALL TO BE REMOVED, UNO
EXIST DOOR/FRAME & HARDWARE TO REMAIN, UNO
EXIST DOOR/FRAME & HARDWARE TO BE REMOVED, UNO
12345678910111213141516171819
AA
A
B
C
D
E
EXISTING
ARMS
VAULT
EXISTING
WAREHOUSE
AD101
D
E
4 4
A. SEE BUILDING ELEVATION FOR SELECTIVE DEMOLITION OF EXISTING WINDOW PANES
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L
ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
AD101
OVERALL DEMOLITION PLAN - AREA 'A'
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
0' 4' 8' 16'
KEYED NOTES:
LEGEND
KEY PLAN
AREA 'A'AREA 'B'
PLAN NORTH
PLAN NORTH
1/16" = 1'-0"AD101
1 OVERALL DEMOLITION PLAN - AREA 'A'
1 EXISTING SHELVES TO REMAIN
2 EXISTING FENCE TO REMAIN
3 DEMO EXISTING SHELVES
4 DEMO EXISTING PLUMBING FIXTURES, TOILET PARTITIONS, TOILET
ACCESSORIES, AND ALL FINISHES BELOW CEILING
5 EXISTING THREE COMPARTMENT SINK TO REMAIN
6 EXISTING DRINKING FOUNTAIN TO REMAIN
7 EXISTING WATER SOFTENER TO REMAIN
8 DEMO EXISTING HOLLOW METAL DOOR AND FRAME
9 DEMO EXISTING OVERHEAD DOOR AND FRAME
10 EXISTING HOLLOW METAL DOOR AND FRAME TO REMAIN
11 EXISTING CONCRETE STAIR AND RAILING TO REMAIN
PLAN NORTH
1/8" = 1'-0"AD101
2 AREA 'A' - RESTROOMS DEMOLITION PLAN
0' 2' 4' 8'
GENERAL NOTES
EXIST WALL TO REMAIN, UNO
EXIST WALL TO BE REMOVED, UNO
EXIST DOOR/FRAME & HARDWARE TO REMAIN, UNO
EXIST DOOR/FRAME & HARDWARE TO BE REMOVED, UNO
19202122232425262728293031323334353637
AA
A
B
C
D
E
EXISTING
WAREHOUSE
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L
ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
AD102
OVERALL DEMOLITION PLAN - AREA 'B'
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
KEYED NOTES:
LEGEND
KEY PLAN
AREA 'A'AREA 'B'
PLAN NORTH
PLAN NORTH
1/16" = 1'-0"AD102
1 OVERALL DEMOLITION PLAN - AREA 'B'
0' 4' 8' 16'
1 EXISTING FENCE TO REMAIN
2 DEMO EXISTING CONCRETE FLOOR AND PREPARE FOR NEW
CONCRETE FLOOR SLOPED TO DRAIN
DNDN
A-201
12345678
10111213141516171819
AA
A
B
C
D
E
A-111
A-401
EXISTING
ARMS
VAULT
EXISTING
WAREHOUSE
PROCESSING
COUNTER
A-201
A-202
A-204
A-204
AAAAAAAA
AAAAAAAAAAAAAA
B
B
B
B
A
A
A
A
A
A
A
A
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I
V I L
ENG
IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-101
OVERALL FLOOR PLAN - AREA 'A'
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
KEY PLAN
AREA 'A'AREA 'B'
PLAN NORTH
PLAN NORTH
1/16" = 1'-0"A-101
1 OVERALL FLOOR PLAN - AREA 'A'
0' 4' 8' 16'
GENERAL NOTES:
A. SEE DETAIL 5/SHEET A-601 FOR WINDOW TYPES AND BASE BID/BID OPTION WINDOW WORK TO BE
PERFOMED
KEYED NOTES:
1 EXISTING FENCE TO REMAIN
2 BLEACHERS - GFGI
3 EXISTING SHELVES TO REMAIN
A-203
19202122232425262728293031323334353637
AA
A
B
C
D
E
EXISTING
WAREHOUSE
A-202
A-203
A AAAAAAAAAAAAAAA
AAAAAAAAAAAAAAA
B
B
B
B
FIRE
PUMP
ROOM
ELECTRICAL
ROOM
A-102
D
E
A01
A01 A01
A01
A01
FIRE
PUMP
ROOM
ELECTRICAL
ROOM
A A
31' - 4 3/4" 16' - 1"
ALIGN WALL WITH EDGE
OF EXISTING WINDOW
ALIGN WALL WITH EDGE
OF EXISTING WINDOW
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I
V I L
ENG
IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-102
OVERALL FLOOR PLAN - AREA 'B'
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
PLAN NORTH
1/16" = 1'-0"A-102
1 OVERALL FLOOR PLAN - AREA 'B'
KEY PLAN
AREA 'A'AREA 'B'
PLAN NORTH
0' 4' 8' 16'
PLAN NORTH
1/8" = 1'-0"A-102
2 FIRE PUMP AND ELECTRICAL ROOM
GENERAL NOTES:
A. SEE DETAIL 5/SHEET A-601 FOR WINDOW TYPES AND BASE BID/BID OPTION WINDOW WORK TO BE
PERFOMED
KEYED NOTES:
1 EXISTING OVERHEAD DOOR TO REMAIN
2 NEW CONCRETE FLOOR SLOPED TO DRAIN
3 FLOOR DRAIN - SEE PLUMBING
0' 2' 4' 8'
DN
345678
101112
AA
A
B
PAX
TERMINAL/HOLDING
AREA
PAX
TERMINAL/BRIEFING
AREA
PROCESSING
COUNTER
EXISTING
WAREHOUSE
EXISTING
ARMS
VAULT
C L E
A R
PAX
TERMINAL/HOLDING
AREA
JANITOR'S
CLOSET
A-301
A-111
DCC OFC
LEGAL
OFC
MEDICAL
OFC
CHAPLAIN
OFC
ADMIN
OFC
CORRIDOR
COMM
101B
C
CORRIDOR
112A
B
B02
B02
B01
B01 B01
B01
B01
B01
B01
E05
E05
B02
H02 B02
G01
B01
B04
H04
B02
B01
B01
H01
B01
E05 E05
B01
B02H02
B02
59' - 5 3/4" 68' - 2 3/4" 12' - 7 1/4"
5' - 0" 43' - 10" 18' - 10 1/4" 4' - 10"
153' - 4 3/4"
/2
/2
E05
H02
1' - 3"
/4
15' - 11" 7' - 8" 7' - 8"
9' - 8 1/4" 26' - 0"
B01
A-402
B
VESTIBULE
G01
B05B05 B05
B01
A-301
A A
D
E E
A AAAAA
B02
H03
B03
C02C02
C03C03
H01
A-401
113A
WOMEN
RESTROOM
PDF MEN
RESTROOM
C C
/2
/4
1' - 0"
1' - 0"
1' - 0"
18 18
E05
A-301
/4
11' - 2 1/4"
4' - 11 1/2"
A
A
B
B
101A
4' - 0" 19
21 21 21 21 21 21
21 21
A-111
G01
2' - 0" E05
A
A-301
MEZZANINE
B02
B02
41' - 9 1/4"
B02
B02
JANITOR'S
CLOSET
B01
B02
B01B02
B02
A-301
A-301
MH
A. MEZZANINE DESIGN LIVE LOAD = 40 PSF
B. SEE DETAIL 5/SHEET A-601 FOR WINDOW TYPES AND BASE BID/BID OPTION WINDOW WORK TO BE
PERFORMED
AA
A-302
5' - 0"
A-302
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-111
AREA 'A' - PARTIAL FLOOR PLANS
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
KEY PLAN
GENERAL NOTES:
AREA 'A'AREA 'B'
PLAN NORTH
PLAN NORTH
1/8" = 1'-0"A-111
1 AREA 'A' - PDF PROCESSING FLOOR PLAN
0' 6" 1' 2'
0' 2' 4' 8'
KEYED NOTES:
1 ABA DRINKING FOUNTAIN WITH BOTTLE FILLER
2 PRINT/COPY/FAX MACHINE - GFGI
3 REFRIGERATOR - GFGI
4 EXISTING OVERHEAD DOOR TO REMAIN
5 EXISTING SHELVES TO REMAIN
6 NOT USED
7 SHIP'S LADDER TO MEZZANINE
8 REMOVABLE PIPE AND TUBE GUARD - FABRICATE IN MAX. 6'-0"
SECTIONS
9 EXISTING TRUSS CROSS BRACING ABOVE
10 3/4" FRTW PLYWOOD TO 8'-0" AFF
11 REMOVABLE PIPE AND TUBE GUARD - FABRICATE IN MAX. 6'-0"
SECTIONS
12 SAW-CUT FLOOR FOR 2'-0" WIDE BY 1'-0" THICK FOOTING. REINFORCE
WITH #4 @ 12" OC TRANSVERSE AND (4) #5 CONT. TYPICAL ALL 4
WALLS
13 600S162-33 (33 KSI) STRUCTURAL STUD
14 EXISTING CONCRETE STAIR AND RAILING TO REMAIN
15 NEW CONCRETE STAIR AND HANDRAIL - SEE 2/A-111
16 3/4" 32/16 SPAN RATED PLYWOOD ON 800S162-68 (50 KSI)
COLD-FORMED JOISTS
17 4" METAL BOLLARD - SEE DETAIL 7/C-501
18 CORNER GUARD - EXTEND FROM TOP OF BASE TO CEILING
19 4"X4"X3/16" COLUMN, SEE OPERABLE PARTITION SUPPORT DETAIL
6/A-302
20 OPERABLE PARTITION, SEE DETAILS 4/A-302 AND 6/A-302
21 WINDOW MINI-BLIND
22 KNOX BOX - SEE SHEET FL101
PLAN NORTH
1/8" = 1'-0"A-111
3 AREA 'A' - MEZZANINE FLOOR PLAN
0' 2' 4' 8'
PLAN NORTH
1/2" = 1'-0"A-111
2 AREA 'A' - ENLARGED STAIRWAY
45678
AA
A
A-302
9'-0"
8'-6"
8'-6"
10'-0"
9'-6"
9'-0"
10'-0"10'-0" 10'-0"
8'-6"
8'-6"
8'-6"
8'-6"
8'-6"8'-6"
8'-6"
8'-6"
8'-6"
A-302
9'-6"
D
E
CEILING HEIGHT
LIGHT FIXTURE
AIR DEVICE
2'x2' ACT
GYPSUM BOARD
8'-0"
D
E
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-121
PARTIAL REFLECTED CEILING PLANS
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
0' 2' 4' 8'
KEY PLAN
GENERAL NOTES:
AREA 'A'AREA 'B'
PLAN NORTH
KEYED NOTES:
PLAN NORTH
1/8" = 1'-0"A-121
1 AREA 'A' - PDF PROCESSING RCP
PLAN NORTH
1/8" = 1'-0"A-121
3 AREA 'A' - RESTROOMS RCP
0' 2' 4' 8'
1 NOT USED
2 EXISTING CEILING AND LIGHTING TO REMAIN
3 OPEN TO STRUCTURE ABOVE
LEGEND
A. MEZZANINE CEILING IS OPEN TO STRUCTURE ABOVE - SEE SHEET EL111 FOR MEZZANINE LIGHTING
PLAN NORTH
1/8" = 1'-0"A-121
2 AREA 'B' - PARTIAL RCP
FIN. FLR.
0"
ROOF 1
15' - 0"
TOF
-3' - 0"
ROOF 2
28' - 0"
AAABCDE
MEZZANINE
10' - 0"
FIN. FLR.
0"
ROOF 1
15' - 0"
TOF
-3' - 0"
ROOF 2
28' - 0"
1 2 3 4 5 6 7 8 9 10 11 12 13
MEZZANINE
10' - 0"
A -2
1 1
BASE BID - CLEAN,
REPAIR, RESTORE,
AND PAINT EXISTING
WINDOWS
BASE BID - CLEAN,
REPAIR, RESTORE,
AND PAINT EXISTING
WINDOWS
BASE BID - CLEAN,
REPAIR, RESTORE,
AND PAINT EXISTING
WINDOWS
INDICATION OF
BASE BID GLASS LITE(S)
TO BE REPLACED -
SEE ELEVATIONS
* APPROXIMATE QUANTITY
OF GLAZING TO BE
REPLACED IS 10%
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
C I V
I L ENG IN
E E
R
USAF
88TH ABW
WRIGHT-PATTERSON AIR FORCE BASE
BY
M. SAPP S. KOPITTKE M. BAUMAN
A-201
EXTERIOR BUILDING ELEVATIONS
CONSOLIDATE PDF TO F/30257
FINNEY FINNEY DEGARO 31-JAN-19
FINAL DESIGN SUBMITTAL
ZHTV10100629
KEYED NOTES:
1/8" = 1'-0"A-201
1 EAST ELEVATION
0' 2' 4' 8'
1/8" = 1'-0"A-201
2 NORTH ELEVATION - 1
1 EXISTING OVERHEAD DOOR TO REMAIN
2 EXISTING CONCRETE STAIR AND RAILING TO REMAIN
3 NEW ALUMINUM STOREFRONT GLAZING SYSTEM
4 NEW HOLLOW METAL DOOR AND FRAME TO MATCH EXISTING
5 EXISTING BRICK VENEER TO REMAIN
6 EXISTING METAL ROOF TO REMAIN
WINDOW LEGEND
ROOF 1
15' - 0"
TOF
-3' - 0"
ROOF 2
28…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .