S-7 Fire and Safety Plan Checklist.pdf
PDF 299 KB Posted
- Attached to
- USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
- Solicitation number
- N6817125R0001
About this file
This document is a Fire and Safety Plan Checklist that is part of the draft solicitation for the USS LEWIS B. PULLER (LBP) FORCE GENERATION RISK REDUCTION (FGRR) contract opportunity. The checklist details the requirements for the contractor's written fire and safety plan, including policies on fire response, coordination with the local fire department, plans for firefighting, flooding, rescue, and medical emergencies, as well as required training and inspection procedures. It also covers specific requirements for disabling fixed fire suppression systems, providing temporary fire-fighting appliances, and tie-ins to the ship's firefighting systems. The contractor must address these elements in their technical proposal for the FGRR contract, which includes a Regular Overhaul-Dry Dock (ROH-DD), layberth with services, and a Mid-Term Availability (MTA) from May 28, 2025 to September 30, 2026. The contract is being solicited by the Department of the Navy Naval Supply Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-2a part1 MSC ROH WI.pdf | ||
| J-5_MSC Facility Survey.pdf | ||
| J-2c FDRMC MTA WI.pdf | ||
| J-1c MTA.xlsx | XLSX spreadsheet | |
| N6817125R001 LBP FGRR Solicitation.pdf | ||
| S-10 LBP Planned Maintenance.xlsx | XLSX spreadsheet | |
| S-3_Foreign ACP Questionnaire.pdf | ||
| S-4_Foreign National Cert.pdf | ||
| J-4 GFP LIST.xlsx | XLSX spreadsheet | |
| J-2b MSC Lay berth_IA WI.pdf | ||
| J-1a ROH.xlsx | XLSX spreadsheet | |
| S-9 Vessel Status Report.pdf | ||
| S-6 PPQ.pdf | ||
| S-5 _PP Information.pdf | ||
| J-2a part2 MSC ROH WI.pdf | ||
| S-8 MSC DRY DOCK Sheet.pdf | ||
| S-2_QA Checklist updated.pdf | ||
| S-1_NDA.pdf | ||
| J-2c MSC MTA WI.pdf | ||
| J-2a FDRMC ROH WI.pdf | ||
| J-1b Lay berth_IA.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Para. Description Provided (Y/N/Partial)
7.1 Contractors Tech Proposals included with Tech Eval
7.1.1 Written Fire and Safety Plan to include the following:
7.1.1.a Contractor's written policy that details S/Y responsibility as detailed in 29 CFR 1915.502(.:i) (b)
7.1.1.b Contractor's written policy that details S/Y responsibility as detailed in 1915.S0S(b)(2) which details the following:
7.1.1.b.i Types of fire incidents the S/Y will respond to
7.1.1.b.ii Detail liaison between S/Y and fire department
7.1.1.b.iii Fire Plan that includes the following: -------- 7.1.1.b.iii(a) How S/Y is going to acquire fire department
7.1.1.b.iii(b) S/Y to apprise fire department of S/Y operation(s)
7.1.1.b.iii(c) S/Y fire dept connection is compatible with fire department
7.1.1.b.iii(d) S/Y not permitted to use incompatible hose connections
7.1.1.c Contractors' facility for protection from fire and flooding
7.1.1.d Agreement with local municipal response organization
7.1.1.e FF Response Plan
7.1.1.f Flooding response plan
7.1.1.g Rescue response plan
7.1.1.h Medical emergency response plan
7.1.1.i Dewatering equipment available
7.1.1.j Alternate FF provisions provided in case of disable fixed systems
7.1.1.k Preventative measures against fire and flooding
7.1.1.l Measures to account for personnel in the event of an emergency; crew muster locations
7.1.1.m Name and numbers of contact personnel for emergency
7.1.1.n Mitigation actions for disable fixed FF system(s)
7.1.1.o POC for conducting daily joint safety inspection walkthrough (Linked to Para. 7.16)
7.1.1.p Incident Command location
7.1.1.q Hot Work procedures
7.1.1.r Available facility and pier FF riser sizes, pressure and flow rates
7.1.1.s Available plan to stop the spread of the fire and smoke; compartment closure plan and quick disconnect fittings plan
7.1.1.t Planned access cuts
7.1.2 Fire and Safety Plan must address the following: -------- 7.1.2.a Fire Control Plan that details ingress and egress routes and Firefighting{FF) appliances; also FCP is to be posted in Machinery Space ingress/egress and gangway
7.1.2.b Weather the Ships firemain can be pressurized or used due to work detailed in this work package {Linked to Para. 7.8)
7.1.2.c Stow Temp FF appliances where not to create blockage
7.2 Temporary portable fire extinguishers {PFEs) being
provided by the S/Y in the PFE Table.
7.3 Weather the Fixed Gaseous Fire Suppression System
was going to be disable or remain enabled was not detailed.
Also if disabled the S/Y providing an ABS External Specialist to disable system. {Linked to Para. 7.4.7)
7.4 The following actions that the S/Y must take prior to
disabling the disabling Fixed Fire Suppression Systems
7.4.1 Providing adequate temporary FF appliances before
work
7.4.2 Disabled system{s) will be locked out
7.4.3 Bilges cleaned and will remain free of oil
7.4.4 Minimize oil movement
7.4.5 Ensure doors and scuttles remain accessible for escape
7.4.6 When being worked on CO2 doors must remain open
7.4.7 ABS approved vendors will disable Fixed Fire
Suppression Systems{Linked to Para. 7.3)
7.4.7.a Post placards detailing Fixed Fire Suppression disabled as entrance doors leading to protected space and gangway
7.5 Safety or fi re training prevention training that was to
occur upon arrival was:
7.5.1 Shipyard Safety Awareness Training (SSAT)
7.5.2 Conducting FF and fi re prevention training
7.5.3 Quick disconnect fitting training
7.5.4 Training on what to do when discovering a fire
7.6 - 7.6.7 S/Y provided temporary FF manifolds or any specifics of said FF manifolds
7.7 - 7.7.5 S/Y tie into the ships Fire ma in
7.8 Contractor’s proposal detailing if any part of the Ships
firemain was going to be disabled; and if so what temporary FF manifolds are to be provided (Linked to Para. 7.1.2.b)
7.9 - 7.9.4 5/Y Fire Watch and Hot Work Policy was not provided. (Linked to Para. 7.1.1.q)
7.10 Hot Work Chit procedure
7.11 After a fi re notify OMT immediately, prelim report at
24 hours, final at 5 days
7.12 S/Y communication plan
7.13 S/Y use of flammable gas cylinders stowage and usage
onboard
7.15 - 7.15.3 Quick disconnect fitting plan and securing during an actual fire
7.16 - 7.16.2.i S/Y inspection plan with S/Y Rep and OMT/Ships Force