Wiesbaden Commissary Total Maintenance Services

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
HQC01026QE021
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Wiesbaden Hesse Germany

Notice details come from SAM.gov. Updated .

About this opportunity

The Defense Commissary Agency seeks comprehensive maintenance services for the Wiesbaden commissary facility and equipment in Germany, with proposals due August 21, 2026. This is an unrestricted procurement with no set-aside.

Place of performance is Wiesbaden, Germany. The facility spans 61,480 square feet and contains approximately 400+ line items of building systems, infrastructure, and food-handling equipment requiring three tiers of maintenance: preventive maintenance (PM) with scheduled inspections and routine servicing; unscheduled maintenance (UM) with cost estimates due within 14 days and completion within 45 days of approval; and emergency maintenance (EM) with 24/7 response capability and on-site technician arrival within three hours for critical issues. For repairs exceeding EUR3,000, the contractor must stabilize the issue and await government approval before completing full repairs.

The contractor must maintain English-speaking personnel, including a dedicated 24/7 Contract Manager, and complete at least 70 percent of all requested work with internal capacity without subcontracting. All work orders, estimates, and deliverables must be tracked through the government's web-based Service Order Management System (SOMS). The contractor manages installation access passes for direct employees and conducts daily coordination with store management. Reporting requirements include initial and quarterly 100 percent equipment inventories, monthly maintenance findings, and annual refrigerant leak reports. The NAICS code is 238990, All Other Specialty Trade Contractors. PSC is Z1JZ, Maintenance of Miscellaneous Buildings. The base contract period runs September 15, 2026 through September 14, 2027, with two one-year option periods. Amendment 4 (issued August 13, 2026) extended the proposal deadline to August 21, 2026 and updated the pricing worksheet. Solicitation Attachment 8 (posted August 20, 2026) directs bidders to FAR clauses 52.212-1 and 52.212-2 on pages 51 and 54 of the solicitation for bid submission requirements.

Notice text

6 versions

Update #6 · Latest ·

Date: 20 Aug 2026 Response to industry questions: See attached A.15.01.03.17 Solicitation Attachment 8 Question and Answer.

Amendment 4: A.15.01.01(HQC01026QE021 A0004): Updated pricing worksheet by removing contractor workorder system pricing from the worksheet and added a line in the PM section miscellaneous item for inventory variation.

A.15.01.03.10 Solicitation Attachment 1 Pricing Worksheet is renamed to A.15.01.03.10 Updated Solicitation Attachment 1 Pricing
Worksheet

Amendment 3 A.15.01.01 (HQC01026QE021 A0003): Removing CLINs 0004, 1004, and 2004 from the solicitation and resultant contract, and answering questions received from industry.

Amendment 2: A.15.01.01 (HQC01026QE021 A0002): Changing CLINs 0004, 1004, and 2004 from priced to not priced, providing a site visit map, and answering questions received from industry.

Amendment 1: A.15.01.01 (HQC01026QE021 A0001): Correcting the Solicitation Helpdesk Link. See attached for more information.

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Update #5 ·

Amendment 4: A.15.01.01(HQC01026QE021 A0004): Updated pricing worksheet by removing contractor workorder system pricing from the worksheet and added a line in the PM section miscellaneous item for inventory variation.

A.15.01.03.10 Solicitation Attachment 1 Pricing Worksheet is renamed to A.15.01.03.10 Updated Solicitation Attachment 1 Pricing
Worksheet

Amendment 3 A.15.01.01 (HQC01026QE021 A0003): Removing CLINs 0004, 1004, and 2004 from the solicitation and resultant contract, and answering questions received from industry.

Amendment 2: A.15.01.01 (HQC01026QE021 A0002): Changing CLINs 0004, 1004, and 2004 from priced to not priced, providing a site visit map, and answering questions received from industry.

Amendment 1: A.15.01.01 (HQC01026QE021 A0001): Correcting the Solicitation Helpdesk Link. See attached for more information.

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Update #4 ·

Amendment 3 A.15.01.01 (HQC01026QE021 A0003): Removing CLINs 0004, 1004, and 2004 from the solicitation and resultant contract, and answering questions received from industry.

Amendment 2: A.15.01.01 (HQC01026QE021 A0002): Changing CLINs 0004, 1004, and 2004 from priced to not priced, providing a site visit map, and answering questions received from industry.

Amendment 1: A.15.01.01 (HQC01026QE021 A0001): Correcting the Solicitation Helpdesk Link. See attached for more information.

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Update #3 ·

Amendment 2: A.15.01.01 (HQC01026QE021 A0002): Changing CLINs 0004, 1004, and 2004 from priced to not priced, providing a site visit map, and answering questions received from industry.

Amendment 1: A.15.01.01 (HQC01026QE021 A0001): Correcting the Solicitation Helpdesk Link. See attached for more information.

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Update #2 ·

Amendment 1: A.15.01.01 (HQC01026QE021 A0001): Correcting the Solicitation Helpdesk Link. See attached for more information.

