S-8 MSC DRY DOCK Sheet.pdf

PDF 2 MB Posted

Attached to
USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
Solicitation number
N6817125R0001
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document appears to be a dry-dock evaluation form (MSC 9997/1) for the USS LEWIS B. PULLER (ESB-3). The form includes details on the ship characteristics, anticipated arrival draft, positioning clearances, loading pressures, and required/available services such as electrical power, sewage connections, fire main, seawater, freshwater, compressed air, and shore steam. It also includes information on the dry-dock characteristics, maximum block loading capacity, and safety response plans.

The related federal contract opportunity is for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) project, which includes a Regular Overhaul-Dry Dock (ROH-DD), a layberth with services, and a Mid Term Availability (MTA) from May 28, 2025 to September 30, 2026. The solicitation number is N6817125R0001, and the contracting agency is the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION, newest first.
File Type Posted
J-2a part1 MSC ROH WI.pdf PDF
J-5_MSC Facility Survey.pdf PDF
J-2c FDRMC MTA WI.pdf PDF
J-1c MTA.xlsx XLSX spreadsheet
S-9 Vessel Status Report.pdf PDF
S-6 PPQ.pdf PDF
S-5 _PP Information.pdf PDF
S-7 Fire and Safety Plan Checklist.pdf PDF
N6817125R001 LBP FGRR Solicitation.pdf PDF
S-10 LBP Planned Maintenance.xlsx XLSX spreadsheet
S-3_Foreign ACP Questionnaire.pdf PDF
S-4_Foreign National Cert.pdf PDF
J-4 GFP LIST.xlsx XLSX spreadsheet
J-2b MSC Lay berth_IA WI.pdf PDF
J-1a ROH.xlsx XLSX spreadsheet
J-2a part2 MSC ROH WI.pdf PDF
S-2_QA Checklist updated.pdf PDF
S-1_NDA.pdf PDF
J-2c MSC MTA WI.pdf PDF
J-2a FDRMC ROH WI.pdf PDF
J-1b Lay berth_IA.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSC 9997/1 (Rev. 02-23) Page 1 of 3

MSC DRY DOCK EVALUATION N7.721.9997.8-Q

1. SHIP NAME: 2. HULL NUMBER:

PART A (to be completed by MSC) (Note: PART A consists of left columns for pages 1-2)

PART B (to be completed by ALL shipyards) (Note: PART B consists of right columns for pages 1-2)

17. SHIPYARD NAME: 18. DRY DOCK NUMBER:

19. DRY DOCK TYPE: 20. DRY DOCK CERTIFIED?

Yes No

21. CERTIFYING / CLASSIFYING AGENCY:

22. CERTIFICATE NUMBER: 23. EXPIRATION DATE:

3. SHIP CHARACTERISTICS: ENGLISH MEASURE: METRIC MEASURE: 24. DRY DOCK CHARACTERISTICS: ENGLISH MEASURE: METRIC MEASURE:

a. Length, overall: ft.; in m a. Length, overall: ft.; in m

b. Breadth, molded: ft.; in m b. Clear width, at top of blocks: ft.; in m

c. Draft, summer load line: ft.; in m c. Max dry dock lift capacity: LT MT

d. Displacement, Full Load: LT MT d. Allowable linear loading: LT / ft MT / m

e. Max stern trim for graving dock: ft.; in m e. Water depths around dock area and approaches, tidal conditions, and any unusual conditions for entering / leaving dry dock ft.; in m

4. ANTICIPATED ARRIVAL DRAFT: ENGLISH MEASURE: METRIC MEASURE: f. Water depth over floor, at zero tide: ft.; in m

a. Draft – forward: ft.; in m g. Water depth over blocks, at zero tide: ft.; in m

b. Draft – aft: ft.; in m h. Water depth over sill, at zero tide: ft.; in m

5. POSITIONING CLEARANCES:

a. Bottom: keel to dry-dock floor:

ENGLISH MEASURE:

ft.; in

METRIC MEASURE:

m

25. MAXIMUM BLOCK LOADING CAPACITY:

LT / ft.² MT / m²

b. Side: hull to dry-dock wall: ft.; in m 26. KEEL AND SIDE BLOCK INFORMATION:

6. LOADING PRESSURES: ENGLISH MEASURE: METRIC MEASURE: a. Construction:

Maximum allowable block loading: LT / ft.² MT / m² b. Cap Material:

Note: All blocks to be positioned under longitudinal strength numbers and transverse bulkheads. c. Cap Thickness: in. cm.

d. Block Age (Years): years

e. Height: ft.; in m

f. Width (perpendicular to ship centerline): ft.; in m

g. Length (parallel to ship centerline): ft.; in m

UNCONTROLLED DOCUMENT IF PRINTED. Verify current version at https://flankspeed.sharepoint-mil.us/sites/USFF-MSC/policies/SitePages/Directives.aspx

MSC 9997/1 (Rev. 02-23) Page 2 of 3

PART A (to be completed by MSC) (continued) PART B (to be completed by ALL shipyards) (continued)

MINIMUM REQUIRED SERVICES: MINIMUM AVAILABLE SERVICES:

7. ELECTRICAL POWER:

a. AC Voltage:

b. Number of Phases:

c. Amperage (total):

d. Frequency:

e. Number of Lines:

VAC

amps

Hz

27. ELECTRICAL POWER:

a. AC Voltage:

b. Number of Phases:

c. Amperage (total):

d. Frequency:

e. Number of Lines:

VAC

amps

Hz

8. GROUND CONNECTIONS:

a. Number of ground connections:

b. Cable size, each:

cir mils

28. GROUND CONNECTIONS:

a. Number of ground connections:

b. Cable size, each:

cir mils

9. SEWAGE CONNECTIONS:

a. Number of sewage connections:

b. Pipe size:

c. Capacity:

inch ips gallons / day cm liters / day

29. SEWAGE CONNECTIONS:

a. Number of sewage connections:

b. Pipe size:

c. Capacity:

gallons / day liters / day

10. FIRE MAIN:

a. Number of connections:

b. Connection size:

c. Pressure:

d. Capacity:

psig gallons / min kilo-pascals liters / min

30. FIRE MAIN:

a. Number of connections:

b. Connection size:

c. Pressure:

d. Capacity:

gallons / min liters / min

11. AUX SEAWATER:

a. Pressure:

b. Capacity:

gals / min liters / min

31. AUX SEAWATER:

12. FRESH WATER:

32. FRESH WATER:

13. COMPRESSED AIR:

cu ft / min

33. COMPRESSED AIR:

cu ft / min

14. SHORE STEAM:

lbs / hour kg / hour

34. SHORE STEAM:

lbs / hour kg / hour

15. HIGH PRESSURE WATER PRESSURE: psig kilo-pascals 35. HIGH PRESSURE WATER PRESSURE: psig kilo-pascals

16. SAFETY RESPONSE PLANS REQUIRED:

a. Flooding (accidental):

b. Firefighting:

c. Earthquake:

d. Typhoon/hurricane:

Yes

No

No

No

36. SAFETY RESPONSE PLANS AVAILABLE:

a. Flooding (accidental):

b. Firefighting:

c. Earthquake:

d. Typhoon/hurricane:

No

UNCONTROLLED DOCUMENT IF PRINTED. Verify current version at https://flankspeed.sharepoint-mil.us/sites/USFF-MSC/policies/SitePages/Directives.aspx

MSC 9997/1 (Rev. 02-23) Page 3 of 3

PART C (to be completed by Shipyard if dry-dock is not certified by IACS or under MIL STD 1625)

37. CONTRACTOR NAME: 38. DOCKMASTER NAME:

39. CERTIFYING AGENCY: 40. CERTIFICATE NO: 41. YEARS OF EXPERIENCE:

42. IS DRY DOCK INSURED?

Yes No

43. POLICY INSURER:

44. POLICY NUMBER: 45. AMOUNT INSURED: 46. DATE OF EXPIRATION:

PART D (to be completed by ALL Shipyards)

1. The Offeror shall provide a list of the vessels (and their principal characteristics) dry-docked in this dry dock over the past 2 years. (Attach a separate page)

2. The Offeror shall describe the nature and cause of accidents experienced by the shipyard in dry-docking operations over the past 5 years. The Offeror shall describe corrective action taken or practices implemented to prevent recurrence of accidents. (Attach a separate page)

Per below signature, I hereby certify that information provided in PARTS B-D are true and accurate.

