TGI_3819P49501T01_c0v0.pdf

PDF 93 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 5
Solicitation number
N6264925RA058
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) naval vessel, dated 17-OCT-2024. The TGI specifically covers a Volumetric & Balance Test for the Ventilation System (S/A 82269K - KTR), with tasks assigned to contractor (22/KE), quality assurance (33/G1), and support functions (S/F) personnel. The document references technical procedure TP 51211-3-301KTR and involves work to be accomplished and documented according to that reference, with no material list items specified in this particular instruction.

The TGI is part of a larger ship repair and modernization project for the USS Blue Ridge, which involves multiple task group instructions across five bundles of repair, maintenance, and overhaul work. The instruction is marked FOUO (For Official Use Only) and includes administrative details such as preparation by Enomoto, Daisuke and approval by Ohta, Jason Y., with a zone manager of Yaginuma, Takehide, indicating a structured naval maintenance process for the specified ventilation system test.

View the file

Other files

File Type Posted
N6264925RA0580004.pdf PDF
BLR_5C1_SHIPALT_BUNDLE 5 CDRL rev.pdf PDF
TGI_3819P52601_A01_c1v1.pdf PDF
TGI_3819P52302T01_redact.pdf PDF
TGI_3819P49501T01_c0v0.pdf PDF
TGI_3819P51206T07_c0v0_redact.pdf PDF
TGI_3819P51206T01_c0v0_redact.pdf PDF
TGI_3819P51206T04_c0v0_redact.pdf PDF
TGI_3819P51206T05_c0v0_redact.pdf PDF
TGI_3819P49501T02_c0v0.pdf PDF
N6264925RA0580002.pdf PDF
N6264925RA0580003.pdf PDF
TGI_3819P52302A01_redact.pdf PDF
TGI_3819P51206A01_redact.pdf PDF
TGI_3819P51206T03_c0v0_redact.pdf PDF
TGI_3819P51206T02_c0v0_redact.pdf PDF
TGI_3819P49501A01_c0v1.pdf PDF
TGI_3819P25501A01_c0v0.pdf PDF
N6264925RA0580001.pdf PDF
TGI_3819P52302A01_redac(1).pdf PDF
TGI_3819P51206T04_c0v0_redact.pdf PDF
TGI_3819P51206T02_c0v0_redact.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
Attachment V Contract data.pdf PDF
2.01 N6264925RA058 Solicitation.pdf PDF
TGI_3819P51206T03_c0v0_redact.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P49501A01_c0v1.pdf PDF
TGI_3819P51206T01_c0v0_redact.pdf PDF
TGI_3819P51206T05_c0v0_redact.pdf PDF
TGI 3819P25501A01_c0v0.pdf PDF
TGI_3819P51206T07_c0v0_redact.pdf PDF
TGI_3819P52601_A01_c1v1.pdf PDF
TGI_3819P52302T01_redac.pdf PDF
TGI_3819P51206A01_redac_(1).pdf PDF
TGI_3819P49501T02_c0v0.pdf PDF
Exhibit (A) BUNDLE 5 CDR.pdf PDF
Attachment IV RFI.docx DOCX document
Attachment III GFP List_V3.xlsx XLSX spreadsheet
Attachment II Proposal Breakdown Sheet.xlsx XLSX spreadsheet
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

17-OCT-2024 0839

20.14.15.2.9020 (September 2024) ICN: 3819P49501 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-301KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51211

CU PHASE TITLE: VENTILATION SYS (VOL & BAL), S/A 82269K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZBZ9

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ENOMOTO, DAISUKE 246.2 3152437296 02-OCT-2024

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 16-OCT-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZBZ9

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

495G1101

Volumetric & Balance Test for Ventilation System, S/A 82269K - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

17-OCT-2024 0839

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P49501 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51211-3-301KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51211

CU PHASE TITLE: VENTILATION SYS (VOL & BAL), S/A 82269K - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51211-3-301KTR VENTILATION SYS (VOL &

BAL) - KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the volumetric & balance test in accordance with reference, TP 51211-3-301KTR.

22/KE PC N

(G) QA work:

Accomplish/document the volumetric & balance test in accordance with reference, TP 51211-3-301KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the volumetric & balance test in accordance with reference, TP 51211-3-301KTR.

/ EXSA N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P49501 KEY OP: T01