This document is a Task Group Instruction (TGI) for a modification of the Deaerating Feed Tank (DFT) Sightglass Indicator Drain Piping on the USS Blue Ridge (LCC-19). The work is located in the Fire Room (8-76-0-E) and involves replacing and testing four drain valves: two 1-inch IPS and two 0.50-inch IPS globe, inline stop valves. The project includes removing existing piping, fabricating and installing new piping, disassembling and reassembling valves, performing visual inspections, and conducting hydrostatic and seat tightness tests.
The contract specifications require specific cleanliness standards for the piping system (Level II, Class P-2), with potential asbestos and lead hazards noted. The contractor work is scheduled to start on 7/21/2026 and complete by 11/21/2027. Materials will be provided as kitted material by Puget Sound Naval Shipyard, and SRF-JRMC will provide additional services including crane rigging, utility services, and safety inspections. The job order number is 3819P25501, with Shintaro Iwai and Hidekuni Shinmei as key personnel involved in the planning and approval process.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: DFT SIGHTGLASS DRAIN AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*(RE) F/O - S/A 80992K, ACCOMPLISH MOD OF DFT SIGHTGLASS DRAIN PP IN 8-76-0-E
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHINTARO IWAI 234. 315-243-0099 25 MAY 2024
APPROVED BY: CODE PHONE DATE
HIDEKUNI SHINMEI 234. 315-243-2371 25 MAY 2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
CLASS P-2 PIPING
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: DFT SIGHTGLASS DRAIN AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 QA28
(1)
J-1 M1-2
QA28
(1)
1. SCOPE/PURPOSE
1.1 Title: S/A 80992K, Modification of Deaerating Feed Tank Sightglass Indicator Drain Piping; accomplish
1.2 Location of Work:
1.2.1 Fire Room (8-76-0-E)
1.3 Identification:
1.3.1 Quantity (One Lot), Deaerating Feed Tank (DFT) Sightglass Indicator Drain Piping Remarks: See 2.3 for detail.
1.3.1.1 Quantity (2 EA), DFT Drain Valve
Size: 1.00 Inch IPS Type: Globe, Inline Stop Valve No: V1 Remarks: upper and lower level
APL: 88A080188
1.3.1.2 Quantity (2 EA), DFT Drain Valve
Size: 0.50 Inch IPS Type: Globe, Inline Stop Valve No: V2 Remarks: upper and lower level
APL: 88A050932
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 7/21/2026
1.7 Contractor work completion date: 11/21/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY25 Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 208-
8516915
DEAERATING FEED TANK SIGHT
GLASS INDICATORS DRAIN
MODS
A Y AL
L
4 DWG 803-
2177525
1/4"-2" BW & SW 900 LB ASME
Valve
Y Y AL
L
5 TM S9086-
CM-STM-
020/CH-
078V2
Gaskets and Packing - N
6 TM S9086-
RK-STM-
010/CH-505
Piping Systems 6 N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing, fabricate and install each new DFT sightglass drain piping listed in 1.3.1 in accordance with 2.3.
5.1.1 Remove corrosion preventive compound of each valve listed in 1.3.1.1 and 1.3.1.2.
5.1.1.1 Disassemble each valve as required for cleaning, using 2.4 for guidance.
5.1.1.2 Accomplish a visual inspection of the groove pin of each valve in accordance with Paragraph 4 of NABESEALOGCENDENT PORTSMOUTH BULLENTIN 4855-Ser-6231/B11-2-22nov2011 of 2.4.
5.1.1.3 Assemble each valve with bonnet gasket and gland packing.
5.1.1.4 Bonnet gasket must conform to MIL-G-24716.
5.1.1.5 Gland packing must conform to MIL-P-24503 and MIL-P-24583 combination in accordance with Table 078-9- 1 of 2.5.
5.1.1.6 Thread lubrication must be in accordance with General Note 4.C of 2.4.
5.1.1.7 Accomplish a Hydrostatic test of each valve, using 2.3 and 2.4 for guidance.
5.1.1.8 Tolerance of hydrostatic test pressure and rounded off to graduation of test pressure gauge/gage must be in accordance with Paragraph 505-11.1.3.18 of 2.6.
5.1.1.9 Hydrostatic test equipment must conform to the requirements in Paragraph 505-11.1.3 of 2.6.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.1.1.10 Accomplish the requirements of 009-71 of 2.1 for strength test, using clean fresh water at 50 PSIG for each valve.
5.1.1.11 Accomplish a seat tightness test of each valve for seat tightness in the direction tending to open each valve, using clean fresh water at 50 PSIG for a minimum of 3 minutes. Maximum allowable leakage: 10 cubic centimeters
(cc) per hour.
(V)(G) “SEAT TIGHTNESS TEST”
5.1.1.12 Do not exceed the handwheel closing force specification in Table 505-11-2 of 2.6.
5.1.1.13 Document each shop test results on QA Form 28, Enclosure-01-1.
5.1.1.14 After satisfactory completion of each shop test, drain water from each valve and blow with clean dry air to remove moisture.
5.1.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.1.2.1 Accomplish nondestructive testing in accordance with Line 13 for liquid penetrant testing accomplished to satisfy operational pressure test option.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed DFT drain piping systems listed in 1.3.1.
5.1.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-02-1.
5.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Notes:
5.3.1 Planner: Code 234 S. Iwai, 243-0099
Planner: Code 232 Y. Abematsu, 243-2492
5.3.2 All material listed in 2.3 will be provided as kitted material by Puget Sound Naval Shipyard (PSNS).
5.3.3 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.3.4 JCN EXSA-ZBV5 is related to this TGI.
5.4 Government Furnished Material (GFM):
5.4.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.5 SRF-JRMC will provide the following service work: (TGI No. 3819P25501S02)
5.5.1 [C740] Crane and crane rigging service.
5.5.2 [X99E] Utility service, electrical.
5.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.5.6 [C133] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
DFT SIGHTGLASS DRAIN AY A 0 0
CU PHASE TITLE:
*(RE) F/O - S/A 80992K, ACCOMPLISH MOD OF DFT SIGHTGLASS DRAIN PP IN 8-76-0-E
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
DFT SIGHTGLASS DRN PP DFT SS DRN COV V1 LO V- DFT SS DRN COV V1 UP V- DFT SS DRN COV V2
LO V- DFT SS DRN COV V2 UP V-
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P25501A01-QA28-01.docx) saved on 20-MAY-2024 0000.
2. ENCLOSURE-02 (3819P25501A01-QA28-02.docx) saved on 20-MAY-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P25501 A01
CU PHASE DESCRIPTION:
The purpose of this TGI to accomplish modification of DFT sightglass drain piping.
Location of Work: Fire room (8-76-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 PFTR HRs, WELD HRs, IMCH HRs, INSL HRs, ELEC
HRs, QA HRs, PNTR HRs, RGRS HRs
22 KE PC
5.2 PNTR: HRs, QA: HRs 22 KE PC
Piping Work CFM for marine chemist, firewatch cost, NDT cost, lead sampling/analysis cost, asbestos sampling/analysis cost, painting material, and MISC such as welding rod, gas, saw blades, fastener, gasket, lagging pad material, plastic bag/sheet, and etc.
22 MQ CS
Process Funding Document 10 CT OM
TGI NO.: DFT SIGHTGLASS
DRAIN
AY A 0
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
DFT SIGHTGLASS DRAIN AY A 0 0
CU PHASE TITLE:
*(RE) F/O - S/A 80992K, ACCOMPLISH MOD OF DFT SIGHTGLASS DRAIN PP IN 8-76-0-E
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P25501 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PIPE,METALLIC, 1"IPS, C-
STEEL, SCH40
ORIG:C-234 S.IWAI 243-0099
ORDERED FOR KTR
9B 4710 009619174 NA 4 N 41215119 5/FT
002 M PIPE,METALLIC, 1/2" IPS, C-
STEEL, SCH40
ORIG:C-234 S.IWAI 243-0099
ORDERED FOR KTR
9B 4710 009935036 NA 4 N 41215122 10/FT
003 M PIPE HANGER, 1/2"IPS, PIPE
HANGER, 1/2"IPS, MATERIAL:
STEEL, TYPE-4, LEG: 15",
LINER THK: 1/4"THK, LINER:
NEOPRENE, FASTENER: CRES
316, MODIFY FASTENER FROM
STEEL TO CRES 316
ORIG:C-234 S.IWAI 243-0099
ORDERED FOR KTR
9B 4730 LL9602132 NA 4 N 41217487 2/EA
200 M GASKET,S, ORIG: C232 Y.
ABEMATSU, 243-2492
ORDERED FOR KTR
FOR VALVE V2
9B 5330 015386718 NA 4 N 41165015 2/EA
NOTES:
TGI NO.: DFT SIGHTGLASS
DRAIN
AY A 0
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
201 M GASKET,SPIRAL WOUND,
ORIG: C232 Y. ABEMATSU,
243-2492
ORDERED FOR KTR
FOR VALVE V1
9B 5330 013551459 NA 4 N 41165002 2/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 DFT SIGHTGLASS DRAIN AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P25501 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 DFT SIGHTGLASS DRAIN AY A 0
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
SHOP TEST RECORD Page 1 of 4
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZBV5 KTR N/A DFT DRAIN VALVE V1 (L-1) UPPER LEVEL
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 208-8516915 Rev “A”
B. DWG 803-2177525 Rev. “Y”
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
USED
PRESSURE
ACTUAL
MINIMUM
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.1.10 A, B Clean Fresh Water
50 PSIG 30 minutes None
ST 5.1.1.11 A, B
Clean Fresh Water
50 PSIG 3 minutes 10 cc per hour
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
3819P25501A01 ENCLOSURE-01-1 Total 1
SHOP TEST RECORD Page 2 of 4
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZBV5 KTR N/A DFT DRAIN VALVE V1 (L-2) LOWER LEVEL
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 208-8516915 Rev “A”
B. DWG 803-2177525 Rev. “Y”
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.1.10 A, B Clean Fresh Water
50 PSIG 30 minutes None
ST 5.1.1.11 A, B
Clean Fresh Water
50 PSIG 3 minutes 10 cc per hour
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
SHOP TEST RECORD Page 3 of 4
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZBV5 KTR N/A DFT DRAIN VALVE V2 (L-3) UPPER LEVEL
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 208-8516915 Rev “A”
B. DWG 803-2177525 Rev. “Y”
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.1.10 A, B Clean Fresh Water
50 PSIG 30 minutes None
ST 5.1.1.11 A, B
Clean Fresh Water
50 PSIG 3 minutes 10 cc per hour
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
SHOP TEST RECORD Page 4 of 4
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZBV5 KTR N/A DFT DRAIN VALVE V2 (L-4) LOWER LEVEL
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 208-8516915 Rev “A”
B. DWG 803-2177525 Rev. “Y”
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.1.10 A, B Clean Fresh Water
50 PSIG 30 minutes None
ST 5.1.1.11 A, B
Clean Fresh Water
50 PSIG 3 minutes 10 cc per hour
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
3819P25501A01 ENCLOSURE-02-1 TOTAL 1
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZBV5 KTR N/A DFT SIGHTGLASS DRAIN PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 208-8516915 Rev. A
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.1.4 A,B Clean Fresh Water
50 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)