47. NAME AND TITLE OF SHIPYARD OFFICIAL: 48. SIGNATURE OF SHIPYARD OFFICIAL: 49. DATE SIGNED:

UNCONTROLLED DOCUMENT IF PRINTED. Verify current version at https://flankspeed.sharepoint-mil.us/sites/USFF-MSC/policies/SitePages/Directives.aspx

1 SHIP NAME: USS LEWIS B PULLER (ESB-3)
2 HULL NUMBER: 543
17 SHIPYARD NAME:
18 DRY DOCK NUMBER:
21 CERTIFYING CLASSIFYING AGENCY:
22 CERTIFICATE NUMBER:
23 EXPIRATION DATE:
37 CONTRACTOR NAME:
38 DOCKMASTER NAME:
39 CERTIFYING AGENCY:
40 CERTIFICATE NO:
41 YEARS OF EXPERIENCE:
43 POLICY INSURER:
44 POLICY NUMBER:
45 AMOUNT INSURED:
46 DATE OF EXPIRATION:
47 NAME AND TITLE OF SHIPYARD OFFICIAL:
49 DATE SIGNED:
3 SHIP CHARACTERISTICS:
0:
0: 785
1: 3
2: 239.32
1:
0: 164
1: 1
2: 50
2:
0: 39
1: 5
2: 12
3:
0: 105007
1:
2:
4:
0: 1
1: 9
2: .327
4 ANTICIPATED ARRIVAL DRAFT:
0:
0: 23
1: 5
2: 7.13
1:
1: 4
2: 7.11
0:
0: 23
5 POSITIONING CLEARANCES:
0:
0: 8
1: 2
2: 2.5
1:
0: 5
1: 0
2: 1.524
6 LOADING PRESSURES:
0: 370
1: 260.14
19 DRY DOCK TYPE: [ ]
20 DRY DOCK CERTIFIED: Off
24 DRY DOCK CHARACTERISTICS:
0:
0:
1:
2:
1:
0:
1:
2:
2:
0:
2:
3:
0:
2:
4:
0:
1:
2:
5:
0:
1:
2:
6:
0:
1:
2:
7:
0:
1:
2:
25 MAX BLOCK LOADING CAPACITY:
0:
1:
26 KEEL AND SIDE BLOCK INFO:
0:
0:
1:
0:
2:
0:
2:
3:
0:
4:
0:
2:
1:
5:
0:
1:
2:
6:
0:
1:
2:
7 ELECTRICAL POWER:
0: 500
1: 3
2: 6000
3: 60
4: 15
8 GROUND CONNECTIONS:
0: 1
1:
9 SEWAGE CONNECTIONS:
0:
0: 1
1:
0: 4
1: 10.16
2:
0: 2500
1: 9463.5
10 FIRE MAIN:
0:
0: 2
1:
0: 2.5
1: 6.35
2:
0: 150
1: 10.546
3:
0: 1000
1: 3785.41
11 AUX SEAWATER:
0:
0: 100
1: .070307
1:
0: 600
1: 2271.24
12 FRESH WATER:
0:
0: 60
1: 4.21842
1:
0: 3530
1:
13 COMPRESSED AIR:
0:
0: 125
1: 8.78837
1:
0: 300
1: 188.78
14 SHORE STEAM:
0:
0: 0
1:
1:
0: 0
1:
15 HIGH PRESSURE WATER:
0: 2500
1: 175.767
16d SAFETY RESPONSES: Yes
16c SAFETY RESPONSES: Yes
16b SAFETY RESPONSES: Yes
16a SAFETY RESPONSES: Yes
27 ELECTRICAL POWER:
0:
1:
2:
3:
4:
28 GROUND CONNECTIONS:
0:
1:
29 SEWAGE CONNECTIONS:
0:
0:
1:
0:
1:
2:
0:
1:
30 FIRE MAIN:
0:
0:
1:
0:
1:
2:
0:
1:
3:
0:
1:
31 AUX SEAWATER:
0:
0:
1:
1:
0:
1:
32 FRESH WATER:
0:
0:
1:
1:
0:
1:
33 COMPRESSED AIR:
0:
0:
1:
1:
0:
1:
34 SHORE STEAM:
0:
0:
1:
1:
0:
1:
35 HIGH PRESSURE WATER:
0:
1:
36d SAFETY RESPONSES: Off
36c SAFETY RESPONSES: Off
36b SAFETY RESPONSES: Off
36a SAFETY RESPONSES: Off
42 DRY DOCK INSURED?: Off
Reset:

File details come from the government source that posted it. Updated .