S-5 _PP Information.pdf

PDF 377 KB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is an Attachment S-5 (Past Performance/CPARS Information Sheet) for the USS LEWIS P. PULLER (ESB 3) contract. It requests the offeror to provide detailed past performance information, including contract numbers, dollar values, periods of performance, and work scope details demonstrating similarity to the current solicited work. Key information requested includes the type of contract, ship name and availability, procuring agency point of contact, whether the offeror was the prime or subcontractor, and a detailed description of the work performed across various ship systems, hull and structural elements, preservation activities, dry-dock work, material control, quality control facilities, key personnel, and schedule management. This information is intended to be evaluated as part of the past performance criteria for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) contract, which includes a Regular Overhaul-Dry Dock (ROH-DD), layberth with services, and a Mid Term Availability (MTA) from May 28, 2025 to September 30, 2026.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
S-9 Vessel Status Report.pdf PDF
S-6 PPQ.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
J-2a part1 MSC ROH WI.pdf PDF
J-5_MSC Facility Survey.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-1c MTA.xlsx XLSX spreadsheet
N6817125R001 LBP FGRR Solicitation.pdf PDF
S-10 LBP Planned Maintenance.xlsx XLSX spreadsheet
S-3_Foreign ACP Questionnaire.pdf PDF
S-4_Foreign National Cert.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
J-2b MSC Lay berth_IA WI.pdf PDF
J-1a ROH.xlsx XLSX spreadsheet
J-2a part2 MSC ROH WI.pdf PDF
S-8 MSC DRY DOCK Sheet.pdf PDF
S-2_QA Checklist updated.pdf PDF
S-1_NDA.pdf PDF
J-2c MSC MTA WI.pdf PDF
J-2a FDRMC ROH WI.pdf PDF
J-1b Lay berth_IA.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS LEWIS P. PULLER (ESB 3) Attachment S-5

ATTACHMENT S-5 (PAST PERFORMANCE/CPARS INFORMATION SHEET)

TO BE COMPLETED BY OFFEROR

Contractor:

Unique Identifier ID/CAGE Code:

Reference #1 Reference #2 Reference #3

Contract Number / Delivery Order Number

Was CPARS completed?

If so, when?

Type of Contract

Ship Name

Type of Availability

Amount of Total Award

Period of Performance

Final Dollar Value of Contract (Award + Growth/New Work) **If work performed as a subcontractor, identify the final dollar value and hours of the subcontract and only those portions.**

Procuring Agency Point(s) of Contact (not to exceed 3):

Name, Email and Telephone Number(s) of Government or Commercial Entity for which the contract was performed.

Was your company the prime or subcontractor? (If the subcontractor, identify only those portions of the contract performed by your company).

DETAILED DESCRIPTION OF WORK (DEMONSTRATING THE SIMILARITY OF THE WORK PERFORMED TO ATTACHMENT J-2(a), J-2 (b) and J-2 (c) (WORK SPECIFICATION PACKAGE)

Work Specification Package Content: Provide detailed descriptions on work package similarities with current solicited work package.

Ship Systems: Propulsion, Electrical, Communication & Navigation, Auxiliary Machinery, Heating, Ventilation & air Conditioning (HVAC), etc.

Hull / Structural: Types of welding procedures and certifications used, type and scope of structural repair.

Preservation: Preservation efforts similar in scope to current requirement.

Dry-Dock: Duration of time spent in dry-dock as well as scope of work performed while in dry-dock.

Material Control and Storage

Quality Control

Facilities: Description of Facilities utilized for contract.

Key Personnel and OEM Management

Management of Contract:

Description of schedule and critical path analysis. Was the contract completed on time?

If not, provide detailed explanation. Discuss any growth/new work performed during the course of the contract and impact, if any, on project completion.