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Update #1 ·

The Defense Commissary requires a commercial contractor  to provide comprehensive maintenance services at the Wiesbaden commissary facility and equipment in Germany. This is a non-personal services requirement where the contractor manages their own workforce to keep all building systems, infrastructure, and food handling equipment safe, compliant and continously operational.

The contractor is responsible for three tiers of facility and equipment maintenance:

  • Preventive Maintenance (PM): Scheduled inspections, functional cleanings, and routine servicing to prevent unexpected failures.

  • Unscheduled Maintenance (UM): Repairs for non-critical unexpected failures. The contractor must submit a cost estimate within 14 days and complete the work within 45 days of approval.

  • Emergency Maintenance (EM): 24/7 immediate response for issues threatening life, safety, or critical operations (e.g., refrigeration loss). Technicians must be on-site within 3 hours. For repairs over €3,000, the contractor must stabilize the issue and await government approval before completing the full repair.

Operation and Personnel Requirements:

  • Qualified Workforce: The contractor must provide qualified, English-speaking personnel (including a 24/7 Contract Manager) and maintain the internal workforce capacity to complete at least 70% of all requested work without subcontracting.

  • System Tracking: All work orders, estimates, and deliverables must be tracked exclusively through the government's web-based Service Order Management System (SOMS).

  • Base Access & Coordination: The contractor must manage installation access passes for its direct employees and conduct brief, daily check-ins with store management to coordinate work around retail operations.

Compliance and Quality Assurance:

  • Reporting: The contractor must submit an initial 100% equipment inventory (updated quarterly), monthly maintenance findings, and an annual refrigerant leak report.

  • Safety & Quality Plans: Comprehensive Safety and Quality Control Plans (QCP) must be submitted shortly after contract award to ensure adherence to commercial standards and EU regulations.

Files

File Type Posted
A.15.01.03.17 Solicitation Attachment 8 Question and Answer.pdf PDF
A.15.01.01 Solicitation Amendment (HQC01026QE021A0004).pdf PDF
A.15.01.03.10 Updated Solicitation Attachment 1 Pricing Worksheet.xlsx XLSX spreadsheet
A.15.01.03.16 Solicitation Attachment 7 Additional Questions and Government Response.pdf PDF
A.15.01.01 Solicitation Amendment (HQC01026QE021A0003).pdf PDF
A.15.01.03.15 Solicitation Attachment 6 Questions and Government Response.pdf PDF
A.15.01.01 Solicitation Amendment (HQC01026QE021A0002).pdf PDF
A.15.01.03.14 Solicitation Attachment 5 Site Visit Map.pdf PDF
A.15.01.01 Solicitation Amendment (HQC01026QE021 A0001).pdf PDF
A.15.01.03.13 Solicitation Attachment 4 Solicitation Helpdesk Information.pdf PDF
A.15.01.03.01 Annex A - Items that may require repair.xlsx XLSX spreadsheet
A.15.01.03.10 Solicitation Attachment 1 Pricing Worksheet.xlsx XLSX spreadsheet
A.15.01.03.03 Annex C Current inventory WIE.xlsx XLSX spreadsheet
A.15.01.03.07 Annex G delivery matrix WIE.xlsx XLSX spreadsheet
A.15.01.03.02 Annex B items excluded from contract WIE.xlsx XLSX spreadsheet
A.15.01.03.12 Solicitation Attachment 3 Sample Work Orders.xlsx XLSX spreadsheet
A.15.01.03.11 Solicitation Attachment 2 Site Visit Information.pdf PDF
A.15.01.03.09 Annex I Contractor Provided Work Order System.pdf PDF
A.15.01.03.08 Annex H Performance Requirement Summary WIE.xlsx XLSX spreadsheet
A.15.01.03.06 Annex F Inventory change instructions WIE.pdf PDF
A.15.01.03.05 Annex E Emergency Criteria WIE.pdf PDF
A.15.01.03.04 Annex D Inventory label instructions WIE.pdf PDF
A.15.01.03 Solicitation (HQC01026QE021).pdf PDF
Show all 23

Notice history

Notice Type Posted
Wiesbaden Commissary Total Maintenance Services Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
DeCA Europe Central Distribution Centers Facility Maintenance Call for Solutions Ramstein Rhineland-Palatinate 66877 Germany · NAICS 238990 Defense Commissary Agency No set-aside
DeCA Europe UK Facility Maintenance Call for Solutions Lakenheath Suffolk United Kingdom · NAICS 811310 Defense Commissary Agency No set-aside
Between Occupancy Maintenance (BOM) Construction & Cleaning Services Hohenfels Bavaria Germany · NAICS 23611 Army Contracting Command No set-aside
2CR Dragoon Inn Full Food Service at USAG Vilseck Vilseck Bavaria Germany · NAICS 722310 Army Contracting Command No set-aside
Combined Synopsis/Solicitation Notice: Maintenance of Commissary Refrigeration Systems and Repair of Refrigeration, Heating, Ventilation, and Air Conditioning Systems (HVAC) at Hario and Sasebo, Japan Hario Commissary, Building 5127, Sasebo Commissary, Building 1436 and Sasebo Storage Facility, Building 306 Hario and Sasebo Nagasaki Japan · NAICS 811310 ENDIST Japan No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity