USS blue ridge 5C1 dsra modernization bundle 5
Closed Solicitation Posted
- Solicitation number
- N6264925RA058
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J999 Non-Nuclear Ship Repair (West)
- Place of performance
- Yokosuka Kanagawa Japan
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command is seeking a contractor to perform comprehensive ship repair, maintenance, and overhaul services for the USS BLUE RIDGE (LCC-19) during a Docking-Selected Restricted Availability (DSRA) at the US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work encompasses five Task Group Instructions with nine test phases covering various ship repair, overhaul, preservation, and replacement activities, along with requirements for testing, quality assurance, technical documentation, and coordination of all contracted workers to prevent work stoppages. Contractors must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) and be authorized to operate and do business in Japan. The solicitation utilizes a lowest price technically acceptable (LPTA) evaluation process with three proposal volumes covering price, technical acceptability (including management/staffing plans and milestone schedules), and past performance information. Proposals are due by September 22, 2025, at 10:00 AM Japan Standard Time, with the anticipated contract period of performance running from July 21, 2026, through December 19, 2027.
This solicitation does not utilize any set-aside designations and is open to all qualified contractors meeting the specified requirements. The contract includes a Growth Contract Line Item (CLIN) to accommodate anticipated additional work through a Growth Management Request (GMR) process, though no specific award values or budget ranges are disclosed in the available documentation. The work involves multiple technical disciplines including HVAC system modifications, piping system upgrades, ventilation testing, alarm system testing, and structural modifications across numerous ship compartments and systems. Performance will take place at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan, with the contractor responsible for all labor, subcontractor management, supervision, quality control, safety management, environmental management, materials, equipment, and transportation necessary to complete the modernization requirements. The solicitation has undergone multiple amendments, including extensions of proposal deadlines and revisions to Task Group Instructions with updated performance periods.
Notice text
4 versions
Update #4 · Latest ·
The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of five (5) Task Group Instructions (TGIs) with nine (9) Test Phases of various ship
repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.
The anticipated contractual Period of Performance (POP) is 21-JUL-2026 TO 19-DEC-2027.
PLACE OF PERFORMANCE: Commander, Fleet Activities Yokosuka (CFAY) Naval Base
OFFER: Offerors must provide all information required by this solicitation no later than 22 Sep 2025 at 10:00 AM Japan Standard Time (JST). *NOTE: On 21 Aug 2025, Solicitation Amendment N6264925RA0580002 was issued to re-open the above solicitation because of the revised TGIs with new POP (From 21 Jul 2026 to 19 Dec 2027). The closing date in response to this solicitation amendment is 22 Sep 2025 at 10:00 AM Japan Standard Time (JST).
On 28 Aug 2025, Solicitation Amendment N6264925RA0580003 was issued to incorporate changes in section A and section L in conjunction w ith the POP change, which were not reflected in the previously issued Solicitation Amendment No. N6264925RA0580002. The closing date for this solicitation amendment remains 22 Sep 2025 at 10:00 AM Japan Standard Time (JST).
On 19 Sep 2025, Solicitation Amendment No. N6264925RA0580004 is to incorporate an administrative change in the wording 1) at section C under block 16. REMARKS on page tw o (2) in the Contract Data Requirements List (CDRL). The closing date for this solicitation amendment remains 22 Sep 2025 at 10:00 AM Japan Standard Time (JST).
References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.
Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)
When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.
When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.
If there is a time limit on your offer, you must specify this at submission of your proposal.
If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.
Update #3 ·
The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of five (5) Task Group Instructions (TGIs) with nine (9) Test Phases of various ship
repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.
The anticipated contractual Period of Performance (POP) is 21-JUL-2026 TO 19-DEC-2027.
PLACE OF PERFORMANCE: Commander, Fleet Activities Yokosuka (CFAY) Naval Base
OFFER: Offerors must provide all information required by this solicitation no later than 22 Sep 2025 at 10:00 AM Japan Standard Time (JST). *NOTE: On 21 Aug 2025, Solicitation Amendment N6264925RA0580002 was issued to re-open the above solicitation because of the revised TGIs with new POP (From 21 Jul 2026 to 19 Dec 2027). The closing date in response to this solicitation amendment is 22 Sep 2025 at 10:00 AM Japan Standard Time (JST).
On 28 Aug 2025, Solicitation Amendment N6264925RA0580003 was issued to incorporate changes in section A and section L in conjunction w ith the POP change, which were not reflected in the previously issued Solicitation Amendment No. N6264925RA0580002. The closing date for this solicitation amendment remains 22 Sep 2025 at 10:00 AM Japan Standard Time (JST).
References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.
Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)
When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.
When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.
If there is a time limit on your offer, you must specify this at submission of your proposal.
If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.
Update #2 ·
The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of five (5) Task Group Instructions (TGIs) with nine (9) Test Phases of various ship
repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.
The anticipated contractual Period of Performance (POP) is 12-Jan-2026 through 12-Jun-2027.
OFFER: Offerors must provide all information required by this solicitation not later than 7 Jul 2025 at 10:00AM Japan Standard Time (JST). *NOTE: On 13 Jun 2025, Solicitation Amendment N6264925RA0580001 was issued to extend the above soliciation closing date from 7 Jul 2025 at at 10:00AM to 4 Aug 2025 at 10:00AM Japan Standard Time (JST) in conjunction with a contractor's question.
References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.
Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)
When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.
When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.
If there is a time limit on your offer, you must specify this at submission of your proposal.
If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.
Update #1 ·
The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of five (5) Task Group Instructions (TGIs) with nine (9) Test Phases of various ship
repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion.
The anticipated contractual Period of Performance (POP) is 12-Jan-2026 through 12-Jun-2027.
OFFER: Offerors must provide all information required by this solicitation not later than 7 Jul 2025 at 10:00AM Japan Standard Time (JST).
References in the Work Items will be provided to offerors via DoD safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.
Please email request for references to: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil)
When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001.
When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022.
If there is a time limit on your offer, you must specify this at submission of your proposal.
If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section.
Files
Show all 42