J-5_MSC Facility Survey.pdf
PDF 550 KB Posted
- Attached to
- USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION Federal contract opportunity
- Solicitation number
- N6817125R0001
About this file
This document is a Government form titled "MSC Ship Repair Facility Survey" that collects detailed information about a shipyard's capabilities, such as the dimensions and lifting capacities of dry docks, cranes, and berths, as well as the size and layout of fabrication shops and other infrastructure. The survey requests information on the shipyard's history, navigational restrictions, subcontracted services, employment levels, and certifications. It also requires the submission of supplementary documents like a plot plan, depth charts, equipment lists, and past project experience. This survey is likely used by the Military Sealift Command (MSC) to assess the suitability of shipyards to perform repair and maintenance work on MSC vessels.
The related federal contract opportunity is for the "USS LEWIS B. PULLER FORCE GENERATION RISK REDUCTION (FGRR)" which includes a Regular Overhaul-Dry Dock (ROH-DD), a layberth with services, and a Mid Term Availability (MTA) from May 28, 2025 to September 30, 2026. This is a pre-solicitation, and interested parties must sign Attachment S-1 to receive the full solicitation documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-2a part1 MSC ROH WI.pdf | ||
| J-2c FDRMC MTA WI.pdf | ||
| J-1c MTA.xlsx | XLSX spreadsheet | |
| N6817125R001 LBP FGRR Solicitation.pdf | ||
| S-10 LBP Planned Maintenance.xlsx | XLSX spreadsheet | |
| S-3_Foreign ACP Questionnaire.pdf | ||
| S-4_Foreign National Cert.pdf | ||
| J-4 GFP LIST.xlsx | XLSX spreadsheet | |
| J-2b MSC Lay berth_IA WI.pdf | ||
| J-1a ROH.xlsx | XLSX spreadsheet | |
| S-9 Vessel Status Report.pdf | ||
| S-6 PPQ.pdf | ||
| S-5 _PP Information.pdf | ||
| S-7 Fire and Safety Plan Checklist.pdf | ||
| J-2a part2 MSC ROH WI.pdf | ||
| S-8 MSC DRY DOCK Sheet.pdf | ||
| S-2_QA Checklist updated.pdf | ||
| S-1_NDA.pdf | ||
| J-2c MSC MTA WI.pdf | ||
| J-2a FDRMC ROH WI.pdf | ||
| J-1b Lay berth_IA.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMSCINST 4330.21C
Report Control Symbol: MSC 4330-4
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.
DATE:
To:
Commander (Code N4) Military Sealift Command Washington, DC 20390
SHIPYARD AND ADDRESS SHIPYARD DATA
Telephone No:
Telex No:
Date Founded:
BUILDING WAYS (M. L. W.)
NO.
OF
WAY
LAUNCHING
(check one)
DIMENSIONS MAXIMUM SHIP SIZE
(ton 2,240 lbs)
DEPTH OF WATER CRANES SERVING WAY
OVER
WAY END
AT DROP
OFF NO. TYPE
LIFT CAPACITY
(std. tons)
CERTIFICATION DATE &
CERTIFIED BY WHOM
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
END
SIDE
BASIN
SLAB
LENGTH:
WIDTH:
DEPTH:
LENGTH:
WIDTH:
DEPTH:
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W. TIDAL RANGE (DIFF. OF M.L. - M.H.) IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
IS SNUBBING NECESSARY?
YES NO
MSC FORM 4330/26 (12-83) SHEET 1 OF 5
USS Hershel ‘Woody’ Williams FY-24 MTA Attachment J-5 (MSC Ship Repair Facility Survey)
MSC SHIP REPAIR FACILITY SURVEY (continued)
SHIPYARD:
BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (mean high water)
NO. TYPE
LENGTH
(actual & usable)
WATER DEPTH
(M. L. W.)
HEIGHT
OF
DOCK
(M. L. W.)
USE
REPAIR/
OUTFIT-
TING
SERVICES AVAILABLE
(use abbreviation of service below)
DOCK
NO.
MATERIAL TYPE
IN-
BOARD
OUT-
BOARD
Floating---(FD) Graving---(GD) Marine Railway (MR)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
DRY DOCKS (continued)
DOCK
NO.
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH CLEAR WIDTH DEPTH/DRAFT
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES OVERALL
at coping (GD), a keel blocks on cradle (MR), on PONTOON
(FD)
at top cradle (MR), at top inboard wing wall (FD, GD) at keel block height
OVER
SILL
(GD)
OVER
FLOOR
OVER
KEEL
BLOCKS
LEGEND (abbreviation of services)
Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I. Air -------- A - C.F.M. - P.S.I. Electric Power --- E - V - DC - AMP Sanitary Sewer -- SS - YES - NO
MSC FORM 4330/26 (12-83) SHEET 2 OF 5
SHIPYARD
BERTHING, SHIP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
NO TYPE CAPACITY
(STD TONS)
MAX REACH/
MAX SPAN
(BRIDGE)
CAPACITY AT
REACH
BOOM
LENGTH
HEIGHT
HINGE
HEIGHT OF HOOK
ABOVE BASE
AT OUT REACH
HEIGHT OF HOOK
(BRIDGE)
AREA SERVED DATE CERTIFIED, CERTIFIED BY WHOM &
DATE CERTIFICATION EXPIRES
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.) DISTANCE TO NEAREST
RAILROAD CONNECTION
DISTANCE TO NEAREST
AIRPORT (Identify)
MINIMUM CHANNEL (depth/width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
LIST ANY OTHER RESTRICTIONS (include projects under construction which will alter navigational restrictions)
MSC FORM 4330/26 (12-83) SHEET 3 OF 5
PRINCIPAL SHOPS AND BUILDINGS
NAME OF SHOP
OR BUILDING
DIMENSIONS OF
SHOP OR BUILDING
LARGEST EXIT ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED) WIDTH HEIGHT
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
CARPENTER
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY RAW STEEL STORAGE (SQ. FT.) _________________________________________
WELDING AND ASSEMBLY (SQ. FT.) ______________________________________
RIGGER
LIST TYPES OF WORK NORMALLY SUBCONTRACTED ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE
LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION
MSC FORM 4330/26 (12-83) SHEET 4 OF 5
EMPLOYMENT CURRENT CURRENT
SHIFTS
POTENTIAL MAXIMUM MAXIMUM
SHIFTS
NORMAL NORMAL
SHIFTS
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT.
3. FOR EACH SHOP LISTED ON SHEET 4. A LIST OF MACHINE TOOLS AND EQUIPMENT WHICH
INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUDE, NAME OF SHIP, DATES, AND DOLLAR AMOUNT OF JOB)
OF SHIP REPAIR WORK WHICH HAS BEEN ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP REPAIR (INCLUDE AS
A MINIMUM JOBS HELD, YEARS HELD, ONE LINE DESCRIPTION OF DUTIES FOR EACH JOB).
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN LIST EACH FACILITY AND
ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM (NAME/TITLE/PHONE
NUMBER).
MANAGEMENT, ADMINISTRATION
PROFESSIONAL, ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
MSC FORM 4330/26 (12-83) SHEET 5 OF 5
File details come from the government source that posted it. Updated .