J-2a FDRMC ROH WI.pdf
PDF 2 MB Posted
- Attached to
- USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
- Solicitation number
- N6817125R0001
About this file
This document is a draft solicitation and related attachments for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) contract opportunity from the Department of the Navy Naval Supply Systems Command. The contract includes a Regular Overhaul-Dry Dock (ROH-DD), a layberth with services, and a Mid Term Availability (MTA) from May 28, 2025 to September 30, 2026. The solicitation includes detailed specifications for work to be accomplished on the ship, including preservation, cleaning, testing, and repair of various systems and components. Key details include a list of applicable standard items, a planned work index, and a breakdown of specific work items with their respective requirements. The document provides information on government furnished material, instructions for submitting a response, and points of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-2a part2 MSC ROH WI.pdf | ||
| S-8 MSC DRY DOCK Sheet.pdf | ||
| S-2_QA Checklist updated.pdf | ||
| S-1_NDA.pdf | ||
| J-2c MSC MTA WI.pdf | ||
| J-1b Lay berth_IA.xlsx | XLSX spreadsheet | |
| S-9 Vessel Status Report.pdf | ||
| S-6 PPQ.pdf | ||
| S-5 _PP Information.pdf | ||
| S-7 Fire and Safety Plan Checklist.pdf | ||
| J-2a part1 MSC ROH WI.pdf | ||
| J-5_MSC Facility Survey.pdf | ||
| J-2c FDRMC MTA WI.pdf | ||
| J-1c MTA.xlsx | XLSX spreadsheet | |
| N6817125R001 LBP FGRR Solicitation.pdf | ||
| S-10 LBP Planned Maintenance.xlsx | XLSX spreadsheet | |
| S-3_Foreign ACP Questionnaire.pdf | ||
| S-4_Foreign National Cert.pdf | ||
| J-4 GFP LIST.xlsx | XLSX spreadsheet | |
| J-2b MSC Lay berth_IA WI.pdf | ||
| J-1a ROH.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
FDRMC BAHRAIN
USS LEWIS B PULLER (ESB 3)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: BAHR-005-25
INCLUDES ALL CHANGES THROUGH 11/02/2024
INDEX
SHIP: USS LEWIS B PULLER (ESB 3) BAHR-005-25
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 09/29/2023 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original
009-03 Toxic and Hazardous Substance; control 09/29/2023 Original
009-04 Quality Management System; provide 03/13/2024 CH-1
009-05 Temporary Access; accomplish 09/29/2023 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
09/29/2023 Original
009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original
009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original
009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original
009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original
009-20 Government Property; control 03/13/2024 CH-1
009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original
009-23 Interference; remove and install 09/29/2023 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
09/29/2023 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
09/29/2023 Original
009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original
009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original
009-67 Integrated Total Ship Testing; manage 09/05/2023 Original
009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/29/2023 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/29/2023 Original
009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original
009-80 Ship Facility; maintain 09/05/2023 Original
009-81 Compartment Closeout; accomplish 09/29/2023 Original
009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original
009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original
009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify
09/18/2023 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
09/29/2023 Original
009-99 Ship Departure Report; provide 09/29/2023 Original
Page 1 of 5 PLANNED WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-100 Ship's Stability; maintain 09/05/2023 Original
009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original
009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original
009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original
009-118 CG Deck Loading; accomplish 09/29/2023 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original
009-122 Temporary Padeye; install and remove 08/23/2023 Original
009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original
009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original
Page 2 of 5 PLANNED WORK
CATEGORY II. FY-25 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-09 Process Control Procedure (PCP); provide and accomplish
09/29/2023 Original
009-11 Insulation and Lagging; accomplish 09/29/2023 Original
009-12 Weld, Fabricate, and Inspect; accomplish 03/13/2024 CH-1
009-25 Structural Boundary Test; accomplish 09/29/2023 Original
009-26 Deck Covering; accomplish 09/01/2023 Original
009-32 Cleaning and Painting Requirements; accomplish 03/13/2024 CH-1
009-71 Piping System; test 09/29/2023 Original
009-90 Technical Representative; provide 09/29/2023 Original
009-107 Piping System Cleanliness Restoration and Flushing
(Non-Nuclear); accomplish
09/29/2023 Original
Page 3 of 5 PLANNED WORK
ITEM NO. TITLE
1) 130-00-001 A9 Weather Deck Preservation; accomplish
2) 130-00-002 Deck Plate; replace
3) 167-00-001 Joiner Door and Handle; repair
4) 167-00-002 Door Vent Screen Replace; accomplish
5) 167-10-001 Hold Open Device; install
6) 167-11-001 Cage/Wire Mesh Gate Installation; accomplish
7) 436-11-001 A8 Level Intrusion Detection System (IDS) Alarm System; install
8) 441-51-001 Antenna 2-3 Coupler Mount Preservation; accomplish
9) 508-11-001 Lagging and Insulation; replace
10) 512-00-001 Split Air Condition Cleaning; accomplish
11) 516-10-001 Container (CONEX) Refrigeration Unit Box; repair
12) 522-00-001 Magazine Sprinkler Station; repair
13) 526-11-001 Deck Drain; clean
14) 573-41-001 Certified Forklift Weight; provide
15) 583-10-001 Rigid Inflatable Boat (RIB) Sling Weight Test; accomplish
16) 583-31-001 Rigid Inflatable Boat (RIB) Overhaul; accomplish
17) 588-21-001 Helicopter Hangar Door; repair
18) 593-11-001 Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplish
19) 631-13-001 Aircraft Electrical Service Station (AESS) Hardware Repair and Foundation Preservation;
accomplish
20) 631-21-001 Forward House Preservation; accomplish
21) 634-10-001 Deck Tile; replace
22) 634-10-002 Cosmetic Polymeric (PRC) Deck Covering; replace
23) 634-11-001 A9 Level Weather Deck Non-Skid Replacement; accomplish
24) 634-11-002 A7 Level Starboard Weather Deck Non-Skid Replacement; accomplish
25) 634-11-003 A6 Level Starboard Weather Deck Non-Skid Replacement; accomplish
26) 634-11-004 A2 Level Non-Skid Replacement; accomplish
27) 634-20-001 Flight Deck Coaming Repair and Preservation; accomplish
28) 634-21-001 Flight Deck Non-skid Replacement; accomplish
29) 634-21-002 Hangar Bay Non-skid Replacement; accomplish
30) 640-00-001 Mount Safe to Deck; accomplish
31) 640-00-002 Knell Knocker Replace; accomplish
32) 651-11-001 Galley Refrigerator Compressor Replace; accomplish
33) 703-00-002 Seafox Magazine No. 2 Tie Downs; install
34) 857-10-001 Temporary Duty Section Berthing Off-Ship; provide
35) 991-00-001 Mast Scaffolding; provide
36) 992-00-001 Temporary Air Conditioning; provide
37) 992-11-001 Temporary Food Storage Facility; provide
38) 992-11-002 Ships Crew Office and Hygiene Facility; provide
39) 992-11-003 Temporary Local Area Network; provide
40) 992-21-001 Project Team Office Space; provide
41) 992-21-002 Ship's Force Office; provide
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-001
COAR: 26 PCN: CC01-L016
CC01-0278
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 130-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: A9 Weather Deck Preservation; accomplish
1.2 Location of Work:
1.2.1 A9 Level Weather Deck (A9-WD-0)
1.3 Identification:
1.3.1 Quantity (8,000 LF), A9 Weather Deck Stanchions
1.3.2 Quantity (3,000 SF), A9 Weather Deck Mast
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ship in Service General
2.4 631-8393784 Rev P, Paint Schedule
2.5 631-8452132 Rev AA, Paint Code Matrix
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a joint visual inspection with the SUPERVISOR of the areas located in 1.2 and identified in 1.3 for structural integrity, deterioration, oxidation, delamination, pitting, cracks, and areas of damage, or distortion, using 2.2 through 2.5 for guidance.
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR
3.2 Accomplish the requirement of 009-32 of 2.1 including Table 2, Line 25, Column A, B, C and E for the preservation identified in 1.3 and located in 1.2 using 2.2 through 2.5 as guidance.
3.2.1 Accomplish the requirement of 009-12 of 2.1, including Table 2, Columns A and D, Lines One through 7, clad weld and build up (100) linear feet of weather deck.
3.3 Provide each support service to include but not limited to scaffolding, crane, and JLG.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.3.
4. NOTES:
SHIP: USS LEWIS B PULLER (ESB 3)
SSP: BAHR-005-25 2 of 2 ITEM NO: 130-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 12 GL
Epoxy Coating, MIL-PRF-23236
(White), Type V or VI, Class 5 or 7 None 2.1
80100155 69969 3.2
2. 100 GL
Epoxy Coating, Buff, MIL-PRF- 23236 None 2.1
80100159 84110 3.2
3. 100 GL
Epoxy Coating, Haze Gray, MIL- PRF-23236 None 2.1
80100159 83543 3.2
4. 200 GL
Enamel, Dark Gray, MIL-PRF- 24635 None 2.1
80100135 04727 3.2
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-002
COAR: 26 PCN: CC02-0240
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 130-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Deck Plate; replace
1.2 Location of Work:
1.2.1 Tactical Ops Center (A8-91-0)
1.3 Identification:
1.3.1 Quantity (4 EA), Deck Plate, 22-Inch X 22-Inch Each
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 634-8393776 Rev F, Joiner Deck Covering Schedule
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each deck plate, located in 1.2, identified in 1.3, using 2.2 and 2.3 as guidance and as designated by the
SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Remove existing, procure and install each new two square feet deck plate, a total of 500 square feet of deck plating identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the
SUPERVISOR.
3.2.1 Template exact size, configuration, and location from each existing shipboard condition.
3.2.2 Chip and grind each surface flush in way of each repair.
3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A or D, Lines One through 7.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 21 Columns A and B for preservation of each new deck plate identified in 1.3 and located in 1.2.
3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
SSP: BAHR-005-25 2 of 2 ITEM NO: 130-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-001
COAR: 26 PCN: SERV-L111
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 167-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Joiner Door and Handle; repair
1.2 Location of Work:
1.2.1 Forward House, A1-A8 Level
1.3 Identification:
1.3.1 Quantity (12 EA), Metal Joiner Door, Non-Watertight Door, located in 1.2.1
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 624-8390167 Rev C, Joiner Door Details
2.3 801-8468127 Rev Q, General Arrangement
2.4 S9086-UF-STM-020/CH-600, Non-Structural Closures
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each frame, handle, hardware, gasket, locking mechanism and surrounding structure for deterioration, areas of damage or distortion using 2.2 through 2.4 for guidance. Note: Ships Force will identify 1.3.1 required for repair upon arrival located in 1.2.1
3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.
3.1.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.
3.2 Template exact size, configuration, and location of each joiner door from existing shipboard condition. Repair equipment based on the result of 3.1.1, identified in 1.3 and located in 1.2, using 2.2 thru 2.4 for guidance.
3.2.1 Remove door from frame, replace each faulty hardware, hinge, handle, hook, hasp, locking mechanism, gasket and associated door assembly with new.
3.2.1.1 Each door removed must be replaced lumber, plywood and staging boards, except that used for pallets, must be fire-retardant in accordance with Category Two, Type II, of MIL-L- 19140 with the functional ability to close from inside and out
SSP: BAHR-005-25 2 of 2 ITEM NO: 167-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
the door.
3.2.2 Fair and straighten each door and frame using 2.2 through 2.4 for guidance as directed by SUPERVISOR.
3.2.3 Replace each gasket, flush type tower bolt, stainless steel corner cup and new skin for Leafs, using 2.2 through 2.4 for guidance as directed by SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.3 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 4 times each. Allowable binding or sticking: None.
(V)(G) "VISUAL LIGHT TEST"
3.3.1 Accomplish visual light test for each door repaired in 3.2, using 2.2 through 2.4 for guidance. Allowable visible light: None.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
4. NOTES:
4.1 Perform final test in accordance with 009-25 for doors identified by Ship's Force.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-002
COAR: 26 PCN: CC01-0287
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 167-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Door Vent Screen Replace; accomplish
1.2 Location of Work:
1.2.1 Passage (A8-94-4-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Door Vent Screen, Door No. A8-96-2
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 624-8468286 Rev H, Joiner Door and Passing Window Schedule
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each door vent screen, located in 1.2, identified in 1.3, using 2.2 and 2.3 as guidance and as designated by the SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Fabricate and install each new door vent screen, located in 1.2, using 2.2 and 2.3 for guidance.
3.2.1 Template each exact dimension and clearance from existing shipboard conditions.
3.2.2 Chip and grind each surface flush and smooth in way of
removals.
3.3 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line One Columns A and B for preservation of each new door vent screen, identified in 1.3 and located in 1.2.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: BAHR-005-25 2 of 2 ITEM NO: 167-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-10-001
COAR: 26 PCN: CG03-1004
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 167-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hold Open Device; install
1.2 Location of Work:
1.2.1 MILDET-AT/FP Armory (A1-80-2)
1.3 Identification:
1.3.1 Quantity (One EA), Hold Open Device, WTRT Door No. A1-79-4, page 15/21 of 2.3
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 624-8468311 Rev L, Steel Door List
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each hold open device, located in 1.2, identified in 1.3, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Fabricate and install each new hold open device identified in 1.3 and located in 1.2, using 2.2 for guidance and as designated by the
SUPERVISOR.
3.2.1 Template exact size, configuration, and location from existing shipboard conditions, using 2.2 for guidance.
3.2.2 Chip and grind each surface flush and smooth in way of
existing damage hold open device.
3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A or D, Lines One through 7.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One Columns A and B for preservation of each new hold open device identified in 1.3 and located in 1.2.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of each newly installed hold open device installed in 3.2 and located in 1.2. Allowable binding and
SSP: BAHR-005-25 2 of 2 ITEM NO: 167-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
sticking: None.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-11-001
COAR: 26 PCN: CG03-1044
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 167-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Cage/Wire Mesh Gate Installation; accomplish
1.2 Location of Work:
1.2.1 Aviation/AMCM Det Armory (A5-94-2)
1.3 Identification:
1.3.1 Quantity (One EA), 36-inch X 40-inch Cage/Wire Mesh
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 637-8468279 Rev G, General Arrangement A5 level
2.4 783-8468124 Rev B, Grating, Magazine Layouts & Details
2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each armory gate, located in 1.2, identified in 1.3, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Fabricate and install each new cage/wire mesh, located in 1.2, using
2.2 through 2.4 for guidance and as designated by the SUPERVISOR.
3.2.1 Template configuration, material, and location from existing shipboard conditions and as designated by the SUPERVISOR.
3.2.2 Chip and grind each surface flush and smooth in way of
removals.
3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, C or D, Lines One through 7.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26 Columns A and B for preservation of each new cage/wire mesh identified in 1.3 and located in 1.2.
3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.
SSP: BAHR-005-25 2 of 2 ITEM NO: 167-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 436-11-001
COAR: 26 PCN: CC01-0300
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 436-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: A8 Level Intrusion Detection System (IDS) Alarm System;
install
1.2 Location of Work:
1.2.1 Intel Center (A8-93-2-Q)
1.3 Identification:
1.3.1 Intrusion Detection System
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 ICS 705, Version 1.3, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
2.3 432-8497111, Misc IC CKT Mods Incdt to Stbr Mods (A8 LVL)
2.4 436-8498095, Intrusion Detection System Modification
2.5 320-8497110 Rev B, Power and Lighting Mods Incdt to Stbr Mods
2.6 637-8497105, Structural and Joiner Bhd & Outfitting Mods Incdt toStbr Mods
2.7 624-8468286 Rev H, Joiner Door and Passing Window Schedule
2.8 624-8390167 Rev C, Joiner Door Details
2.9 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1 for Original Equipment Manufacturer (OEM) qualified Technical Representative service for installation, adjustment, and testing of the equipment listed in 1.3 and located in 1.2 in accordance with Chapter 7 of 2.2, using 2.3 through 2.9 for guidance. Refer to 4.1 for known source of Technical Representative.
3.1.1 Technical Representative provide each special tool required for installation, adjustment, and testing of equipment listed 1.3, and located in 1.2 in accordance with 2.2.
3.1.2 Prior to commencement of work, contractor shall obtain Ship’s Force signature on Enclosure (Two) as verification of tag out and record tag out serial number using 2.2 through 2.8 for guidance:
Allowance discrepancy: None.
3.1.3 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 through 3.1.2 the SUPERVISOR.
(V)(G) "OPERATIONAL TEST"
3.2 Accomplish an operational test of each new repaired intrusion
SSP: BAHR-005-25 2 of 2 ITEM NO: 436-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
detection system in accordance with Chapter 7 of 2.2.
3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.9.
4. NOTES:
4.1 Known possible source for qualified Technical Representative:
SIDUS, 7352 Trade Street, San Diego, CA 92121, (619) 275-5533
Larry Hagstrom, email: L.Hagstrom@sidus-solutions.com
Tel: (352) 665-1083
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 441-51-001
COAR: 26 PCN: CC01-0289
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 441-51-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Antenna 2-3 Coupler Mount Preservation; accomplish
1.2 Location of Work:
1.2.1 Weather Deck Starboard, A7.5 level
1.3 Identification:
1.3.1 Quantity (One EA), Antenna 2-3 High Frequency (HF) Mount
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 170-004-1000181, AS-4679/U Antenna Outline and Installation Drawing
2.4 801-8494508, Topside Arrangement Drawing
2.5 SB-V35S HF Antenna System, Instruction Manual for SB-V35S HF Antenna System
2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each whip antenna's coupler mount and grounding strap listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack, and each area of damage or distortion, using 2.2 through 2.6 for guidance.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Accomplish the removal of each antenna coupler mount listed in 1.3 and located in 1.2 using 2.2 through 2.6 for guidance.
3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One Columns A, B, C and E for preservation of each new cable bracket identified in 1.3 and located in 1.2.
3.4 Accomplish the installation of each antenna coupler mount and grounding strap with new stainless-steel fastener and Teflon washer listed in 1.3 and located in 1.2 using 2.2 through 2.6 for guidance.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of equipment listed in 1.3 in accordance with ship's procedure and 2.5, using 2.2 through 2.4 for guidance. Allowable malfunction: NONE
SSP: BAHR-005-25 2 of 2 ITEM NO: 441-51-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 5 KT
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1
80100159 84110 3.3
2. 5 KT
Amercoat 240, Dark Gray, MIL- PRF- 23236, One Gallon Kit None 2.1
80100159 83547 3.3
3. 5 KT
Amercoat 240, Haze Gray, MIL- PRF-24635, One Gallon Kit None 2.1
80100138 21864 3.3
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 508-11-001
COAR: 26 PCN: CG03-1068
CC01-0259
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Lagging and Insulation; replace
1.2 Location of Work:
1.2.1 Fan Room/ELECT EQPT (A8-96-0-Q)
1.2.2 Vestibule (A5-96-7-Q)
1.3 Identification:
1.3.1 Quantity (120 LF), Piping Insulation and Lagging, 1-1/4 Inch Pipe Diameter
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 MIL-STD-769K, Insulation Requirements for U.S. Naval Vessels
2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-11 of 2.1 for piping insulation and lagging listed in 1.3 and located in 1.2 using 2.2 for guidance.
3.1.1 Remove mold located on piping, ventilation and bulkhead in 1.2 prior to accomplishing 009-11 of 2.1
3.1.2 Record and retain each directional flow arrow, system
identification, and each miscellaneous sign and marking prior to removing or disturbing existing lagging and insulation, identified in
1.3.1 located in 1.2.1.
3.1.3 Accomplish the requirements of 009-32 of 2.1 for new
insulation, lagging, and each reusable cover to match each surrounding area.
(V)(G) "FINAL ACCEPTANCE"
3.2 Accomplish an inspection of the replaced lagging as identified in
1.3 and located in 1.2 for workmanship and proper fit. Acceptance criteria; Loose or sagging: None.
3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: BAHR-005-25 2 of 2 ITEM NO: 508-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 10 GL
Amercoat 240, Buff, MIL-PRF 23236, One Gallon Kit None 2.1
80100159 84110 3.1.3
2. 10 GL
Amercoat 3234, Soft White None 2.1
80100134 45089 3.1.3
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 512-00-001
COAR: 26 PCN: SERV-L112
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Split Air Condition Cleaning; accomplish
1.2 Location of Work:
1.2.1 Fan Room A6 Level, Radio Module No. 1 (A6-95-2)
1.2.2 Fan Room A6 Level, Radio Module No. 2 (A7-95-2)
1.2.3 Fire/Crash Rescue Team Staging Area (A5-87-1)
1.2.4 Embarked Forces Space (A5-87-2)
1.2.5 Vertrep/Helo/Aviation Crash Locker (A5-87-3)
1.2.6 AVN & AMCM Det Maint Cont/QA (A5-88-1)
1.2.7 Aviation Det Ordinance Configurations (A5-92-2)
1.2.8 Embarked Forces Space (A5-96-2)
1.2.9 Embarked Forces Space (A5-96-6)
1.3 Identification:
1.3.1 Quantity (9 EA), Split Air Conditioner, Model: 42KHG018HS
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 801-8468127 Rev Q, General Arrangement
2.3 S9086-RQ-STM-010/CH-510 Rev 7, Heating, Ventilating, and Air Conditioning Systems for Surface Ships
2.4 512-8468130 Rev D, HVAD Diagram FWD Accommodation
2.5 510-8468302 Rev D, Fan Room Arrangement
2.6 512-7624117 Rev A, Instructions for Ventilation Testing and Balancing
2.7 S9086-RW-STM-010/CH 516 Rev 5, Refrigerant Systems
2.8 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each split air condition ventilation system, listed in 1.3 and located in 1.2, inspecting for damage, each missing access cover, screen, terminal, gasket, fastener and lagging, using 2.2 through 2.5 for guidance.
3.1.1 Inspect each copper refrigerant lines to ensure no cracks or stress points along each unit.
3.1.2 Inspect each belt for wear, cracks, dry rotting, defects, SSP: BAHR-005-25 2 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
alignment and tightness.
3.1.3 Inspect each motor in accordance with Paragraph 510-A.9.3.8 of 2.3.
3.1.4 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 through
3.1.3 to the SUPERVISOR.
3.2 Accomplish cleaning of each split air conditioning, condenser, evaporator and filter, listed in 1.3 and located in 1.2, from weather openings to terminal ends using 2.3 through 2.5 for guidance.
3.2.1 All mechanical cleaning methods must be approved by the SUPERVISOR and minimize damage to lint lined ductwork.
3.2.2 Match mark, remove and clean each wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate. Retain for reuse.
3.3 Accomplish required maintenance of 1.3 identified in 3.1.
(V)(G) ""REFRIGERANT LEVELS"
3.3.1 Accomplish a refrigerant evacuation and charge of equipment listed in 1.3 and located in 1.2 in accordance with 2.7.
3.3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.4.1 to include the refrigerant levels before and after the charge to the SUPERVISOR.
(V)(G) "FINAL CLEANLINESS"
3.4 Accomplish a visual inspection of each cleaned interior surface of each ventilation branch and fan for each ventilation system, listed in
1.3 and located in 1.2, for cleanliness and completion of work prior to installation of each wire mesh screen, damper, orifice plate and access plate.
3.4.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.5 Install each ventilation piece, including wire mesh screen, damper, diverting/balancing plate, orifice plate and access plate, removed in 3.3.2, using 2.3 through 2.5 for guidance.
(V)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test of the ventilation systems cleaned in
3.4 at system operating pressure to ensure ventilation joint tightness.
Allowable leakage: None, No faults, unusual vibration/noise, proper operation in accordance with 2.7.
3.7 Accomplish the requirements of 009-11 of 2.1 for each for new insulation, lagging, and reusable covers.
SSP: BAHR-005-25 3 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.8.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 516-10-001
COAR: 26 PCN: SERV-L113
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Container (CONEX) Refrigeration Unit Box; repair
1.2 Location of Work:
1.2.1 Off Ship, Dockside/Pier Side
1.3 Identification:
1.3.1 Quantity (4 EA), Seabox 541.6, 20 Foot Refrigerated Storage Container, Refrigerant: 7.3 LB (R-134A), Carrier Model No. 69NT40, Part ID Number: NT0630; Part No.: 54-00586-20 of 2.2
1.3.1.1 Quantity (2 EA), Refrigerator
1.3.1.2 Quantity (2 EA), Freezer
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 T-363 Rev E, Operation and Service Manual for 69NT40-561-500 to 599 Container Refrigeration Units
2.3 T-285 Rev I, Operation and Service Manual for 69NT40-511-300 to 399 Container Refrigeration Units
2.4 62-10327 Rev A, Annual Inspection for ThinLINE 69NT40-541, PrimeLINE 69NT561 Container Refrigeration Units
2.5 T-354PL Rev A, Service Parts List for 69NT40 Upflow Container Refrigeration Units
2.6 S0400-AD-URM-010/TUM Rev 8, Tag-out Users Manual
2.7 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
3.1 Provide a Carrier certified Air Conditioning and Refrigeration Technician to accomplish inspection, service, repair, adjustment and testing of each equipment listed 1.3 and located in 1.2 using 2.2 through
2.4 for guidance.
3.1.1 Provide special tooling, materials, laptop and software, and parts required for the accomplishment of this Work Item.
3.1.2 Provide to the SUPERVISOR, documentation that the individual is a Carrier certified Air Conditioning and Refrigeration Technician prior to commencement of work.
3.1.2.1 Provide electrical power to conduct all electrical
testing and operational test.
(V)(G) "PRE-OPERATIONAL TEST"
3.2 Accomplish with the SUPERVISOR and Ship's Force a pre-operational test of each equipment listed in 1.3 and located in 1.2 using 2.2 through
SSP: BAHR-005-25 2 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.4 for guidance. Acceptance Criteria: Pressure, temperature and settings within normal operating parameters.
(V)(G) "VISUAL INSPECTION"
3.3 Accomplish service and inspection of each equipment listed in 1.3 and located in 1.2 including fan motor and refrigerant charge listed in
1.3 and located in 1.2 in accordance with 2.4, using 2.2 and 2.3 for guidance.
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR. Include part numbers, and estimated time to repair for each item listed in 1.3 and located in 1.2.
(V)(G) "TAG-OUT VERIFICATION"
3.4 Contractor must obtain Ship’s Force signature on Enclosure (One) as verification of tag out and record tag out serial number in accordance with 2.6, prior to commencement of work, Allowable discrepancy: None.
(V)(G) "LEAK TEST"
3.5 Clean each condenser coil inside and out, check for leaks of each equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Allowable leakage: None
3.5.1 Check for refrigerant charge using 2.2 and 2.3 for guidance.
(V)(G) "INSPECT DOOR SEAL"
3.6 Inspect each door seal, window, hinge, fitting, fastener and front-loading gasket. Test and operate each refrigerated container door safety devices and door seal of the equipment listed in 1.3 and located in 1.2 using 2.2 through 2.4 for guidance. Accept/Reject Criteria: no wear, tear, damage and properly seated.
(V)(G) "OPERATIONAL TEST"
3.7 Accomplish operational test of each equipment listed in 1.3 and located in 1.2 under systems normal operating pressure and temperature in accordance with 2.3 and 2.4. Allowable leakage or malfunction: None.
3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.7.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: BAHR-005-25 3 of 3 ITEM NO: 516-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 522-00-001
COAR: 26 PCN: CG03-1016
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 2 ITEM NO: 522-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Magazine Sprinkler Station; repair
1.2 Location of Work:
1.2.1 Aviation AMCM Det Armory (A5-94-2-A)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 529-8468148 Rev F, Sprinkling Diagram
2.3 S9522-AA-HBK-010 Rev 4, Magazine Sprinkling Systems
2.4 S6435-Q2-OMI-010 Rev 3, Washdown Counter Measure Control Valve
2.5 MIL-STD-777F Change 2, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships
2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a visual inspection of each Magazine Sprinkler Station, located in 1.2, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the
SUPERVISOR.
3.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 9 Columns A, B, D and E for preservation of each new Magazine Sprinkler Station located in 1.2.
3.3 Install each valve, and install new gaskets and fasteners conforming to 2.4, including Category and Group N-2 of 2.5. All required valves provided by Ship's Force.
(V)(G) "OPERATIONAL TEST"
3.4 Accomplish an operational test of each valve and piping system at nominal system operating pressure and temperature in accordance with 2.3.
Allowable external leakage: None.
3.5 Accomplish the requirements of 009-11 of 2.1 for each new and disturbed insulation and lagging.
3.6 Accomplish the requirements of 009-32 of 2.1 for each new and
SSP: BAHR-005-25 2 of 2 ITEM NO: 522-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
disturbed surface.
3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 5 GL
Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1
80100159 84110 3.2
2. 10 GL
Amercoat 240, Haze Gray, MIL- PRF- 23236, One Gallon Kit None 2.1
80100159 83543 3.2
3. 5 GL
MIL-DTL-24607,
Gray None 2.1
80100134 45091 3.2
5.2 PUSH MATERIAL:
1. None.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 526-11-001
COAR: 26 PCN: SERV-L110
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO
SSP: BAHR-005-25 1 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Deck Drain; clean
1.2 Location of Work:
1.2.1 A1-A8 Level
1.3 Identification:
1.3.1 Quantity (400 LF), Plumbing Deck Drain Piping
1.3.2 Quantity (28 EA) Deck Drains identified in Attachment A
2. REFERENCES:
2.1 Standard Items, (FY25)
2.2 528-8468142 Rev F, Plumbing Drains System Diagram
2.3 S9086-RK-STM-010/505 Rev 6, Piping Systems
2.4 S9086-VD-STM-010/CH631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General
3. REQUIREMENTS:
(V)(G) "VISUAL INSPECTION"
3.1 Accomplish a joint visual inspection with the SUPERVISOR of each equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, and to determine required repair, using 2.2 and 2.3 for guidance
3.1.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.
(V)(G) "HYDRO BLAST"
3.2 Accomplish hydro blasting, cleaning and flushing of deck drain and drain piping system, 400 linear feet free of obstructions and foreign matter located in 1.2, in accordance with paragraph 505-4.7 of 2.3, using
2.2 and 2.3 for guidance.
(V)(G) "POST REPAIR UNOBSTRUCTED FLOW TEST"
3.3 Accomplish post-repair unobstructed flow test for each deck drain located in 1.2 using clean fresh water for a minimum of 30 minutes.
Allowable leakage and obstruction: None.
3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.
SSP: BAHR-005-25 2 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
4.1 Embarkation Laundry Room.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: BAHR-005-25 3 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SSP: BAHR-005-25 4 of 4 ITEM NO: 526-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 573-41-001
COAR: 26 PCN: VM04-L006
VM04-L002
VM04-L004
BWST FILE NO: 000-001 CMP: NONE
REVISED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .