TGI_3819P52302A01_redact.pdf
PDF 1 MB Posted
- Attached to
- USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 5
- Solicitation number
- N6264925RA058
About this file
This document is a Task Group Instruction (TGI) for modification of Countermeasure Washdown (CMWD) Piping on the USS Blue Ridge (LCC-19). The project involves modifying CMWD piping systems across multiple locations throughout the ship, including various fan rooms, passages, living spaces, and compartments. The work is scheduled to begin on 7/21/2026 and be completed by 10/9/2027, with modifications to piping groups, installation of new valves, and structural work.
Key technical requirements include maintaining cleanliness for piping systems at Level III, working with Class P-2 and P-3B piping, and addressing fire zone boundaries. The project involves multiple system groups, including valve installations, piping modifications, and shell plating work. Special requirements include hot work in magazine and adjacent spaces, and the project requires precise welding, testing, and inspection procedures, including mechanical joint tightness tests, hydrostatic tests, and non-destructive testing of welds. The work will be performed by contractors under the supervision of naval personnel, with quality assurance and inspection processes closely monitored.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: S/A 81205K CMWD PP AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - (RE) S/A 81205K, ACOOMPLISH MODS OF CMWD PP
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHINICHI ITO 234. 315-243-4297 22-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 22-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
CLASS P-2 PIPING.
CLASS P-3B PIPING.
This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is Required.
HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: S/A 81205K CMWD PP AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-11 Sketch (1)
QA20
(1-4)
J1-4 QA28
(1)
QA17
(1)
M1-5 QA28
(1-5)
Engrg Inst (1)
Map (1-3)
1. SCOPE/PURPOSE
1.1 Title: S/A 81205K, Modification of Countermeasure Washdown (CMWD) Piping; accomplish
1.2 Location of Work:
1.2.1 Anchor and Line Handling Space (2-F-0-Q)
1.2.2 CIWS Local Control Room, Storeroom and Workshop No. One (1-C-0-Q)
1.2.3 Main Deck Weather, Frames between B and C, Port and Stbd
1.2.4 Storeroom (2-14-2-A)
1.2.5 Officer Living Space (2-14-0-L)
1.2.6 Passage (2-40-0-L)
1.2.7 Fan Room (1-17-1-Q)
1.2.8 Fan Room (1-17-2-Q)
1.2.9 Fan Room (1-34-1-Q)
1.2.10 Fan Room (1-34-2-Q)
1.2.11 Fan Room (1-36-0-Q)
1.2.12 Fan Room (1-36-2-Q)
1.2.13 Fan Room (1-38-0-Q)
1.2.14 Fan Room (1-38-2-Q)
1.2.15 Fan Room (1-40-1-Q)
1.2.16 Fan Room (1-40-2-Q)
1.2.17 Fan Room (2-109-4-Q)
1.2.18 Officer Washroom, Water Closet, Shower and Decontamination Station (2-111-4-L)
1.2.19 Augmentee Living Space (4-18-0-L)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.20 Freeboard Weather, Frames between 21 and 22, Port
1.2.21 Passage (4-52-2-L)
1.2.22 Load Center No. 21/22 (4-57-2-Q)
1.2.23 Load Center Switchboard Room No. 2 Annex (4-63-2-Q)
1.2.24 Chief Petty Officer Living Space (4-64-2-L)
1.2.25 Mooring Station No. 2 (4-52-6-Q)
1.2.26 Hot Potable Water Plant No. 2 (4-56-2-E)
1.2.27 Freeboard Weather, Frames between 63 and 65, Port
1.2.28 Passage (4-86-0-L)
1.2.29 Vending Machine Room (4-86-2-Q)
1.2.30 Mail Bag Storeroom (4-91-2-A)
1.2.31 SR (4-90-2-L)
1.2.32 IC and Gyro Room No. 2 (5-86-0-C)
1.2.33 Laundry Receiving and Issue Room (5-89-2-A)
1.2.34 Ship Fitter STRM (5-86-6-A)
1.2.35 Void (4-86-4-V)
1.2.36 Freeboard Weather, Frames between 86 and 94, Port
1.2.37 Passage (4-121-6-L)
1.2.38 Machine Shop (4-124-0-Q)
1.2.39 Metalsmith Shop (4-133-2-Q)
1.2.40 Physical Fitness Room (5-121-2-L)
1.2.41 SR (3-129-2-L)
1.2.42 DCRS 1A (3-131-2-Q)
1.2.43 Passage (4-109-01-L)
1.2.44 SR (4-113-2-L)
1.2.45 SR (4-109-8-L)
1.2.46 Secondary Damage Control and After Repair 3 (4-115-4-Q)
1.2.47 Crew Washroom, Shower and Decontamination Station (5-112-2-L)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.48 Crew Washroom, Water Closet, Shower and Decontamination Station (5-109-2-L)
1.2.49 Freeboard Weather, Frames between 112 and 117, Port
1.2.50 Void (4-109-10-V)
1.2.51 Passage (3-121-0-L)
1.2.52 Passage (3-133-4-L)
1.2.53 Stern Mooring Station (3-143-0-Q)
1.2.54 Tactical System Maintenance (2-133-4-Q)
1.2.55 Nixie Equipment Room (2-147-0-Q)
1.2.56 CIWS 20MM Magazine No. 2 (2-147-1-M)
1.2.57 Second Deck Weather, Frames between 148 and 150, Port and Stbd
1.2.58 Main Deck Weather, Frames between 61 and 62, Port and Stbd
1.2.59 Passage (1-62-1-L)
1.2.60 Ceremonial Passage (1-64-0-L)
1.2.61 25MM Magazine (1-62-2-M)
1.2.62 Fan Room (1-62-3-Q)
1.2.63 01 Level Weather, Frames between 62 and 64, Port and Stbd
1.2.64 Passage (01-67-01-L)
1.2.65 Captain’s Passage (01-67-0-L)
1.2.66 Captain’s Bath (01-64-0-L)
1.2.67 AFFF STA No. 2 (4-132-2-Q)
1.2.68 Passage (4-98-6-L)
1.2.69 Passage (4-76-4-L)
1.2.70 Personnel Office (4-76-6-Q)
1.2.71 AFFF STA No. One (4-83-1-Q)
1.2.72 Passage (4-76-3-L)
1.2.73 DC Central (4-81-1-Q)
1.2.74 Passage (4-52-1-L)
1.2.75 Passage (4-52-2-L)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.76 Crew Messroom (4-40-0-L)
1.2.77 Crew & Troop Messroom & FWD Battle Dressing STA (4-30-0-L)
1.2.78 Passage (4-27-0-L)
1.2.79 Quarterdeck & Passage (3-64-0-L)
1.2.80 Passage (3-52-0-L)
1.2.81 Passage (3-40-2-L)
1.2.82 Passage (3-30-01-L)
1.2.83 Passage (2-64-0-L)
1.2.84 Ceremonial Passage (1-64-0-L)
1.2.85 Passage (01-67-01-L)
1.2.86 Passage (02-67-0-L)
1.2.87 C7F Force Protection Office (02-64-0-Q)
1.2.88 Pilot House (03-64-0-C)
1.2.89 Disbursing Office (4-79-2-Q)
1.2.90 Ship Fitting Storeroom (5-86-6-L)
1.2.91 Fan Room (3-60-4-Q)
1.3 Identification:
1.3.1 Quantity (One Lot), CMWD System Piping Group One
Remarks: See Sheet 2 through 4 of 2.5, 2.6, 2.12, and 2.13 for details
1.3.1.1 Quantity (One EA), CMWD Group One Sprinkling 4-21-8 Pressure Switch Root Valve Mfr Id: 803-4384536-11A2AF Type: Globe, In-Line Stop, Union End Size: 0.25-Inch IPS Item No: V5 on 2.6
1.3.2 Quantity (One Lot), CMWD System Piping Group 2
Remarks: See 2.7, Sheet 3 of 2.11, and 2.12 for details
1.3.2.1 Quantity (One EA), CMWD Group 2 Sprinkling 4-63-8 Pressure Switch Root Valve Mfr Id: 803-4384536-11A2AF Type: Globe, In-Line Stop, Union End Size: 0.25-Inch IPS Item No: V5 on 2.7
1.3.3 Quantity (One Lot), CMWD System Piping Group 3
Remarks: See 2.8, 2.12, 2.14, and Mapping Plan Enclosure-05 for details
1.3.4 Quantity (One Lot), CMWD System Piping Group 4
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Remarks: See 2.9, Sheet 5 (Plan 38-A) of 2.5, Sheet 2 of 2.11, and 2.12 for details
1.3.5 Quantity (One Lot), CMWD System Piping Group 3A
Remarks: See 2.10, 2.12, and Mapping Plan Enclosure-05 for details
1.3.6 Quantity (One Lot), Plumbing Drain Piping
Remarks: See Sheet 4 (Plan 27-A and 30-A) of 2.7 for details
1.3.7 Quantity (One EA), Power System for CMWD Piping System
Remarks: See 2.21 for details
1.3.8 Quantity (One EA), Interior Communication System for CMWD Piping System Remarks: See 2.22 for details
1.3.9 Quantity (One EA), Lighting System Power Source for Alarm Switchboard Remarks: See 2.23 for details
1.3.10 Quantity (One Lot), Structural Work for S/A 81205K CMWD Piping System Remarks: See Engrg Inst Enclosure-01, 2.3, and 2.4 for detail
1.3.11 Quantity (35 SF), Wear Resistant Deck Tile Covering System in 4-121-6-L [Existing] Remarks: See Sketch Enclosure-02 for location detail
1.3.12 Quantity (35 SF), Chemical-Resistant Floorings System in 4-121-6-L Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake Remarks: See Sketch Enclosure-02 for location detail
1.3.13 Quantity (40 SF), Fourth Deck Plating in 4-121-6-L, Frames between 130 and 133, including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level, Port
Remarks: See Sketch Enclosure-02 for location detail
1.4 Security Classification:
1.4.1 Spaces - 1.2.2, 1.2.56, and 1.2.61.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.5.3 Dry Dock Work.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
7/21/2026
10/9/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
3 DWG 613-
8506634
ARRANGEMENT MODIFICATIONS
COUNTERMEASURE
WASHDOWN UPGRADE DC
CENTRAL (4-81-1-Q)
A Y AL
L
4 DWG 113-
8506635
FOUNDATION MODIFICATIONS
COUNTERMEASURE
WASHDOWN UPGRADE
A Y AL
L
5 DWG 506-
8506467
WDCM SYSTEM MODIFICATION
ADDITIONAL WDCM NOZZLES
FWD FRAME 113
A Y AL
L
6 DWG 506-
8507855
CMWD SYSTEM MODIFICATION
CONTROL VALVE INSTL - GROUP
1 BERTHING (4-18-2-L)
A Y AL
L
7 DWG 506-
8507856
CMWD SYSTEM MODIFICATION
CONTROL VALVE INSTL - GROUP
2 PASSAGE (4-52-2-L)
A Y AL
L
8 DWG 506-
8507857
CMWD SYSTEM MODIFICATION
CONTROL VALVE INSTL - GROUP
3 PASSAGE (4-86-0-L)
A Y AL
L
9 DWG 506-
8507858
CMWD SYSTEM MODIFICATION
CONTROL VALVE INSTL - GROUP
4 PASSAGE (4-121-4-L)
A Y AL
L
10 DWG 506-
8507859
CMWD SYSTEM MODIFICATION
CONTROL VALVE INSTL - GROUP
3A PASSAGE (4-109-01-L)
A Y AL
L
11 DWG 506-
8507860
CMWD SYSTEM MODIFICATION
ADDITIONAL WDCM NOZZLES
A Y AL
L
12 LAR
PSNSIMF-
0361-24
BLUE RIDGE (LCC19)
WASHDOWN CONTROL VALVE
MATERIAL CHANGES
- Y AL
L
13 LAR SRFY-
0252-24
S/A 81205 DWG DISCREPANCY
FOR CMWD PP WORK
- Y AL
L
14 LAR SRFY-
0255-24
S/A 81205 DWG DISCREPANCY
FOR CMWD PP WORK
- Y AL
L
15 PDD 100-
ELM-250136
INSTL OF PATCH FOR REMOVAL
PP INCID TO SCD 11205
- Y AL
L
16 DWG 506-
2492277
AGC19 WASHDOWN SYS-DIAG-
ARR
A Y AL
L
17 DWG 506-
6307896
AFFF SYSTEM UPDATE FM HELO
CM WASHDOWN PP
INSTALLATION
- Y AL
L
18 PDD 505-
ELM-150925
WELD SIZE OF SOCKET
WELDING.
- Y AL
L
19 DWG 810-
4714432
STD Pipe Hangers Fabrication
DETS & INSTL
L N
20 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
21 DWG 302-
8507931
POWER SYSTEM INSTALLATION
WASH DOWN COUNTER
MEASURE DECK HOUSE AND
CIWS
A Y AL
L
22 DWG 401-
8516554
IC CKT CM, FR, AND HF ALARM
INSTL WDCM
A Y AL
L
23 DWG 303-
8516261
LIGHTING SYSTEM
MODIFICATIONS WDCM ALARM
A Y AL
L
24 DWG 113-
5293062
FDN - MISC ELECTRICAL
EQUIPMENT (SHOCK)
E Y AL
L
25 DWG 302-
8435746
LCC19 60Hz Power Distribution One- Line
A Y 23
26 DWG 803-
4384536
Valves, BRZ, 1/4" - 2" Union End Globe, In-Line & ANG, Stop, Stop Check & Needle
N N
27 TM 0948-LP-
012-5000
Standard Navy Valves 32 N
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
28 DWG 506-
2492278
WASHDOWN SYS - DIAG MATL
SPEC
B N
29 TM S9086-
RK-STM-
010/CH-505
Piping Systems 6 N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish each structural work for S/A 81205K listed in 1.3.10 in accordance with Enclosure-01, 2.3, and 2.4.
5.1.1 Accomplish the requirement of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2 Accomplish the requirements for removal, installation, and modification of each system listed in 1.3.7 through
1.3.9 in accordance with 2.21 through 2.23, using 2.24 and Sheet 235 of 2.25 for guidance.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3 Prepare each new valve listed in 1.3.1.1 and 1.3.2.1 for installation, using 2.6, 2.7 and 2.26 for guidance.
5.3.1 Accomplish a bonnet ring torque check and tighten each bonnet ring of each new valve in accordance with Table 4.3.5-10 of 2.27, using 2.26 for guidance.
5.3.1.1 Torque of each bonnet ring of each new valve is 18 to 20 foot pounds.
5.3.2 Accomplish a shop test of each new valve, using 2.26, 2.28 and 2.29 for guidance.
5.3.2.1 Shop test equipment must conform to the requirements in Paragraph 505-11.1.3 of 2.29.
5.3.2.2 Accomplish a mechanical joint tightness test of each new valve for body-to-bonnet joint tightness with stem in the half-open position, using clean fresh water at 150 PSIG (not less than 150 PSIG and not more than 153 PSIG) for a minimum of 3 minutes. Allowable external leakage: None.
(V) "MECHANICAL JOINT TIGHTNESS TEST"
5.3.2.3 Document each shop test result on QA Form 28 Enclosure-03-1.
5.4 Accomplish modification of CMWD piping of S/A 81205K listed in 1.3.1 through 1.3.5 in accordance with 2.5 through 2.15, using 2.16 through 2.19 for guidance.
5.4.1 Remove existing, fabricate, and install new each plumbing drain piping listed in 1.3.6 in accordance with 2.7.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.4.2 Remove each existing and install new pipe hanger in accordance with 2.5 through 2.11, using 2.19 for guidance.
5.4.3 Bend each new pipe in accordance with 2.20.
5.4.4 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, and B, Lines One through 10.
5.4.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new and disturbed CMWD piping systems.
5.4.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-04-1 through Enclosure-04-5.
5.4.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4.6.1 Accomplish nondestructive testing in accordance with Line 9.
5.4.6.2 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-06-1 and Enclosure-06-2.
Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.4.6.3 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-05.
5.4.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.4.7.1 Document the test on QA Form 17 Enclosure-07-1.
5.4.8 Accomplish clad weld of penetration sleeve on shell plating in accordance with 2.8 and 2.10.
5.4.8.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.4.8.2 Accomplish nondestructive testing in accordance with Line 10.
5.4.8.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-06-3 and Enclosure-06-4.
Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.4.8.4 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-05.
5.4.9 Accomplish the requirements of 009-71 of 2.1 for a static head pressure test of each new CMWD system drain piping listed in 1.3.1 through 1.3.5, using clean, fresh water for a minimum of 30 minutes. Allowable leakage: None.
5.4.10 Accomplish flow check of CMWD system drain piping listed in 1.3.1 through 1.3.5 using clean fresh water.
Allowable external leakage: None.
(V)(G)”FLOW CHECK”
5.4.11 Accomplish flow check of plumbing drain piping listed in 1.3.6 using clean fresh water. Allowable external leakage: None.
(V)(G)”FLOW CHECK”
5.4.12 Cycle each valve from fully closed to fully open to fully closed 4 times. Allowable binding: None.
(V) “VALVE CYCLING”
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.5 Accomplish the requirements of 009-26 of 2.1, including Attachment C, for removal of each existing equipment listed in 1.3.11 and installation of each new equipment listed in 1.3.12.
5.5.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.13. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 234 S. Ito, 243-4297
Planner: Code 231B R. Takagi, 243-9982 Planner: Code 232 K. Nakamura, 070-7787-1977 Planner: Code 233 Y. Kimura, 080-6845-2423 Engineer: Code 250 K. Matsunari, 243-5816 Engineer: Code 260 K. Sakai, 243-4342
5.7.2 Program Manager’s Representative (PMR) will be onsite during install and testing.
PMR: Mr Edward Twigg, (315) 243-4242 E-mail Address: Edward.i.twigg.ctr@us.navy.mil
5.7.3 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.4 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkhead normally used to control air flow in the event of a shipboard fire. A non- flammable closure is required in accordance with COMNAVDEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.5 Opening, initial cleaning, and closing of each space listed in 1.2.35 and 1.2.50 will be covered by following TGI No(s).
Void (4-86-4-V): 3819P12381 (KTR TGI) Void (4-109-10-V): 3819P12382 (KTR TGI)
5.7.6 Preservation work for new and disturbed surfaces of each space listed in 1.2.35 and 1.2.50 will be covered by following TGI No(s).
Void (4-86-4-V): 3819P12381 (KTR TGI) Void (4-109-10-V): 3819P12382 (KTR TGI)
5.7.7 Preservation work for new and disturbed exterior surfaces of freeboard will be covered by TGI No.
3819P11001A01 (KTR TGI).
5.7.8 JCN EXSA-ZCD2 is related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 All GFM listed in each S/A drawing will be provided as kitted material by SRF-JRMC.
5.8.2 SRF-JRMC will provide GFM listed in Appendix “M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P52302S02)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utilities service, electrical.
5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s).
5.9.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
S/A 81205K CMWD PP AY A 0 0
CU PHASE TITLE:
F/O - (RE) S/A 81205K, ACOOMPLISH MODS OF CMWD PP
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMWD 2-F-0-Q PP CMWD 4-109-8-L PP CMWD 4-109-01-L PP CMWD 4-113-2-L
PP CMWD 4-115-4-Q PP PLMB DR 4-52-2-L PP CMWD 2-14-2-A PP CMWD 2-14-O-
L PP CMWD 2-40-0-L PP CMWD 2-109-4-Q PP CMWD 2-111-4-L PP CMWD
2-133-4-Q PP CMWD 2-147-0-Q PP CMWD 2-147-1-M PP CMWD 01 LVL WEATHER PP
CMWD 3-121-0-L PP CMWD 3-133-4-L PP CMWD 3-143-0-Q PP CMWD 1-17-1-
Q PP CMWD 1-17-2-Q PP CMWD 1-34-1-Q PP CMWD 1-34-2-Q PP CMWD
1-36-0-Q PP CMWD 1-36-2-Q PP CMWD 1-38-O-Q PP CMWD 1-38-2-Q PP
CMWD 1-40-1-Q PP CMWD 1-40-2-Q PP CMWD 1-62-1-L PP CMWD 1-64-0-
L PP CMWD 1-62-2-M PP CMWD 1-62-3-Q PP CMWD 01-67-0-L PP CMWD
01-67-01-L PP CMWD 01-64-0-L PP CMWD 4-121-6-L PP CMWD 4-124-0-Q PP
CMWD 4-133-2-Q PP CMWD 4-86-4-V PP CMWD 2ND DK WEA (P) PP CMWD 2ND
DK WEA (S) PP CMWD MN DK WEATHER PPVOID 4-86-4-V VD CMWD 1-C-0-Q PP CMWD
4-86-2-Q PP CMWD 4-18-0-L PP CMWD 4-52-2-L PP CMWD 4-57-2-Q PP
CMWD 4-63-2-Q PP CMWD 4-64-2-L PP CMWD 4-86-0-L PP CMWD 4-90-2-
L PP CMWD 4-91-2-A PP CMWD 3-129-2-L PP CMWD 3-131-2-Q PP CMWD
5-86-0-C PP CMWD 5-89-2-A PP CMWD 5-86-6-A PP CMWD 5-121-2-L PP
CMWD 5-112-2-L PP CMWD 5-109-2-L PP PP 4-132-2 PA (4-132-2)-4P-A CB
(4-132-2)-4P-B CB (4-84-1)-4P-C CB (4-84-1)-4P-D CB (4-83-1)-1L-H C- CKT CM
IC IC/SM-10 SB 4-81-1-Q SB IC/SM-20 SB 4-81-1-Q SB (4-132-2)-4P-C C- (4-132-2)-4P-D C- (4-132-2)-4P-E C- (4-84-1)-4P-C C- (4-84-1)-4P-D C- (4-132-2)-4P-A C- (4-132-2)-4P-B
C- CMPT 4-86-0-L MSCMPT 4-121-6-L MS CMPT 4-115-4-Q MS SHELL PLATING
PORT MS VOID 4-109-10-V VDCMPT 2-111-4-L MS CMPT 4-132-2-Q MS CMPT 4-86-2-Q
MS CMPT 03-64-0-C MS CMPT 4-63-2-Q MS CMPT 4-109-01-L MS CMPT 2-109-4-
Q MS CMPT 5-112-2-L MS CMPT 5-86-6-A MSCMPT 4-18-0-L MSCMPT 4-52-2-L MS
CMPT 4-81-1-Q MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3919P52302A01-Engrg Inst.pdf) saved on 19-FEB-2025 0000.
2. ENCLOSURE-02 (3819P52302A01-Sketch.pdf) saved on 19-FEB-2025 0000.
3. ENCLOSURE-03 (3819P52302A01-QA28-01.docx) saved on 19-FEB-2025 0000.
4. ENCLOSURE-04 (3819P52302A01-QA28-02.docx) saved on 19-FEB-2025 0000.
5. ENCLOSURE-05 (3819P52302A01-Map.pdf) saved on 19-FEB-2025 0000.
6. ENCLOSURE-06 (3819P52302A01-QA20.pdf) saved on 19-FEB-2025 0000.
7. ENCLOSURE-07 (3819P52302A01-QA17.pdf) saved on 19-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI ,YASUHIKO
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P52302 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish modification of countermeasure washdown piping of S/A 81205K.
Location of Work:
Anchor and Line Handling Space (2-F-0-Q) CIWS Local Control Room, Storeroom and Workshop No. One (1-C-0-Q)
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
CU PHASE DESCRIPTION:
Main Deck Weather, Frames between B and C, Port and Stbd Storeroom (2-14-2-A) Officer Living Space (2-14-0-L) Passage (2-40-0-L) Fan Room (1-17-1-Q) Fan Room (1-17-2-Q) Fan Room (1-34-1-Q) Fan Room (1-34-2-Q) Fan Room (1-36-0-Q) Fan Room (1-36-2-Q) Fan Room (1-38-0-Q) Fan Room (1-38-2-Q) Fan Room (1-40-1-Q) Fan Room (1-40-2-Q) Fan Room (2-109-4-Q) Officer Washroom, Water Closet, Shower and Decontamination Station (2-111-4-L) Augmentee Living Space (4-18-0-L) Freeboard Weather, Frames between 21 and 22, Port Passage (4-52-2-L) Load Center No. 21/22 (4-57-2-Q) Load Center Switchboard Room No. 2 Annex (4-63-2-Q) Chief Petty Officer Living Space (4-64-2-L) Mooring Station No. 2 (4-52-6-Q) Hot Potable Water Plant No. 2 (4-56-2-E) Freeboard Weather, Frames between 63 and 65, Port Passage (4-86-0-L) Vending Machine Room (4-86-2-Q) Mail Bag Storeroom (4-91-2-A)
SR (4-90-2-L)
IC and Gyro Room No. 2 (5-86-0-C) Laundry Receiving and Issue Room (5-89-2-A) Ship Fitter STRM (5-86-6-A) Void (4-86-4-V) Freeboard Weather, Frames between 86 and 94, Port Passage (4-121-6-L) Machine Shop (4-124-0-Q) Metalsmith Shop (4-133-2-Q) Physical Fitness Room (5-121-2-L)
SR (3-129-2-L)
DCRS 1A (3-131-2-Q)
Passage (4-109-01-L)
SR (4-113-2-L)
SR (4-109-8-L)
Secondary Damage Control and After Repair 3 (4-115-4-Q) Crew Washroom, Shower and Decontamination Station (5-112-2-L) Crew Washroom, Water Closet, Shower and Decontamination Station (5-109-2-L) Freeboard Weather, Frames between 112 and 117, Port Void (4-109-10-V) Passage (3-121-0-L) Passage (3-133-4-L) Stern Mooring Station (3-143-0-Q) Tactical System Maintenance (2-133-4-Q) Nixie Equipment Room (2-147-0-Q) CIWS 20MM Magazine No. 2 (2-147-1-M) Second Deck Weather, Frames between 148 and 150, Port and Stbd
FOUO
J-3
SHIP: LCC-19 CHG/VER: 0/0
CU PHASE DESCRIPTION:
Main Deck Weather, Frames between 61 and 62, Port and Stbd Passage (1-62-1-L) Ceremonial Passage (1-64-0-L) 25MM Magazine (1-62-2-M) Fan Room (1-62-3-Q) 01 Level Weather, Frames between 62 and 64, Port and Stbd Passage (01-67-01-L) Captain’s Passage (01-67-0-L) Captain’s Bath (01-64-0-L) AFFF STA No. 2 (4-132-2-Q) Passage (4-98-6-L) Passage (4-76-4-L) Personnel Office (4-76-6-Q) AFFF STA No. One (4-83-1-Q) Passage (4-76-3-L) DC Central (4-81-1-Q) Passage (4-52-1-L) Passage (4-52-2-L) Crew Messroom (4-40-0-L) Crew & Troop Messroom & FWD Battle Dressing STA (4-30-0-L) Passage (4-27-0-L) Quarterdeck & Passage (3-64-0-L) Passage (3-52-0-L) Passage (3-40-2-L) Passage (3-30-01-L) Passage (2-64-0-L) Ceremonial Passage (1-64-0-L) Passage (01-67-01-L) Passage (02-67-0-L) C7F Force Protection Office (02-64-0-Q) Pilot House (03-64-0-C) Disbursing Office (4-79-2-Q) Ship Fitting Storeroom (5-86-6-L) Fan Room (3-60-4-Q)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 SFTR , WELD , SMTL , PNTR , RGRS , QA , INSL 22 KE PC
5.2 ELEC , SFTR , WELD , QA 22 KE PC
5.3 IMCH 22 KE PC
5.4 PFTR , WELD , OMCH , ELEC , RGRS , SFTR , INSL ,
PNTR , QA , SMTL , CARP
22 KE PC
5.5 CARP , PNTR , QA 22 KE PC
5.6 PNTR , QA 22 KE PC
Piping Work CFM: for marine chemist cost, fire watches cost, tank watch cost, lead sampling and analysis cost, asbestos sampling and analysis cost for pipe lagging, air compressor rental/fuel oil cost, pipe/flat bar/bolt/nut and liner for pipe hangers, all paints, misc as plastic bag/sheet, covering material, ---continue to below---
22 MQ CS
---continued from above---brazing/welding rods, electrodes, tapes, gases, saw blades, grinding discs, and other consumable.
22 MQ CS
FOUO
J-4
SHIP: LCC-19 CHG/VER: 0/0
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Structural Work CFM: for all deck covering, paints, thinners, fire watch cost, confined space watch cost, asbestos sampler and analysis cost for compartment insulation, lead sampling/ analysis cost, air compressor rental cost and fuel oil cost for air hose test, PT and MT inspection cost, ---continue to below---
22 MQ CS
---continued from above---and misc such as electrode, gases, temporary covering materials, and other consumables.
22 MQ CS
Machinery Work CFM: for misc (plastic sheets/bags and other consumable).
22 MQ CS
Electrical Work CFM: for asbestos sampling and analysis cost for cable penetration, plastic bags, terminal lugs, fasteners, insulation tapes, cable banding materials, covering materials, fire watch cost, and other consumables.
22 MQ CS
Preservation Work CFM: for all deck covering, paints, thinners, grits including disposal cost, bond coat, underlayment, grout, alcohol, color flake, color chip, and seal coat, Sampler/Analyze asbestos and lead, and MISC such as covering material and other consumable.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
S/A 81205K CMWD PP AY A 0 0
CU PHASE TITLE:
F/O - (RE) S/A 81205K, ACOOMPLISH MODS OF CMWD PP
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P52302 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M INSULATI, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9Q 5640 008096312 NA 4 N 50455376 22/EA
101 M INSULATI, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9Q 5640 008096315 NA 4 N 50455378 5/EA
102 M SOUND CO, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9Q 5640 007565866 NA 4 N 50455381 10/EA
103 M INSULATI, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 2510 016490178 NA 4 N 50455198 3/EA
104 M CAP,SNAP, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 5325 007377648 NA 4 N 50455199
100/EA
105 M ADHESIVE, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 50455119 1/GL
106 M TAPE,TEX, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 50455383 1/RO
107 M TAPE,TEX, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 50455385 1/RO
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
108 M CORK AND, ORIG: C231B,
RIKAKO TAKAGI, 243-9982
ORDERED FOR KTR
9B 5330 002919598 NA 4 N 50455201 1/SH
109 M NUT, HEX, 1/2"-13UNC, NUT,
HEX HD, PLAIN, 1/2"-13UNC-
2B, STEEL, GRADE 2, MIL-DTL-
1222 TYPE I, ANY ZINC
COATING.
ORIG: C231B, RIKAKO TAKAGI,
243-9982
ORDERED FOR KTR
LL7005212 NA 4 N 18/EA
110 M WASHER,FLAT,0.531"ID,
WASHER, FLAT, 1/2"(0.500")
SIZE; 1/2" (0.500"), 0.531"ID X
1.062"OD X 0.095"THK, MATL:
STEEL, ASME B18.21.1, TYPE A
ORIG: C231B, RIKAKO TAKAGI,
243-9982
ORDERED FOR KTR
LL4945815 NA 4 N 18/EA
200 M RUBBER SHEET SOLID, ORIG:
C232 K. NAKAMURA, 070-7787-
ORDERED FOR KTR
FOR VLV CMWD COV 4-131-8
9B 5330 014905051 NA 4 N 50455214 1/SH
300 M STUD, WELDING, ORIG: C233
Y. KIMURA
ORDERED FOR KTR
9B 5307 LL9100490 NA 4 N 50457626 20/EA
301 M STUD,WELDING, ORIG: C233 Y.
KIMURA
ORDERED FOR KTR
9B 5307 012931818 NA 4 N 50455465 30/EA
302 M STUD, WELDING, ORIG: C233
Y. KIMURA
ORDERED FOR KTR
9B 5307 LL9100491 NA 4 N 50457627 50/EA
400 M SILICA PIPE COVER, SILICA
PIPE COVER, 1/2 INCH IPS X 2-
1/2 INCH THK X 36 INCH LG,
NON-ASBESTOS
ORDERED FOR KTR
C234 S.ITO 243-4297
LL6995234 NA 4 N 2/EA
401 M CEMENT,INSULATION,H,
ORDERED FOR KTR
C234 S.ITO 243-4297
9Q 5640 002264540 NA 4 Y 50455387 1/BG
402 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455126 1/GL
403 M CLOTH,PLAIN WEAVE,
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 8305 012901776 NA 4 N 50455390 1/RO
404 M INSULATI, SIZE: 4 INCH IPS,
SIZE: 4-1/2 INCH ID X 3/4 INCH
THK X 6FT LG, UI: EA/6FT (ONE
CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607848 NA 4 N 50457438 2/EA
405 M INSULATI, FOR SIZE: 5 INCH
IPS, SIZE: 5-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607849 NA 4 N 50457440 2/EA
FOUO
M-3
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
406 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455130 3/GL
406 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455438 3/GL
407 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 008419773 NA 4 Y 50455179 4/PT
408 M INSULATI, FOR SIZE: 2 INCH
IPS, SIZE: 2-3/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607844 NA 4 N 50457446 2/EA
409 M INSULATI, FOR SIZE: 4 INCH
IPS, SIZE: 4-1/2 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607848 NA 4 N 50457450 2/EA
410 M INSULATI, FOR SIZE: 5 INCH
IPS, SIZE: 5-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607849 NA 4 N 50457453 3/EA
411 M INSULATI, FOR SIZE: 8 INCH
IPS, SIZE: 8-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607851 NA 4 N 50457454 2/EA
412 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455134 4/GL
413 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 008419773 NA 4 Y 50455183 5/PT
414 M INSULATI, FOR SIZE: 5 INCH
IPS, SIZE: 5-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607849 NA 4 N 50457455 2/EA
415 M INSULATI, FOR SIZE: 8 INCH
IPS, SIZE: 8-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
9B 5640 LL9607851 NA 4 N 50457457 2/EA
FOUO
M-4
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
416 M INSULATI, SIZE: 36 INCH W X
48 INCH L X 3/4 INCH THK,
MATL: NON-HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607854 NA 4 N 50457460 2/SH
417 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455143 4/GL
418 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 008419773 NA 4 Y 50455185 5/PT
419 M COUPLING,TUBE, ORDERED
FOR KTR
C234 S.ITO 243-4297
9B 4730 014635857 NA 4 N 50455202 4/EA
420 M COUPLING,TUBE, ORDERED
FOR KTR
C234 S.ITO 243-4297
9B 4730 007225475 NA 4 N 50455203 1/EA
421 M SLEEVE, ORDERED FOR KTR
C234 S.ITO 243-4297
9C 4730 LL4462308 NA 4 N 50457462 2/EA
422 M INSULATI, FOR SIZE: 6 INCH
IPS, SIZE: 6-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607850 NA 4 N 50457464 2/EA
423 M INSULATI, FOR SIZE: 8 INCH
IPS, SIZE: 8-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607851 NA 4 N 50457467 1/EA
424 M INSULATI, SIZE: 36 INCH W X
48 INCH L X 3/4 INCH THK,
MATL: NON-HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607854 NA 4 N 50457470 2/SH
425 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455147 4/GL
426 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 008419773 NA 4 Y 50455188 5/PT
427 M INSULATI, FOR SIZE: 8 INCH
IPS, SIZE: 8-5/8 INCH ID X 3/4
INCH THK X 6FT LG, UI: EA/6FT
(ONE CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607851 NA 4 N 50457471 1/EA
428 M INSULATI, SIZE: 36 INCH W X
48 INCH L X 3/4 INCH THK,
MATL: NON-HALOGEN
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5640 LL9607854 NA 4 N 50457472 2/SH
429 M ADHESIVE, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 8040 002738708 NA 4 Y 50455158 3/GL
430 M ADHESIVE, ORDERED FOR
KTR
9B 8040 008419773 NA 4 Y 50455189 4/PT
FOUO
M-5
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
431 M COUPLING,TUBE, ORDERED
FOR KTR
C234 S.ITO 243-4297
9B 4730 014635857 NA 4 N 50455204 4/EA
432 M SLEEVE, ORDERED FOR KTR
C234 S.ITO 243-4297
9C 4730 LL4462308 NA 4 N 50457473 2/EA
433 M BACKING, ORDERED FOR KTR
9C 4730 LL4326205 NA 4 N 50457475 2/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 S/A 81205K CMWD PP AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P52302 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 S/A 81205K CMWD PP AY A 0
3819P52302A01 ENCLOSURE-01
SHEET 1 OF 13819P52302A01
SKETCH
ENCLOSURE-02
Location Detail for Replacing Deck Covering in Passage (4-121-6-L)
PLAN VIEW
PASSAGE, FR 127 – 133, PORT
FWD
Passage 4-121-6-L
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P52302A01 ENCLOSURE-03-1 TOTAL 1
SHOP TEST RECORD Page 1 of 2
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZCD2 KTR N/A New CMWD Group One Sprinkling 4-21-8 Pressure Switch Root Valve
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 506-2492278, Rev. B
B. TM S9086-RK-STM-010/CH-505, Rev. 6
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
USED
PRESSURE
ACTUAL
MINIMUM
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
J 5.3.2.2
Mechanical Joint Tightness Test
A,B Clean Fresh Water
150 PSIG 3 Minutes Minimum None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
3819P52302A01 ENCLOSURE-03-1 TOTAL 1
SHOP TEST RECORD Page 2 of 2
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC-19 EXSA-ZCD2 KTR N/A New CMWD Group 2 Sprinkling 4-63-8 Pressure Switch Root Valve
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. DWG 506-2492278, Rev. B
B. TM S9086-RK-STM-010/CH-505, Rev. 6
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
J 5.3.2.2
Mechanical Joint Tightness Test
A,B Clean Fresh Water
150 PSIG 3 Minutes Minimum None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-04-1 TOTAL 5
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZCD2 KTR N/A CMWD SYSTEM PIPING GROUP ONE
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 506-8506467 Rev. A
C. DWG 506-8507855 Rev. A
D. LAR SRFY-0252-24 Rev “-“
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.4.5 for 1.3.1 A,B, C,D
Clean Fresh Water 225 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-04-2 TOTAL 5
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZCD2 KTR N/A CMWD SYSTEM PIPING GROUP 2
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 506-8507856 Rev. A
C. DWG 506-8507860 Rev. A
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.4.5 for 1.3.2 A,B, C
Clean Fresh Water 225 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-04-3 TOTAL 5
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZCD2 KTR N/A CMWD SYSTEM PIPING GROUP 3
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 506-8507857 Rev. A
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.4.5 for 1.3.3 A,B Clean Fresh Water 225 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-04-4 TOTAL 5
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZCD2 KTR N/A CMWD SYSTEM PIPING GROUP 4
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 506-8507858 Rev. A
C. DWG 506-8507860 Rev. A
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.4.5 for 1.3.4 A,B, C
Clean Fresh Water 225 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-04-5 TOTAL 5
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS BLUE RIDGE LCC19 EXSA-ZCD2 KTR N/A CMWD SYSTEM PIPING GROUP 3A
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 506-8507859 Rev. A
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.4.5 for 1.3.5 A,B Clean Fresh Water 225 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
3819P52302A01 ENCLOSURE-05 3
SHEET 2 OF 33819P52302A01
MAPPING PLAN
ENCLOSURE-05
PLAN VIEW
FIFTH DECK, FR 112 – 116, PORT
DETAIL 2-A
SHELL PENETRATION
HJ-3
SHELL
SEE DETAIL 2-A
SHELL AT 5TH DECK
SHELL AT 4TH DECK
SHEET 3 OF 33819P52302A01
MAPPING PLAN
ENCLOSURE-05
PLAN VIEW
FIFTH DECK, FR 88 – 93, PORT
DETAIL 3-A
SHELL PENETRATION
HJ-4
SHELL
SEE DETAIL 3-ASHELL AT 5TH DECK
SHELL AT 4TH DECK
3819P52302A01 ENCLOSURE-06-1 TOTAL 4
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EXSA-ZCD2
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
20 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
SHELL PLTG
9. DWG NO.
100-ELM-250136 REV. “-”
10. CWP STEP NO.
5.4.6.2
11. JOINT ID
HJ-1
12. JOINT DESIGN
B2V.1
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P52302A01 ENCLOSURE-06-1 TOTAL 4
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52302A01 ENCLOSURE-06-2 TOTAL 4
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EXSA-ZCD2
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
20 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
SHELL PLTG
9. DWG NO.
100-ELM-250136 REV. “-”
10. CWP STEP NO.
5.4.6.2
11. JOINT ID
HJ-2
12. JOINT DESIGN
B2V.1
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52302A01 ENCLOSURE-06-2 TOTAL 4
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P52302A01 ENCLOSURE-06-3 TOTAL 4
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EXSA-ZCD2
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
20 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
SHELL PLTG
9. DWG NO.
506-8507859 REV. “A”
10. CWP STEP NO.
5.4.8.3
11. JOINT ID
HJ-3
12. JOINT DESIGN
CLAD WELD
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .