USS lewis b. Puller force generation risk reduction
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- N6817125R0001
- Agency
- Naval Supply Systems Command Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J998 Non-Nuclear Ship Repair (East)
- Points of contact
-
- Yarinee Tafur yarinee.tafur.civ@us.navy.mil +39081568601
- Maria Saggese maria.saggese.ln@us.navy.mil +390815683938
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) contract opportunity from the Department of the Navy Naval Supply Systems Command. The contract includes a Regular Overhaul-Dry Dock (ROH-DD), a layberth with services, and a Mid Term Availability (MTA) from May 28, 2025 to September 30, 2026. Key requirements include providing facilities, services, labor, materials, industrial assistance, planning, material procurement, and husbanding services. Evaluation criteria will focus on past performance, technical capabilities, and pricing. Interested parties must sign a confidentiality agreement (attachment S-1) to receive the full solicitation documents.
The contract is not set-aside for any specific business type. The incumbent is unknown. The contract value is not specified, but the work scope includes 274 line items across various work categories. The ship is a 239-meter long general cargo vessel operated by the Military Sealift Command, with a deadweight of 71,577 MT.
Notice text
This is the draft solicitation with all the attachments for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) which includes a Regular Overhaul-Dry Dock (ROH-DD), a layberth with services and a Mid Term Availability (MTA) from Mary 28, 2025 to September 30, 2026. To receive the references, sign attachment S-1 and return per the instructions in Section L
Attachments
| File | Type | Posted |
|---|---|---|
| J-2a part2 MSC ROH WI.pdf | ||
| S-8 MSC DRY DOCK Sheet.pdf | ||
| S-2_QA Checklist updated.pdf | ||
| S-1_NDA.pdf | ||
| J-2c MSC MTA WI.pdf | ||
| J-2a FDRMC ROH WI.pdf | ||
| J-1b Lay berth_IA.xlsx | XLSX spreadsheet | |
| S-9 Vessel Status Report.pdf | ||
| S-6 PPQ.pdf | ||
| S-5 _PP Information.pdf | ||
| S-7 Fire and Safety Plan Checklist.pdf | ||
| J-2a part1 MSC ROH WI.pdf | ||
| J-5_MSC Facility Survey.pdf | ||
| J-2c FDRMC MTA WI.pdf | ||
| J-1c MTA.xlsx | XLSX spreadsheet | |
| N6817125R001 LBP FGRR Solicitation.pdf | ||
| S-10 LBP Planned Maintenance.xlsx | XLSX spreadsheet | |
| S-3_Foreign ACP Questionnaire.pdf | ||
| S-4_Foreign National Cert.pdf | ||
| J-4 GFP LIST.xlsx | XLSX spreadsheet | |
| J-2b MSC Lay berth_IA WI.pdf | ||
| J-1a ROH.xlsx | XLSX spreadsheet |
Show all 22
Notice history
| Notice | Type | Posted |
|---|---|---|
| USS lewis b. Puller force generation risk reduction | Solicitation | |
| USS lewis b. Puller force generation risk reduction | Pre-Solicitation | |
| USS lewis b. Puller ship check | Special Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity